International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2021-04-12�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2021-04-12)�

ITU-T�SG 15

Transport, access and home

Study Period 2017

Meeting� from 2021-04-12 to 2021-04-23

held in E-Meeting

Other Meetings : 2021-12-062020-09-072020-01-272019-07-012018-10-082018-01-292017-06-19

Results:332 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 2356 ]
Proposal on revision of G.650.1 (Far field pattern measurement) � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q5/15 2021-03-29
[ 2355 ]
Proposal on revision of G.654 and G.652 � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q5/15 2021-03-29
[ 2354 ]
Consideration on OTN modeling in G.875 � China Information Communication Technologies Group Q14/15 2021-03-28
[ 2353 ]
Document with drawn � N/A � 2021-03-28
[ 2352 ]
Discussion on the correct allocation of the new ITU-T Recommendation L.oehc "Optical/Electrical hybrid cables for access point and other terminal equipment" � China Unicom , Ministry of Industry and Information Technology (MIIT) (China) Q5/15, Q16/15 2021-03-28
[ 2351 ]
Calendar Management in the MTN � Huawei Technologies Co., Ltd. (China) Q14/15, Q11/15 2021-03-28
[ 2350 ]
A Discussion on MCC in the MTN � Huawei Technologies Co., Ltd. (China) Q14/15 2021-03-28
[ 2349 ]
A Correction to the Definition of Frame Alignment Signal for FlexE in G.8023 � Huawei Technologies Co., Ltd. (China) Q11/15 2021-03-28
[ 2348 ]
MTN Path OAM message processing and validation process � Huawei Technologies Co., Ltd. (China) Q11/15 2021-03-28
[ 2347 ]
Performance Analysis on FlexE Frame Locking � China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2021-03-28
[ 2346 ]
Further discussion of the standardization of submarine cable scientific monitoring system � China Mobile Communications Corporation , China Unicom , Hengtong Optic-electric Co., Ltd. (China) , Jiangsu Zhongtian Technology Co.,Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q8/15 2021-03-28
[ 2345 ]
Proposal of new text of optical frequency interleaved WDM transmission technique in G Suppl.55 � National Institute of Information and Communications Technology (NICT) (Japan) Q2/15 2021-03-28
[ 2344 ]
Timing loop performance analysis in frequency synchronization network � Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2021-03-27
[ 2343 ]
Propose new work item L.ospran "Optical outside plant topologies for Centralized - Radio Access Networks (C-RAN)" � China Information Communication Technologies Group , China Mobile Communications Corporation , China Unicom , Hengtong Optic-electric Co., Ltd. (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) Q16/15 2021-03-27
[ 2342 ]
(Rev.1-2)
Considerations on SDN design and operation in G.7716 � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q14/15 2021-03-27
[ 2341 ]
Considerations on the evolution of G.owdm � China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2021-03-27
[ 2340 ]
(Rev.1-2)
Considerations on Routing Initialization in G.7716 � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q14/15 2021-03-27
[ 2339 ]
(Rev.1-2)
Considerations about Virtual Network (VN) in G.7716 � Huawei Technologies Co., Ltd. (China) , Huawei , Ministry of Industry and Information Technology (MIIT) (China) Q14/15 2021-03-27
[ 2338 ]
(Rev.1)
Proposal on the insertion loss of Passive V-groove alignment in ITU-T L.400 for validation of splicing systems � Ministry of Industry and Information Technology (MIIT) (China) Q16/15 2021-03-27
[ 2337 ]
OAM considerations for G.owdm � China Mobile Communications Corporation , China Mobile , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) , ZTE Q6/15 2021-03-27
[ 2336 ]
(Rev.1)
Proposals on policy, call or connection parameters and notification related interface between MCS components in G.7701 and G.7702 revision � Ministry of Industry and Information Technology (MIIT) (China) Q14/15, Q12/15 2021-03-27
[ 2335 ]
Considerations on AI enhanced MCS's operation and maintenance function � Ministry of Industry and Information Technology (MIIT) (China) Q14/15, Q12/15 2021-03-27
[ 2334 ]
G.9804.3_10min_HW_Base line parameters of 50G DS � Huawei Technologies Co., Ltd. (China) Q2/15 2021-03-27
[ 2333 ]
G.9804.3_10min_HW ONU X_S specification � Huawei Technologies Co., Ltd. (China) Q2/15 2021-03-27
[ 2332 ]

Duplicate of C2341
N/A � 2021-03-27
[ 2331 ]

Duplicate of C2337
N/A � 2021-03-27
[ 2330 ]
MTN dTIM processing consideration � Huawei Technologies Co., Ltd. (China) Q11/15 2021-03-27
[ 2329 ]
(Rev.1-2)
G.9804.2_20min_JNT_Rate Parameterization � China Telecommunications Corporation , Futurewei Technologies US R&D Center (United States) , Nokia Corporation (Finland) , Nokia Shanghai Bell Co. Ltd. (China) , Verizon Communication Corporation (United States) , ZTE Corporation (China) Q2/15 2021-03-27
[ 2328 ]
G.9802.2_15min_JNT_OPL classes � Orange (France) , ZTE Corporation (China) Q2/15 2021-03-27
[ 2327 ]
(Rev.1)
G.9807.3_15min_GOOG_FEC and link budget resolution � Google Fiber (United States) Q2/15 2021-03-27
[ 2326 ]
Document with drawn � N/A � 2021-03-27
[ 2325 ]
Text proposal for MTNP related defects and alarms � China Information Communication Technologies Group Q11/15 2021-03-27
[ 2324 ]
Text proposal for MTNP delay measurement � China Information Communication Technologies Group , China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) Q11/15 2021-03-27
[ 2323 ]
Discussion on MTNP OAM recovery � China Information Communication Technologies Group Q11/15 2021-03-27
[ 2322 ]
Discussion of dOCI detecting and clearing condition � China Information Communication Technologies Group Q11/15 2021-03-27
[ 2321 ]
MTNS atomic functions and processes text proposal for G.8321 � China Information Communication Technologies Group Q11/15 2021-03-27
[ 2320 ]
MTNS functional model and equipment functions considerations � China Information Communication Technologies Group , China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) Q11/15 2021-03-27
[ 2319 ]
Error contamination due to errored control block type in MTNP layer forwarding applications � China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) Q11/15 2021-03-27
[ 2318 ]
MTNP Test Vectors with CRC-12 computation examples � Broadcom Corporation (United States) , China Information Communication Technologies Group , China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) , Viavi Solutions Deutschland GmbH (Germany) , ZTE Corporation (China) Q11/15 2021-03-27
[ 2317 ]
FlexO 3R Regeneration OAM and Overhead Considerations � China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) Q11/15 2021-03-26
[ 2316 ]
B400G OTN considerations for FlexO/OTUCn structures and bit rates evolutions � China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) Q11/15 2021-03-26
[ 2315 ]
Uncorrected OTN FEC blocks and Packet or Ethernet client mapping to OSU � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) Q11/15 2021-03-26
[ 2314 ]
Considerations on B400G scenarios and applications � China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2021-03-26
[ 2313 ]
The mechanism of Hitless bandwidth adjustment of OSU � China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2021-03-26
[ 2312 ]
Requirements and Considerations on hitless adjustment of OSU bandwidth � China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2021-03-26
[ 2311 ]
Considerations on OSU (PRBS) test signal frame � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2021-03-26
[ 2310 ]
The impact of increased TPN bit width on related designs � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2021-03-26
[ 2309 ]
New G.Suppl_10mn_Or Towards greener optical access � Orange (France) Q2/15 2021-03-26
[ 2308 ]
G.9802.1_20min _Proposal on the Operational requirement in G.9802.1 (G.wdmpon.req) � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/15 2021-03-26
[ 2307 ]
(Rev.1)
Propose to update GSTR-TN5G on MCS for VN and other aspects � Ministry of Industry and Information Technology (MIIT) (China) Q14/15, Q12/15 2021-03-26
Results:332 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-4