Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1963 ]
�
� |
Proposed modifications to draft G.709.1 for the modified frame format
�
� |
Microsemi Corporation
� |
Q11/15
� |
2016-09-03 |
|
[ 1962 ]
�
� |
Complexity Comparison of FlexO Frame Formats
�
� |
Microsemi Corporation
� |
Q11/15
� |
2016-09-03 |
|
[ 1961 ]
�
� |
Proposed modified FlexO frame format
�
� |
Microsemi Corporation
� |
Q11/15
� |
2016-09-03 |
|
[ 1960 ]
�
� |
2-byte vs 4-byte APS protocol for ODU SMP
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2016-09-02 |
|
[ 1959 ]
�
� |
FlexE and future Ethernet Nomenclature and Modeling
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15, Q10/15
� |
2016-09-02 |
|
[ 1958 ]
�
� |
FlexE Aware sub-group mapping into OPUflex
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2016-09-02 |
|
[ 1957 ]
�
� |
G.fast: utility maximization for vector policy management
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4/15
� |
2016-09-02 |
|
[ 1956 ]
�
� |
G.fast profiles 424 and 848
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4/15
� |
2016-09-02 |
|
[ 1955 ]
�
� |
Additional DTA Management Parameters
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4/15
� |
2016-09-02 |
|
[ 1954 ]
�
� |
Synchronization management model, comments on TD549/WP3 Rev.1
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-09-02 |
|
[ 1953 ]
�
(Rev.1)� |
Proposal for an information model for media
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1952 ]
�
� |
Proposals to update draft Recommendation G.cca to describe ODUflex
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1951 ]
�
� |
Proposed new text for clause 7.4 of G.cca
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1950 ]
�
� |
Proposal to add an appendix to G.872 to describe FlexE
�
� |
ZTE Corporation
� |
Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1949 ]
�
� |
Replacement text for Appendix II of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-09-02 |
|
[ 1948 ]
�
� |
Proposal to update clause 11 "OTN survivability techniques" in G.872
�
� |
ZTE Corporation
� |
Q9/15, Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1947 ]
�
� |
Replacement text for clause 10 of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-09-02 |
|
[ 1946 ]
�
� |
Proposal to add a description of the use of FlexO in G.872
�
� |
ZTE Corporation
� |
Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1945 ]
�
� |
Proposed modification to Clause 8 of G.872
�
� |
ZTE Corporation
� |
Q6/15, Q12/15
� |
2016-09-02 |
|
[ 1944 ]
�
� |
Technology review on transmitting 25 Gb/s over a single wavelength channel
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2016-09-02 |
|
[ 1943 ]
�
� |
Parameters for pilot tones and message channel for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-02 |
|
[ 1942 ]
�
� |
Appendix on Principles of Operation for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-02 |
|
[ 1941 ]
�
� |
Proposal of a new PLOAM to reboot ONU in G.9807.1
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2016-09-02 |
|
[ 1940 ]
�
� |
Proposal of a new supplement on 25 Gb/s transmission per wavelength
�
� |
Broadcom Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q2/15
� |
2016-09-02 |
|
[ 1939 ]
�
� |
Channel Bonding Discussion in IEEE P802.3ca
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2016-09-02 |
|
[ 1938 ]
�
� |
Additional SDN use case from ORCHESTRA Project
�
� |
Telecom Italia S.p.A.
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1937 ]
�
� |
Considerations on sync in fronthaul
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2016-09-02 |
|
[ 1936 ]
�
� |
SyncE Master ID (G.8264)
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2016-09-02 |
|
[ 1935 ]
�
� |
T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2016-09-02 |
|
[ 1934 ]
�
� |
Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2016-09-02 |
|
[ 1933 ]
�
� |
considerations about the wavelength plan of G.metro
�
� |
ZTE Corporation
� |
Q6/15
� |
2016-09-02 |
|
[ 1932 ]
�
� |
Considerations on the EVM in the G.698.2
�
� |
ZTE Corporation
,
CAICT
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2016-09-02 |
|
[ 1931 ]
�
� |
Need for all-optical inter-cloud and intra-cloud network architecture
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
� |
Q12/15
� |
2016-09-02 |
|
[ 1930 ]
�
� |
Starting with Sub-Lambda Photonic Switching Network (SLPSN) Standardization, definition of the scope
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
Orange
� |
Q12/15
� |
2016-09-02 |
|
[ 1929 ]
�
� |
Comments on draft G.8152 (clause 3 and 4)
�
� |
Fujitsu Limited
� |
Q3/15, Q14/15
� |
2016-09-02 |
|
[ 1928 ]
�
� |
Some corrections to G.8121 series
�
� |
Fujitsu Limited
� |
Q10/15
� |
2016-09-02 |
|
[ 1927 ]
�
� |
IaDI/IrDI in PTN (G.8012 and G.8112)
�
� |
Fujitsu Limited
� |
Q3/15, Q11/15, Q10/15
� |
2016-09-02 |
|
[ 1926 ]
�
� |
Interface definition for OTN
�
� |
Fujitsu Limited
� |
Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1925 ]
�
� |
Modelling consideration on Alarm and Reporting for Notification
�
� |
Fujitsu Limited
� |
Q14/15
� |
2016-09-02 |
|
[ 1924 ]
�
� |
Clarification for EMF
�
� |
Fujitsu Limited
� |
Q14/15
� |
2016-09-02 |
|
[ 1923 ]
�
� |
Consideration on IaDI FlexO
�
� |
KDDI Corporation
� |
Q11/15
� |
2016-09-02 |
|
[ 1922 ]
�
� |
Proposal for Multiservice G.RoF optical architecture and configuration
�
Duplicate of C1967
� |
Telekom Malaysia Berhad
� |
Q2/15
� |
2016-09-02 |
|
[ 1921 ]
�
� |
Physical Layer Implementation Guidance for "Open Line Systems"
�
� |
Xtera Communications, Inc.
� |
Q6/15
� |
2016-09-01 |
|
[ 1920 ]
�
� |
Media Control Annex for G.cca
�
� |
Xtera Communications, Inc.
� |
Q14/15, Q12/15
� |
2016-09-01 |
|
[ 1919 ]
�
� |
Impact of pilot tone and message channel on the payload in G.metro
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2016-09-01 |
|
[ 1918 ]
�
� |
Proposal to start a new project to specify CPRI over OTN phase 2
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q11/15
� |
2016-09-01 |
|
[ 1917 ]
�
(Rev.1-2)� |
CPRI over OTN phase II extension
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Intel Corporation
,
IP Light
,
Xilinx Incorporation
� |
Q11/15
� |
2016-09-01 |
|
[ 1916 ]
�
� |
Use of a Persistency Filter in ODUk SNC/S Protected Domains
�
� |
Alcatel-Lucent International
� |
Q9/15
� |
2016-09-01 |
|
[ 1915 ]
�
� |
100G/B100G multi-vendor FlexO based SOTUm interface family
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q11/15
� |
2016-09-01 |
|
[ 1914 ]
�
� |
Proposed corrections to Table 8-1/G.874 and 7-1/G.806
�
� |
Huawei Technologies Co., Ltd.
� |
Q14/15, Q11/15
� |
2016-09-01 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):