Contribuciones ��
�
N�mero �
T�tulo
Origen
AI/Cuesti�n
Filtro...
202/5
205-4/5
212-2/8
214-3/3
217-2/4
221/1
221-1/1
226/5
226/8
230/1
232/5
235/5
237/5
240/5
240/7
240/8
249/5
288/4
35/5
62/5
89/6
96/5
96-2/5
Borrar filtro
Fecha
�
[ 563 ]
�
�
Proposals to PDNR ITU-R M.[UAS-BANDS-EXIST-ALLOC] - Results of compatibility studies between non-ICAO ARNS systems and unmanned aircraft systems in the 960-1 164 MHz band
�
�
Russian Federation
�
�
2010-10-28
�
[ 562 ]
�
�
Proposals to PDRN ITU-R M.[UAS-BANDS-NEW-ALLOC] - Results of compatibility studies between airborne radar (system-6) and unmanned aircraft control station of unmanned aircraft system in the 15.4-15.7 GHz
�
�
Russian Federation
�
�
2010-10-28
�
[ 561 ]
�
�
Studies of sharing feasibility of the MSS with RLS in the frequency band 10.5-10.6 GHZ and also of the MSS with RLS and ARNS in the frequency band 15.43-15.63 GHz
�
�
Russian Federation
�
�
2010-10-28
�
[ 560 ]
�
�
Results of compatibility studies between space surveillance radars and MMs safety systems
�
�
Russian Federation
�
�
2010-10-28
�
[ 559 ]
�
�
Using a special format MMSI in a handheld portable VHF radio with DSC and GNSS
�
�
Telenor ASA
�
�
2010-10-25
�
[ 558 ]
�
�
Proposed review of PDNR ITU-R M.[RLS 3-50 MHz SHARING] (copy to Working Party 5C for information) - The feasibility of sharing sub-bands between oceanographic radars and fixed and mobile services within the 3-50 MHz band
�
�
Canada
�
�
2010-10-25
�
[ 557 ]
�
�
Liaison statement to Working Party 1A (copy for information to Working Parties 3L, 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15)
�
�
WP 7D
�
�
2010-10-15
�
[ 556 ]
�
�
Reply to liaison statement from Working Party 5B - Radar emission measurements in the out of band domain
�
�
WP 1C
�
230/1
�
2010-10-14
�
[ 555 ]
�
�
The study results of Joint Task Group 5-6 and the related work under Resolution 224 (Rev. WRC-07)
�
�
Chairman, SG 5
�
�
2010-10-05
�
[ 554 ]
�
�
Liaison statement to ITU-R Working Party 5B (copy to CIRM, IALA and IEC TC80) - Future revision of Recommendation ITU-R M.1371-4
�
�
International Maritime Organization
�
�
2010-08-05
�
[ 553 ]
�
�
Liaison statement to ITU-R Working Party 5B - Guidance on the use of AIS Application-Specific Messages
�
�
International Maritime Organization
�
�
2010-08-05
�
[ 552 ]
�
�
PDNR M.[RLS_ARNS]
�
�
Ukraine
�
�
2010-07-28
�
[ 551 ]
�
�
PDNR M.[RLS_FSS]
�
�
Ukraine
�
�
2010-07-28
�
[ 550 ]
�
�
PDNR M.[RLS_RAS]
�
�
Ukraine
�
�
2010-07-28
�
[ 549 ]
�
�
Reply liaison statement to Working Party 5B - Compatibility studies between the radiodetermination-satellite service and the radiolocation service
�
�
WP 4C
�
�
2010-07-26
�
[ 548 ]
�
�
Reply liaison statement to WP 5B - Compatibility between 5 GHz radionavigation-satellite service systems and proposed aeronautical mobile (R) services systems in the band 5 000-5 010 MHz
�
�
WP 4C
�
288/4 , 217-2/4
�
2010-07-26
�
[ 547 ]
�
�
Liaison statement to Working Party 5B - Potential interference between the ICAO standard microwave landing system (MLS) operating above 5 030 MHz and planned radionavigation-satellite service (RNSS) in the band 5 000-5 030 MHz
�
�
WP 4C
�
�
2010-07-26
�
[ 546 ]
�
�
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
�
�
WP 1A
�
�
2010-07-22
�
[ 545 ]
�
�
Liaison statement to Working Party 5B - Finalizing the work on the revision of Annex 8 to Recommendation ITU-R SM.1541-2
�
�
WP 1A
�
�
2010-07-21
�
[ 544 ]
�
�
Liaison statement to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5 and 15 for information and/or action if any) - Developments on PLT systems
�
�
WP 1A
�
�
2010-07-16
�
[ 543 ]
�
�
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7B, 7C and 7D - Information on studies related to WRC-12 Agenda item 1.25
�
�
WP 4C
�
�
2010-07-13
�
[ 542 ]
�
�
Liaison statement to ITU-R Working Party 5B - On studies between the space research service (space-to-earth) and the aeronautical mobile service in the 37-38 GHz band
�
�
WP 7B
�
�
2010-07-13
�
[ 541 ]
�
�
Liaison statement to the International Maritime Organization (IMO) for consideration at the sixth session of the Joint IMO/ITU Experts Group meeting and the eighty-eighth session of the Maritime Safety Committee (MSC 88) (Copy to Working Parties 1B and 5B for information) - Draft IMO position on WRC-12 Agenda items concerning matters relating to maritime services
�
�
WP 1A
�
�
2010-07-09
�
[ 540 ]
�
�
Additional guidelines for updating the Recommendations listed in Document 5B/465 (copied to Working Parties 5A, 5C and 5D for information)
�
�
Chairman, SG 5
�
�
2010-07-01
�
[ 539 ]
�
�
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))
�
�
WP 7C
�
�
2010-06-30
�
[ 538 ]
�
�
Liaison statement to the Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Further work on power line telecomunications
�
�
WP 7D
�
221-1/1
�
2010-06-17
�
[ 537 ]
�
�
Liaison statement to Working Party 5B on a PDNR on intelligent transport systems (ITS) guidelines and objectives
�
�
WP 5A
�
�
2010-06-09
�
[ 536 ]
�
�
Liaison statement to Working Party 7B on WRC-12 Agenda item 1.12 (copy to Working Party 5B) - Sharing between the aeronautical mobile and the fixed service in the band 37-38 GHz
�
�
WP 5C
�
�
2010-06-04
�
[ 535 ]
�
�
Reply liaison statement to ITU-R Working Party 5B on sharing between potential aeronautical mobile service applications and the fixed service in the band 37-38 GHz
�
�
WP 5C
�
�
2010-06-04
�
[ 534 ]
�
�
Review of the Study Group 5 Questions assigned to the Working Parties
�
�
Chairman, SG 5
�
�
2010-05-31
�
[ 533 ]
�
�
Draft IMO position on WRC-12 Agenda items concerning matters relating to maritime services
�
�
International Maritime Organization
�
�
2010-05-20
�
[ 532 ]
�
+Ann.1-33 �
Report of the fifth meeting of Working Party 5B (Geneva, 10-21 May 2010)
�
�
Chairman, WP 5B
�
�
2010-05-25
�
[ 531 ]
�
�
Final List of Participants - Working Party 5B (Geneva, 10-21 May 2010)
�
�
Director, BR
�
�
2010-05-21
�
[ 530 ]
�
�
Liaison statement to ITU-R Working Party 5B (copy to Working Party 5A) - Proposed response to Working Party 1A on PLT systems
�
�
WP 5C
�
�
2010-05-19
�
[ 529 ]
�
�
Liaison statement to Working Party 5B on a PDNR on intelligent transport systems (ITS) guidelines and objectives
�
�
WP 5A
�
�
2010-05-17
�
[ 528 ]
�
�
Liaison statement to ITU-R Working Party 5B (copy to Working Party 5C) - Proposed response to Working Party 1A on PLT systems
�
�
WP 5A
�
�
2010-05-17
�
[ 527 ]
�
�
List of documents issued
�
�
BR Study Group Department
�
�
2010-05-07
�
[ 526 ]
�
(Rev.1) �
System characteristics and protection requirements of systems operating under allocations to services that are under the purview of Working Party 5B
�
�
Chairman, WP 5B
�
�
2010-05-06
�
[ 525 ]
�
�
Liaison note to ITU-R Working Party 5B on spectrum requirements for E-Navigation
�
�
International Association of Lighthouse Authorities (IALA)
�
�
2010-05-03
�
[ 524 ]
�
�
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 6, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
�
�
WP 6A
�
�
2010-05-05
�
[ 523 ]
�
�
Recommendation ITU-R M.493-13 on digital selective calling system for use in the Maritime Mobile Service
�
�
United States of America
�
�
2010-04-30
�
[ 522 ]
�
�
Working document toward a draft new Report on near real time exchange of maritime domain information
�
�
United States of America
�
�
2010-04-30
�
[ 521 ]
�
�
Working document towards draft CPM text on WRC-12 Agenda item 1.9
�
�
United States of America
�
�
2010-04-30
�
[ 520 ]
�
�
Working document toward a draft new Report - Future VHF maritime digital communications systems utilizing Recommendation ITU-R M.1842-1
�
�
United States of America
�
�
2010-04-30
�
[ 519 ]
�
�
Working document towards draft CPM text on WRC-12 Agenda item 1.3
�
�
United States of America
�
�
2010-04-30
�
[ 518 ]
�
�
Working document towards a draft new Report ITU-R M.[UAS AND GSO] - Characteristics and performance requirements for unamanned aircraft control links supported by GSO satellites operating between 10 GHz and 31 GHz
�
�
United States of America
�
�
2010-04-30
�
[ 517 ]
�
�
Working document towards a draft new Report - Oceanographic radar interference mitigation techniques - Technical and operational considerations
�
�
United States of America
�
�
2010-04-30
�
[ 516 ]
�
�
Reply liaison statement to ITU-R Working Party 5B - WRC-12 Agenda item 1.4 - Compatibility study between AM(R)S systems and digital sound broadcasting systems operating below 108 MHz
�
�
WP 6A
�
�
2010-05-04
�
[ 515 ]
�
�
Working document towards draft CPM text on WRC-12 Agenda item 1.21
�
�
United States of America
�
�
2010-05-03
�
[ 514 ]
�
�
Proposed modifications to the draft CPM text on WRC-12 Agenda item 1.25 - WRC-12 Agenda items 1.3, 1.21 and 1.25
�
�
Luxembourg
�
�
2010-05-03
Resultados :813 documentos Resultados :�
Anterior �-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
�-�Siguiente
�
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):