Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1268 ]
�
� |
Jitter evaluation methods for burst signal at XG-PON interfaces
�
� |
CIAJ
� |
Q15/15
� |
2011-01-31 |
|
[ 1267 ]
�
� |
G.8272 PRTC type approval process proposal
�
� |
Deutsche Telekom
� |
Q13/15
� |
2011-01-31 |
|
[ 1266 ]
�
� |
G.8272 PRTC Options: Temperature
�
� |
Deutsche Telekom
� |
Q13/15
� |
2011-01-31 |
|
[ 1265 ]
�
� |
LTE-Advanced Coordinated Multi-point (CoMP) Time/phase accuracy requirements for ITU-T Q13/15 (G.827x)
�
� |
Deutsche Telekom
� |
Q13/15
� |
2011-01-31 |
|
[ 1264 ]
�
� |
Need for EEC chain hold-over management
�
� |
Deutsche Telekom
� |
Q13/15
� |
2011-01-31 |
|
[ 1263 ]
�
� |
Proposed eID Tag and Its Applications in the Network
�
� |
Huawei
� |
Q17/15
� |
2011-01-31 |
|
[ 1262 ]
�
� |
Proposal for work on NG-PON protection
�
� |
Huawei
,
MIIT China
� |
Q2/15
� |
2011-01-31 |
|
[ 1261 ]
�
� |
MPI test method in the G.650.1 Appendix
�
� |
Prysmian
� |
Q5/15
� |
2011-01-31 |
|
[ 1260 ]
�
� |
Consideration on OTU5 (400G)
�
� |
Huawei
� |
Q11/15
� |
2011-01-31 |
|
[ 1259 ]
�
� |
Proposal for the scope of the Recommendation G.8272
�
� |
IDT
� |
Q13/15
� |
2011-01-31 |
|
[ 1258 ]
�
� |
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao
�
� |
ZTE
� |
Q14/15, Q12/15, Q11/15
� |
2011-01-31 |
|
[ 1257 ]
�
� |
Propose a latency measurement model of equipment
�
� |
ZTE
� |
Q9/15
� |
2011-01-31 |
|
[ 1256 ]
�
� |
Requirement for communication latency as a traffic engineering performance metric in ASON
�
� |
ZTE
� |
Q14/15, Q12/15
� |
2011-01-31 |
|
[ 1255 ]
�
� |
Some OTN related revision suggestions in G.696.1(MIIT-CATR)
�
� |
MIIT China
� |
Q6/15
� |
2011-01-31 |
|
[ 1254 ]
�
(Rev.1)� |
Proposal of adding new attribute to PPTP POTS UNI ME
�
� |
MIIT China
� |
Q2/15
� |
2011-01-31 |
|
[ 1253 ]
�
� |
Proposal of adding new MAC bridge port ICMPv6 process preassign table to G.988
�
� |
MIIT China
� |
Q2/15
� |
2011-01-31 |
|
[ 1252 ]
�
� |
PMD parameters description method suggestion(MIIT-CATR)
�
� |
MIIT China
� |
Q6/15
� |
2011-01-31 |
|
[ 1251 ]
�
� |
G.gen: New Recommendations for Next-Generation DSL Technologies
�
� |
MIIT China
,
China Unicom
� |
Q4/15
� |
2011-01-31 |
|
[ 1250 ]
�
� |
MII China comments on future revision of Rec. G.657
�
� |
MII China
� |
Q5/15
� |
2011-01-31 |
|
[ 1249 ]
�
� |
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile
�
� |
CATR
,
China Mobile
� |
Q10/15
� |
2011-01-31 |
|
[ 1248 ]
�
� |
PTN GACh+Y.1731 OAM interoperability test activities and result
�
� |
CATR
,
China Mobile
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-01-31 |
|
[ 1247 ]
�
� |
Support for the consent of G.8110.1 and G.tpoam
�
� |
China MIIT
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-01-31 |
|
[ 1246 ]
�
� |
A proposal to fault scenario analysis of draft G.hao
�
� |
ETRI
� |
Q11/15
� |
2011-01-31 |
|
[ 1245 ]
�
� |
A proposal to session timer for draft G.hao
�
� |
ETRI
� |
Q11/15
� |
2011-01-31 |
|
[ 1244 ]
�
� |
Support for the consent of G.8110.1
�
� |
NEC
,
Fujitsu
,
Hitachi
� |
Q12/15
� |
2011-01-31 |
|
[ 1243 ]
�
� |
Comments on the extension of proactive loss measurement in Y.1731/G.8021
�
� |
NEC
,
Hitatchi
� |
Q9/15, Q10/15
� |
2011-01-31 |
|
[ 1242 ]
�
� |
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies
�
� |
Huawei
� |
Q4/15
� |
2011-01-31 |
|
[ 1241 ]
�
� |
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links
�
� |
Huawei
,
China MIIT
� |
Q4/15
� |
2011-01-31 |
|
[ 1240 ]
�
� |
G.vector: A Comment on G.993.5 (04/2010)
�
� |
Huawei
� |
Q4/15
� |
2011-01-31 |
|
[ 1239 ]
�
� |
Proposed clarification of ETH-CSF specification in Y.1731
�
� |
NEC
� |
Q9/15, Q10/15
� |
2011-01-31 |
|
[ 1238 ]
�
� |
The end-to-end service resilience with combination of G.8032 and STP
�
� |
NEC
� |
Q9/15
� |
2011-01-31 |
|
[ 1237 ]
�
� |
Consideration of SD triggered Protection Switching in G.8031
�
� |
NEC
� |
Q9/15
� |
2011-01-31 |
|
[ 1236 ]
�
� |
Proposed modifications to ETH-SLM processes in G.8021
�
� |
NEC
� |
Q9/15
� |
2011-01-31 |
|
[ 1235 ]
�
� |
Proposal on maximum PTP clock number in the time reference model
�
� |
CMCC
,
CATR
,
ZTE
� |
Q13/15
� |
2011-01-31 |
|
[ 1234 ]
�
� |
TOD specification
�
� |
CMCC
,
CATR
,
Huawei
,
ZTE
� |
Q13/15
� |
2011-01-31 |
|
[ 1233 ]
�
� |
PTP frequency sync with partial timing support
�
� |
ZTE
� |
Q13/15
� |
2011-01-31 |
|
[ 1232 ]
�
� |
Proposals on the BC simulation model in G.8273
�
� |
ZTE
� |
Q13/15
� |
2011-01-31 |
|
[ 1231 ]
�
� |
Proposed text for initial draft of O.xgponjitter
�
� |
CIAJ
� |
Q15/15
� |
2011-01-31 |
|
[ 1230 ]
�
� |
Proposal for change of jitter test parameters in O.174 amd.1
�
� |
CIAJ
� |
Q15/15
� |
2011-01-31 |
|
[ 1229 ]
�
� |
G.hn: Proposal for neighbour domain co-ordination
�
� |
Metanoia Technologies
� |
Q4/15
� |
2011-01-31 |
|
[ 1228 ]
�
� |
G.inp: Proposed clarification to retransmission return channel
�
� |
Metanoia Technologies
� |
Q4/15
� |
2011-01-31 |
|
[ 1227 ]
�
� |
The wavelength bands for G.sdapp systems
�
� |
KT
� |
Q6/15
� |
2011-01-31 |
|
[ 1226 ]
�
� |
Comments on draft Recommendation L.coi
�
� |
NTT
� |
Q16/15
� |
2011-01-31 |
|
[ 1225 ]
�
� |
Draft new Recommendation L.aid "Aerial infrastructure design for optical access network"
�
� |
NTT
� |
Q18/15
� |
2011-01-31 |
|
[ 1224 ]
�
� |
Draft new Recommendation L.omtl "An optical fibre cable maintenance support, monitoring and testing system for optical fibre cable networks for trunk lines"
�
� |
NTT
� |
Q17/15
� |
2011-01-31 |
|
[ 1223 ]
�
� |
Information on MPI characteristics under various deployment conditions
�
� |
NTT
� |
Q5/15
� |
2011-01-31 |
|
[ 1222 ]
�
� |
Draft Appendix to G.650.3 regarding macrobending detection method
�
� |
SoftBank Telecom
� |
Q5/15
� |
2011-01-31 |
|
[ 1221 ]
�
� |
Comments on draft G.aon
�
� |
Huawei
� |
Q12/15
� |
2011-01-31 |
|
[ 1220 ]
�
� |
G.800 Terminology Proposals
�
� |
Huawei
� |
Q12/15
� |
2011-01-31 |
|
[ 1219 ]
�
� |
G.827x Renumbering
�
� |
RAD Data Communications
� |
Q13/15
� |
2011-01-31 |
Results:418 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):