International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2020-09-07�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2020-09-07)�

ITU-T�SG 15

Transport, access and home

Study Period 2017

Meeting� from 2020-09-07 to 2020-09-18

held in E-Meeting

Other Meetings : 2021-12-062021-04-122020-01-272019-07-012018-10-082018-01-292017-06-19

Results:301 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 2023 ]
(Rev.1-2)
Consideration on OSU bit rate � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2020-08-21
[ 2022 ]
Proposal for technical paper of architecture, function and service of home network � Huawei Technologies Co., Ltd. (China) Q18/15 2020-08-21
[ 2021 ]
G.vlc: Consideration of new use cases and requirement on LiFi technology � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q18/15 2020-08-21
[ 2020 ]
G.hn2: updated proposal on impulsive noise based synchronization transmission with noise profiles � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q18/15 2020-08-21
[ 2019 ]
Addition of an alternative asymmetric delay measurement method to Appendix IV of G.8271 � ADVA Optical Networking (United Kingdom) Q6/15, Q13/15 2020-08-21
[ 2018 ]
Study on the applicable distance scope of GN model to repeatered system � China Mobile Communications Corporation , China Unicom , Hengtong Optic-electric Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q8/15 2020-08-21
[ 2017 ]
Proposal of calculating method about launch power and conversion between OSNR_GAWBS and SNR_GAWBS � China Mobile Communications Corporation , China Unicom , Hengtong Optic-electric Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q8/15 2020-08-21
[ 2016 ]
(Rev.1)
Proposal on the quiet window duration in G.hsp.comTC � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/15 2020-08-21
[ 2015 ]
Suggestions on the study points of G.7716 � Ministry of Industry and Information Technology (MIIT) (China) , Huawei Technologies Co., Ltd. (China) Q14/15 2020-08-21
[ 2014 ]
AI/ML use cases for transport network slicing � Ministry of Industry and Information Technology (MIIT) (China) Q14/15, Q12/15 2020-08-21
[ 2013 ]
Wavelength assignments about the O-band DWDM for the 5G-fronthaul application � Broadcom Corporation (United States) , China Information Communication Technologies Group , China Telecommunications Corporation , Finisar Corporation (United States) , Huawei Technologies Co., Ltd. (China) , Lumentum (United States) , Ministry of Industry and Information Technology (MIIT) (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) Q6/15 2020-08-21
[ 2012 ]
Propose a new working item on "25G O-band DWDM system for 5G-fronthaul application" � Broadcom Corporation (United States) , China Information Communication Technologies Group , China Telecommunications Corporation , Finisar Corporation (United States) , Huawei Technologies Co., Ltd. (China) , Lumentum (United States) , Ministry of Industry and Information Technology (MIIT) (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) Q6/15 2020-08-21
[ 2011 ]
(Rev.1)
Performance Review on 12 x 25Gbit/s O-band DWDM Optical Interface � China Telecommunications Corporation , Finisar Corporation (United States) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) Q6/15 2020-08-21
[ 2010 ]
(Rev.1)
The 25G O-band DWDM Optical Path Penalty Test based on 12-channel 800GHz Grid Model in 5G-fronthaul Application � China Telecommunications Corporation , Finisar Corporation (United States) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) Q6/15 2020-08-21
[ 2009 ]
Proposed draft for clauses 5, 6, 7.1 and 7.2 of TR.sdm � Communication Line Products Association of Japan , KDDI Corporation (Japan) , NEC Corporation (Japan) , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q5/15 2020-08-21
[ 2008 ]
Proposal on revised draft for Appendix III of G.650.1 � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q5/15 2020-08-21
[ 2007 ]
Typo correction in G.709.2 (07/2018) � Infinera Corporation (United States) Q11/15 2020-08-20
[ 2006 ]
Use case of Applying Knowledge Graph to Optical Transport Network � China Information Communication Technologies Group Q14/15, Q12/15 2020-08-20
[ 2005 ]
Consideration on modeling of media layer protection in G.876 � China Information Communication Technologies Group Q14/15 2020-08-20
[ 2004 ]
Timing distribution over G.8312 (ex G.mtn) interfaces � Ciena Canada Q13/15 2020-08-20
[ 2003 ]
Proposal for multiple-DBA and control for PON slice in G.hsp.comTC � Mitsubishi Electric Corporation (Japan) , Nokia USA (United States) , Oki Electric Industry Company Ltd. (OKI) (Japan) Q2/15 2020-08-20
[ 2002 ]
Proposal on the fusion splice insertion loss for revision of ITU-T L.400 � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q16/15 2020-08-20
[ 2001 ]
Comments on G.874 � Fujitsu Limited (Japan) Q14/15 2020-08-20
[ 2000 ]
Withdrawn � N/A � Q14/15 2020-08-20
[ 1999 ]
Proposed initiating work for G.8010 Amendment 3 � Fujitsu Limited (Japan) Q12/15, Q10/15 2020-08-20
[ 1998 ]
MI_FilterConfig in G.798 and G.8023 � Fujitsu Limited (Japan) Q11/15 2020-08-20
[ 1997 ]
Proposal to update G.9806 about the OC message line rate � Orange (France) , ZTE Corporation (China) Q2/15 2020-08-20
[ 1996 ]
Consideration�of�G.MTN�POH�receiving�mechanism � China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-20
[ 1995 ]
Use cases of high-accuracy frequency based on next-generation atomic clock � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q13/15 2020-08-20
[ 1994 ]
Requirements for Hitless adjustment of OSU � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , LG Uplus (Korea (Rep. of)) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2020-08-20
[ 1993 ]
An example application for G.osu � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2020-08-20
[ 1992 ]
Draft outline for Optical Service Unit (OSU) path layer network (G.osu) � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2020-08-20
[ 1991 ]
Proposed A.1 Justification for revised Recommendation G.875 � China Information Communication Technologies Group , Huawei Technologies D�sseldorf GmbH (Germany) Q14/15 2020-08-20
[ 1990 ]
Text proposal for Clause7.2 in G.7719 � China Information Communication Technologies Group Q14/15 2020-08-19
[ 1989 ]
Proposal of new text of two-tone or multi-tone light source for RoF signal generation in G Suppl.55 � National Institute of Information and Communications Technology (NICT) (Japan) Q2/15 2020-08-19
[ 1988 ]
Clause 10.1 text proposal for FOIC1.1-RS MFI addition to G.Sup58 � China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q11/15 2020-08-18
[ 1987 ]
Proposal of a new Annex for IMT-2020 mobile systems on G.9803 Amd.1 � KDDI Corporation (Japan) , National Institute of Information and Communications Technology (NICT) (Japan) Q2/15 2020-08-18
[ 1986 ]
A.13 for G.Sup.media-im-ex � China Information Communication Technologies Group , Huawei Technologies D�sseldorf GmbH (Germany) , ZTE Corporation (China) Q14/15 2020-08-18
[ 1985 ]
Mapping of clients without ODU/OTU encapsulation into FlexO payload using GMP � China Information Communication Technologies Group , China Unicom , Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-17
[ 1984 ]
Further considerations on OTNsec using "L1GCM" based OTN Encryption Procedure � China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-17
[ 1983 ]
Proposed text to resolve SP55 "OTUCn-M replacement signals" � Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-17
[ 1982 ]
Text proposal for new appendix XVI in G.709 Amendment 1 � Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-17
[ 1981 ]
FlexO model evolution and update of FlexO specifications in G.798, G.709.1 and G.Sup58 � China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-17
[ 1980 ]
Initial consideration on B400G OTN interface questions � Huawei Technologies Co., Ltd. (China) Q11/15 2020-08-17
[ 1979 ]
50G PON downstream sensitivity and reference receiver � China Information Communication Technologies Group Q2/15 2020-08-17
[ 1978 ]
Proposed-updates-to-G.874-to-align-with-G.709 � China Information Communication Technologies Group Q14/15 2020-08-10
[ 1977 ]
Proposed-updates-to-G.874-to-align-with-G.798 � China Information Communication Technologies Group Q14/15 2020-08-10
[ 1976 ]
Network Limits for Deployment case with PRTC deployed in the Access � Telefon AB - LM Ericsson (Sweden) Q13/15 2020-08-05
[ 1975 ]
Guidelines for a budget allocation within a cluster (G.8271.1) � Telefon AB - LM Ericsson (Sweden) Q13/15 2020-08-04
[ 1974 ]
(Rev.1-2)
L.oha Appendix VII American SFU Experience � OFS Fitel, LLC (United States) Q16/15 2020-07-29
Results:301 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26