International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2024-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2024-07-01)�

ITU-T�SG15

Transport, access and home

Study Period 2022

Meeting� from 2024-07-01 to 2024-07-12

held in Canada [Montreal]

Other Meetings : 2023-11-202023-04-172022-09-19

Results:347 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 998 ]
Detailed ME proposal for G.FIN.NM � China Unicom , Huawei Technologies Co., Ltd. (China) Q3/15 2024-06-17
[ 997 ]
B1T path layer frame format � ADTRAN Holdings Inc. (United States) , China Information Communication Technologies Group Q11/15 2024-06-17
[ 996 ]
The initial thoughts on the protocol of G.WMCI. � China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q3/15 2024-06-17
[ 995 ]
B1T OTN layering � China Information Communication Technologies Group , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) (China) Q11/15 2024-06-17
[ 994 ]
Proposal to add new contents for the draft L.pcc � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q7/15 2024-06-17
[ 993 ]
Proposals to update G.661 about the ROPA � China Unicom , ZTE Corporation (China) Q6/15 2024-06-17
[ 992 ]
(Rev.1)
Considerations on port state decision based on enhanced accuracy TLV � China Information Communication Technologies Group Q13/15 2024-06-17
[ 991 ]
Further considerations about the transceiver for the 4.8T and 6T bands � China Information Communication Technologies Group , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2024-06-17
[ 990 ]
(Rev.1)
Text proposal on use cases and high-level design requirements for G.Suppl-FTS � China Information Communication Technologies Group Q13/15 2024-06-17
[ 989 ]
Proposal of revision of G Suppl. 55 � National Institute of Information and Communications Technology (NICT) (Japan) Q2/15 2024-06-17
[ 988 ]
Text proposal for OTN interfaces in G.781 � China Information Communication Technologies Group Q13/15 2024-06-17
[ 987 ]
Considerations about the system architectures of G.dfos � Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2024-06-17
[ 986 ]
Considerations for out-of-band and in-band sensing wavelength options for new draft ITU-T Rec. G.dfos � Ministry of Communications (India) , Sterlite Technologies Limited (India) Q6/15 2024-06-17
[ 985 ]
Baseline draft on new Recommendation L.nis "Technical and functional requirements for network infrastructures sharing" � Ministry of Communications (India) Q7/15 2024-06-17
[ 984 ]
Modulation formats and transceiver configurations for vHSP � Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) Q2/15 2024-06-17
[ 983 ]
Text proposal for WP1 TP on Broadband access & in-premises network � Nokia Corporation (Finland) Q4/15 2024-06-17
[ 982 ]
Considerations on B1T OTN � China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q11/15 2024-06-17
[ 981 ]
(Rev.1)
G.supPONsecurity: Text Proposal for Duplicate-ONU-SN issue � Nokia Corporation (Finland) Q2/15 2024-06-17
[ 980 ]
M+1 fgOTN protection application in power grid communication network � Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China Q11/15 2024-06-17
[ 979 ]
Mapping of multiple E1 signals into fgOPUflex(1) proposal � Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China Q11/15 2024-06-17
[ 978 ]
G.709 AM3 corrigendum � Huawei Technologies Co., Ltd. (China) Q11/15 2024-06-17
[ 977 ]
Considerations on the B1T frame structure � Huawei Technologies Co., Ltd. (China) Q11/15 2024-06-17
[ 976 ]
Analysis and considerations of B1T LO and HO ODU path � China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) Q11/15 2024-06-17
[ 975 ]
(Rev.1)
Update and revise electrical characteristics for optical electrical hybrid cable � China Information Communication Technologies Group Q5/15 2024-06-17
[ 974 ]
Port recognition for ODN visualization � ZTE Corporation (China) Q2/15 2024-06-17
[ 973 ]
(Rev.1)
G.sup.VHSP: some proposals for the coherent PON � China Information Communication Technologies Group Q2/15 2024-06-17
[ 972 ]
(Rev.1)
G.sup.VHSP: several technical variants for IMDD TDM PON � China Information Communication Technologies Group Q2/15 2024-06-17
[ 971 ]
Proposed revisions for Recommendation G.652 � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q6/15, Q5/15, Q2/15 2024-06-17
[ 970 ]
Considerations for Wavelength Band Expansion in 800G DWDM Systems � KDDI Corporation (Japan) , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q6/15 2024-06-17
[ 969 ]
Additional details about WTR for G.8275.1 and G.8275.2 � Ciena Canada Q13/15 2024-06-16
[ 968 ]
Clarification on T-GM behavior in Acquiring state � Ciena Canada Q13/15 2024-06-16
[ 967 ]
Field trial results about C6T+L6T 800G DWDM applications � China Information Communication Technologies Group , China Telecommunications Corporation Q6/15 2024-06-15
[ 966 ]
Security Threats Proposal for FTTR-4B � Huawei Technologies Co., Ltd. (China) Q3/15 2024-06-15
[ 965 ]
(Rev.1)
G.988: Traffic descriptor update for 50G-PON � Futurewei Technologies Inc. (United States) , Huawei Technologies Co., Ltd. (China) Q2/15 2024-06-15
[ 964 ]
(Rev.1)
Proposal update to clause 8.4.9 of ITU-T G.Sup72 � China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China , ZTE Corporation (China) Q14/15, Q12/15 2024-06-14
[ 963 ]
(Rev.1)
Proposal update to G.7711 clauses 2, 5, 6, A.1, I, I.13 and bibliography for v5.0 � China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China Q14/15, Q12/15 2024-06-14
[ 962 ]
(Rev.1)
Proposal update to G.7711 Appendix XVII "Controller Lifecycle and Security" for v5.0 � China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China Q14/15, Q12/15 2024-06-14
[ 961 ]
(Rev.1)
Proposal update to G.7711 Annex R "Temporal Expression" for v5.0 � China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China Q14/15, Q12/15 2024-06-14
[ 960 ]
(Rev.1)
Proposal update to G.7711 Annex O "Compute" for v5.0 � China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China Q14/15, Q12/15 2024-06-14
[ 959 ]
(Rev.1)
Proposal update to G.7711 Annex I "OAM" for v5.0 � China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China Q14/15, Q12/15 2024-06-14
[ 958 ]
Proposal update to G.7711 Annex H "Control model" for v5.0 � China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China Q14/15, Q12/15 2024-06-14
[ 957 ]
(Rev.1)
Clarifications to proposed Self-Tuning Mechanism for revised G.698.4 � Lumentum (United States) , NEC Corporation (Japan) Q6/15 2024-06-14
[ 956 ]
G.hn: G9961 updates for the hierarchical bidirectional transmission � Maxlinear Inc (United States) Q3/15 2024-06-14
[ 955 ]
G.hn: G9960 pending updates for the hierarchical bidirectional transmission � Maxlinear Inc (United States) Q3/15 2024-06-14
[ 954 ]
Initial draft of Technical Paper section describing Q2/15 work � Futurewei Technologies Inc. (United States) Q4/15, Q3/15, Q2/15, Q1/15 2024-06-14
[ 953 ]
Proposal for way forward on G.9804.4 (50G TWDM-PON) � Futurewei Technologies Inc. (United States) Q2/15 2024-06-14
[ 952 ]
(Rev.1)
Text proposal for draft revised Recommendation G.698.4 � China Unicom , Telefon AB - LM Ericsson (Sweden) Q6/15 2024-06-14
[ 951 ]
Crosstalk calculation with the self-tuning method proposed in WD06-26 (Berlin, 16-18 April 2024) � China Unicom , Telefon AB - LM Ericsson (Sweden) Q6/15 2024-06-14
[ 950 ]
(Rev.1)
Considerations on 50G-PON dual-rate receiving ability � China Telecommunications Corporation Q2/15 2024-06-14
[ 949 ]
Proposed text refresh of 50G upstream parameters in G.9805 � China Telecommunications Corporation Q2/15 2024-06-14
Results:347 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-9