Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 184 ]
�
� |
Proposal for improving working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)
�
� |
Korea (Rep. of)
� |
� |
2024-06-13 |
|
[ 183 ]
�
� |
Proposal for update to a working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Korea (Rep. of)
� |
� |
2024-06-13 |
|
[ 182 ]
�
� |
Consideration on an approach to develop technical and operational characteristics of IMT in the existing IMT bands for other IMT-related WRC-27 agenda items
�
� |
Samsung Electronics Co., Ltd. (Korea (Rep. of))
� |
� |
2024-06-13 |
|
[ 181 ]
�
� |
Consideration on parameters, assumptions and scenarios for IMT-2030 networks in 4 400-4 800 MHz, 7 125-8 400 MHz and 14.8-15.35 GHz band in sharing studies under WRC-27 agenda item 1.7
�
� |
Samsung Electronics Co., Ltd. (Korea (Rep. of))
� |
AI1.7
� |
2024-06-13 |
|
[ 180 ]
�
� |
Proposal for a new ITU-R Report on coordination of stations in the FS with IMT stations in the frequency band 6 425-7 125 MHz
�
� |
Kenya
,
South Africa
,
Zimbabwe
� |
� |
2024-06-13 |
|
[ 179 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Party 5D for information) - Boundary conditions for the coordination and protection of the radio astronomy service in the 42.5-43.5 GHz band - Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
�
� |
WP 3M
� |
� |
2024-06-13 |
|
[ 178 ]
�
� |
Proposals to the preliminary draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
�
� |
Mexico
� |
� |
2024-06-13 |
|
[ 177 ]
�
� |
Proposals regarding the working document towards a preliminary draft new Recommendation / Report ITU-R S.[MITIGATION MEASURES]
�
� |
Mexico
� |
� |
2024-06-13 |
|
[ 176 ]
�
� |
Proposals to the working document towards a preliminary draft new Report ITU-R M.[IMT.A2G] - Non-safety communications between base stations on ground and airborne user equipment devices supported by the terrestrial component of IMT
�
� |
Mexico
� |
� |
2024-06-13 |
|
[ 175 ]
�
� |
Update on recent activities within CEPT
�
� |
ITU Region 1 (CEPT) Rapporteur
� |
� |
2024-06-13 |
|
[ 174 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Finland
,
Germany
,
United Kingdom
� |
� |
2024-06-12 |
|
[ 173 ]
�
� |
Proposals on the technical performance requirements for draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Apple Inc. (United States)
� |
� |
2024-06-12 |
|
[ 172 ]
�
� |
IMT base station density estimations for sharing and compatibility studies in preparation for WRC-27
�
� |
United Kingdom
� |
� |
2024-06-12 |
|
[ 171 ]
�
� |
Considerations on IMT-2030 technology related work
�
� |
Nokia Corporation (Finland)
,
Apple Inc. (United States)
,
Huawei Technologies Sweden AB
,
Intel Corporation (United States)
,
InterDigital Communications, Inc. (United States)
,
Qualcomm, Inc. (United States)
,
Samsung Electronics Co., Ltd. (Korea (Rep. of))
,
Telefon AB - LM Ericsson (Sweden)
,
ZTE Corporation (China)
� |
� |
2024-06-12 |
|
[ 170 ]
�
� |
Proposed reply liaison statement to Working Party 4C on work related to WRC-27 agenda item 1.13
�
� |
China
� |
AI1.13
� |
2024-06-12 |
|
[ 169 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17
�
� |
WPs 3L & 3M
� |
AI1.17
� |
2024-06-12 |
|
[ 168 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
�
� |
WP 3M
� |
AI1.1
� |
2024-06-12 |
|
[ 167 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
�
� |
WPs 3L & 3M
� |
AI1.14, AI1.13, AI1.12, AI1.11
� |
2024-06-12 |
|
[ 166 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19
�
� |
WPs 3J & 3M
� |
AI1.19
� |
2024-06-12 |
|
[ 165 ]
�
� |
Proposed material for reply liaison statements to relevant Working Parties
�
� |
Canada
� |
� |
2024-06-11 |
|
[ 164 ]
�
� |
IMT-2030: Some considerations on usage scenarios, geographical environments and test environments
�
� |
Canada
� |
� |
2024-06-11 |
|
[ 163 ]
�
� |
Proposal on text of working document towards the preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
ATIS NextG Alliance
� |
� |
2024-06-12 |
|
[ 162 ]
�
� |
Proposal on test environments for IMT-2030
�
� |
ATIS NextG Alliance
� |
� |
2024-06-11 |
|
[ 161 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
�
� |
WP 3J
� |
AI1.15
� |
2024-06-12 |
|
[ 160 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WPs 3K & 3M
� |
AI1.7
� |
2024-06-10 |
|
[ 159 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16
�
� |
WPs 3J & 3M
� |
AI1.16
� |
2024-06-10 |
|
[ 158 ]
�
� |
Assessment of the effect of zero-forcing on gain distribution for active antenna of IMT BS
�
� |
France
,
New Zealand
� |
� |
2024-06-07 |
|
[ 157 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[1.7 X BAND] - Sharing and compatibility studies and development of technical conditions for the use of International Mobile Telecommunications (IMT) in the frequency band 7 125-8 400 MHz (or parts thereof) for the terrestrial component of IMT
�
� |
France
� |
AI1.7
� |
2024-06-07 |
|
[ 156 ]
�
� |
Liaison statement on the establishment of the working group on requirements for merging automatically into congested lanes
�
� |
CITS EG-ComAD
� |
� |
2024-06-10 |
|
[ 155 ]
�
� |
Information on 5G NR MBS standards and practices
�
� |
China
� |
� |
2024-06-07 |
|
[ 154 ]
�
� |
Proposals on working documents towards preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and ITU-R M.[IMT-2020.UNWANT.MS]
�
� |
China
� |
� |
2024-06-07 |
|
[ 153 ]
�
� |
Preparations on evaluation of the new IMT-2020 submission
�
� |
China
� |
� |
2024-06-07 |
|
[ 152 ]
�
� |
Proposals on Document IMT-2030/2 - Process
�
� |
China
� |
� |
2024-06-07 |
|
[ 151 ]
�
� |
Considerations on the test environments of IMT-2030
�
� |
China
� |
� |
2024-06-07 |
|
[ 150 ]
�
� |
Proposals on the draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
China
� |
� |
2024-06-07 |
|
[ 149 ]
�
� |
Proposal for draft text of IMT-2030 Circular Letter
�
� |
China
� |
� |
2024-06-07 |
|
[ 148 ]
�
� |
Proposal for working document towards a preliminary draft a new Report ITU-R M.[IMT.A2G] - Non-safety communications between base stations on ground and airborne user equipment devices supported by the terrestrial component of IMT
�
� |
China
� |
� |
2024-06-07 |
|
[ 147 ]
�
� |
Proposal on the preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
�
� |
China
� |
� |
2024-06-07 |
|
[ 146 ]
�
� |
Proposal on new study of possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz
�
� |
China
� |
� |
2024-06-07 |
|
[ 145 ]
�
� |
Proposal on the IMT parameters towards WRC-27 agenda item 1.13
�
� |
China
� |
AI1.13
� |
2024-06-07 |
|
[ 144 ]
�
� |
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHz
�
� |
China
� |
� |
2024-06-07 |
|
[ 143 ]
�
� |
Proposed revision of work plan for the working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
�
� |
China
� |
� |
2024-06-07 |
|
[ 142 ]
�
� |
Proposal on the IMT parameters for the frequency band 14.8-15.35 GHz towards WRC-27 agenda item 1.7
�
� |
China
� |
AI1.7
� |
2024-06-07 |
|
[ 141 ]
�
� |
Proposals for modification of the working document towards a preliminary draft new Report ITU-R M.[IMT.A2G]
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 140 ]
�
� |
Analysis of the frequency plans of Recommendation ITU-R M.1036 for MSS applications and draft reply liaison statement to Working Party 4C
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 139 ]
�
� |
Proposed characteristics of IMT for sharing studies in the frequency band 4 400-4 800 MHz
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 138 ]
�
� |
Proposals on the structure of Report ITU-R M.[IMT-RLAN] and detailed work plan
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 137 ]
�
� |
Liaison statement on revised ITU work related to ITS presented at 3GPP Stage-1 Workshop on IMT-2030 use cases
�
� |
CITS EG-ComAD
� |
� |
2024-06-06 |
|
[ 136 ]
�
� |
Liaison statement on parameters for 4 400 to 4 800 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
�
� |
Director, BR
� |
� |
2024-06-04 |
|
[ 135 ]
�
� |
Update on activities in Region 2
�
� |
Region 2 Rapporteur
� |
� |
2024-06-03 |
Results:434 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):