Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
Fecha
|
|
[ 465 ]
�
� |
Compatibility study results of IMT systems with aeronautical telemetry systems in the frequency band 1 429-1 535 MHz, base on aggregate interference scenario
�
� |
Russian Federation
� |
2014-02-12 |
|
[ 464 ]
�
� |
Compatibility study results between IMT systems and aeronautical radionavigation systems in the frequency band 645-694 MHz
�
� |
Russian Federation
� |
2014-02-12 |
|
[ 463 ]
�
� |
Spectrum sharing between radiolocation, aeronautical mobile telemetry, earth exploration satellite services and broadband wireless system using IMT in the band 1 350-1 525 MHz
�
� |
Brazil (Federative Republic of)
� |
2014-02-12 |
|
[ 462 ]
�
� |
Views on certain bands allocated to the FSS and need to establish compatibility conditions between the FSS and wireless systems operating in the adjacent band
�
� |
Brazil (Federative Republic of)
� |
2014-02-12 |
|
[ 461 ]
�
� |
Consideration of the IMT user terminal transmitted power when deriving necessary unwanted emissions in the 1 400-1 427 MHz band, proposed revision to PDNR ITU-R RS.[EESS 1.4 GHz] and to CPM text
�
� |
European Space Agency
� |
2014-02-12 |
|
[ 460 ]
�
� |
Sharing studies between RLANS and EESS (active) in the 5 350-5 470 MHz band under WRC-15 agenda item 1.1
�
� |
European Space Agency
� |
2014-02-12 |
|
[ 459 ]
�
� |
Proposed modifications to framework for a working document towards a preliminary draft Report ITU-R [C-BAND DOWNLINK] - Sharing studies between IMT-Advanced systems and geostationary satellite networks in the fixed-satellite service in the 3 400-4 200 MHz and 4 500-4 800 MHz frequency bands in the WRC study cycle leading to WRC-15
�
� |
Intelsat
,
SES WORLD SKIES
� |
2014-02-12 |
|
[ 458 ]
�
� |
Proposed modifications to working document towards a preliminary draft Report ITU-R [C-BAND UPLINK] - Sharing and compatibility between IMT systems and fixed satellite service networks in the 5 850-5 925 MHz and 5 925-6 425 MHz frequency bands
�
� |
Intelsat
,
SES WORLD SKIES
� |
2014-02-12 |
|
[ 457 ]
�
� |
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1
�
� |
Intelsat
,
SES WORLD SKIES
� |
2014-02-12 |
|
[ 456 ]
�
� |
Necessary guard band for compatibility between radiolocation systems and mobile broadband systems in the 2 700-2 900 MHz
�
� |
THALES Communications
� |
2014-02-12 |
|
[ 455 ]
�
� |
Potential mitigation techniques for radio local area networks and various services in the 5 350-5 470 MHz frequency band
�
� |
Cisco Systems, Inc.
� |
2014-02-12 |
|
[ 454 ]
�
� |
Visibility analysis of EESS (active) systems in the band 5 350-5 470 MHz
�
� |
Cisco Systems, Inc.
� |
2014-02-12 |
|
[ 453 ]
�
� |
Proposed modifications to the working document towards a preliminary draft CPM text for WRC-15 agenda item 1.1 - Sharing and compatibility between digital terrestrial television broadcasting and IMT in the frequency band 470-694/698 MHz
�
� |
C.B.S., Inc.
� |
2014-02-11 |
|
[ 452 ]
�
� |
Proposed modifications to the working document towards preliminary draft new Report ITU-R M./BT.[IMTDTTBSHARECOMPAT] - Sharing and compatibility studies between digital terrestrial television broadcasting (DTTB) and IMT in the 470-694/698 MHz band
�
� |
C.B.S., Inc.
� |
2014-02-11 |
|
[ 451 ]
�
� |
Consideration on frequency bands with regard to WRC-15 agenda item 1.1
�
� |
Germany (Federal Republic of)
� |
2014-02-12 |
|
[ 450 ]
�
� |
Bistatic radars in the 5 GHz-band
�
� |
Germany (Federal Republic of)
� |
2014-02-11 |
|
[ 449 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R M.[IMTDTT700] - Out-of-band emission of IMT mobile stations in the frequency band 694-790 MHz for the protection of the broadcasting service in the frequency band 470-694 MHz in Region 1
�
� |
France
� |
2014-02-11 |
|
[ 448 ]
�
� |
Compatibility assessment between meteorological satellite systems and IMT stations in the 1 695-1 710 MHz band and revision of CPM text
�
� |
European Organisation for the Exploitation of Meteorological Satellites
� |
2014-02-11 |
|
[ 447 ]
�
� |
Updated simulation results on the DTT interference probability at 700 MHz band
�
� |
Nokia Corporation
� |
2014-02-11 |
|
[ 446 ]
�
� |
Elements related to post-processing of Monte Carlo results for 700 MHz
�
� |
Nokia Corporation
� |
2014-02-11 |
|
[ 445 ]
�
� |
Considerations on the frequency ranges 410-430 MHz, 471-698 MHz, 3 700-4 200 MHz and 5 925-6 425 MHz under WRC-15 agenda item 1.1
�
� |
Argentine Republic
� |
2014-02-11 |
|
[ 444 ]
�
� |
Assessment of interference levels and sharing criteria between terrestrial IMT and DTTB system C (ISDB-T) in the frequency range 470-698 MHz under WRC-15 agenda item 1.1
�
� |
Argentine Republic
� |
2014-02-10 |
|
[ 443 ]
�
� |
Summary of results of experience on initial deployment of IMT networks in the 800 MHz band in France
�
� |
France
� |
2014-02-10 |
|
[ 442 ]
�
(Rev.1)� |
Revision of the working document towards a preliminary draft new Report relating to the coexistence between IMT systems and BSS systems in the frequency band 1 452-1 492 MHz
�
� |
Finland
,
France
,
Germany (Federal Republic of)
,
Portugal
,
Sweden
� |
2014-02-11 |
|
[ 441 ]
�
(Rev.1)� |
Revision of the draft CPM text on satellite issues
�
� |
Finland
,
France
,
Germany (Federal Republic of)
,
Portugal
,
Sweden
� |
2014-02-11 |
|
[ 440 ]
�
� |
Agenda item 1.1 - Views on sharing studies between IMT indoor systems and radar systems in the band 3 300-3 400 MHz for WRC-15 agenda item 1.1
�
� |
France
� |
2014-02-10 |
|
[ 439 ]
�
� |
Compatibility study between the potential new MS allocation around the 1 400-1 427 MHz passive band and the radio astronomy service - update with aggregated power
�
� |
France
� |
2014-02-10 |
|
[ 438 ]
�
� |
Sharing study between aeronautical and IMT mobile services in the bands 4 400-5 000 MHz under WRC-15 agenda item 1.1
�
� |
France
� |
2014-02-10 |
|
[ 437 ]
�
� |
Further consideration on RLAN antenna pattern to be used for sharing studies in the 5 350-5 470 MHz band
�
� |
France
� |
2014-02-10 |
|
[ 436 ]
�
(Rev.1)� |
Analysis of dynamic frequency selection (DFS) as mitigation measure for the co-existence of radio local area (RLAN) systems and radiolocation service systems in the 5 350-4 470 MHz and 5 725-5 925 MHz band
�
� |
Austria
,
France
,
Netherlands (Kingdom of the)
� |
2014-02-11 |
|
[ 435 ]
�
� |
Study into the co-existence of mobile broadband systems and radars in the frequency band 1 300-1 350 MHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
2014-02-10 |
|
[ 434 ]
�
� |
Study into the co-existence of mobile broadband systems and radars in the frequency band 2 700-2 900 MHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
2014-02-10 |
|
[ 433 ]
�
� |
The criticality of C-band to the Pacific Islands
�
� |
Papua New Guinea
� |
2014-02-09 |
|
[ 432 ]
�
� |
On the use of the average UE output power for sharing studies
�
� |
France
� |
2014-02-08 |
|
[ 431 ]
�
� |
Analysis of the mitigation techniques propose for protecting EESS (active) systems for interference by RLAN in the band 5 350-5 470 MHz
�
� |
France
� |
2014-02-07 |
|
[ 430 ]
�
� |
Further consideration on RLAN device density to be used for sharing studies in the 5 350-5 470 MHz band
�
� |
France
� |
2014-02-07 |
|
[ 429 ]
�
� |
Proposed modifications to working document on sharing between the mobile service (MS) and the broadcasting service (BS) in the 1 452-1 492 MHz frequency band
�
� |
France
� |
2014-02-07 |
|
[ 428 ]
�
� |
Status of telemetry systems within 1 429-1 535 MHz band
�
� |
France
� |
2014-02-07 |
|
[ 427 ]
�
� |
Sharing studies between aeronautical telemetry terrestrial systems and IMT systems within 1 427-1 492 MHz band
�
� |
France
� |
2014-02-07 |
|
[ 426 ]
�
� |
Draft CPM text for agenda item 1.1
�
� |
France
� |
2014-02-07 |
|
[ 425 ]
�
� |
Coexistence between radiolocation and IMT systems within 1 375-1 400 MHz band
�
� |
France
� |
2014-02-07 |
|
[ 424 ]
�
� |
Sharing studies between RLAN and EESS (active) systems in the band 5 350-5 470 MHz
�
� |
France
� |
2014-02-07 |
|
[ 423 ]
�
� |
Time percentage for use in sharing and compatibility studies involving radar
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
2014-02-07 |
|
[ 422 ]
�
� |
Current Australian views on particular frequency bands
�
� |
Australia
� |
2014-02-07 |
|
[ 421 ]
�
� |
Working document on sharing studies between indoor IMT systems and radar systems in the frequency band 3 300-3 400 MHz for WRC-15 agenda item 1.1
�
� |
Australia
� |
2014-02-07 |
|
[ 420 ]
�
� |
Working document on sharing/compatibility studies of IMT systems with radiolocation systems in the frequency band 1 300-1 400 MHz
�
� |
Australia
� |
2014-02-07 |
|
[ 419 ]
�
� |
Studies on the impact of IMT interference on radar systems with pulse compression operating in the frequency range 2 700-3 100 MHz
�
� |
Australia
� |
2014-02-07 |
|
[ 418 ]
�
� |
Measurements for assessing the impact of OOBE as well as short pulse interferences from IMT user equipment to DTTB reception
�
� |
France
� |
2014-02-05 |
|
[ 417 ]
�
� |
Simulation of potential interference from IMT UL to DTT rooftop fixed reception for determining IMT terminal OOBE regulatory limit
�
� |
France
� |
2014-02-05 |
|
[ 416 ]
�
� |
Proposed changes to Attachment 3 of Annex 5 to Document 4-5-6-7/393, Section 7.1.2 "Scenario 4: C/N+I"
�
� |
France
� |
2014-02-05 |
Resultados :715 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):