Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 108 ]
�
� |
Compatibility study of aeronautical earth stations in motion and stations in the fixed service
�
� |
France
� |
AI1.1
� |
2024-04-19 |
|
[ 107 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Accounting for all sidelobe contributions of non-GSO FSS satellites in Recommendation ITU-R S.1503
�
� |
France
� |
� |
2024-04-19 |
|
[ 106 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
�
� |
France
� |
� |
2024-04-19 |
|
[ 105 ]
�
� |
Proposed amendments to working document towards a preliminary draft new ITU-R Recommendations on the maximum allowable aggregate interference levels from time-variant sources from other services into fixed-satellite service links
�
� |
France
� |
� |
2024-04-19 |
|
[ 104 ]
�
� |
Existing and future development of systems under FSS in the frequency range 7 250 to 7 750 MHz and 7 900 to 8 400 MHz
�
� |
France
� |
AI1.7
� |
2024-04-19 |
|
[ 103 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[RES 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations
�
� |
France
� |
� |
2024-04-19 |
|
[ 102 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
�
� |
France
� |
� |
2024-04-19 |
|
[ 101 ]
�
� |
Proposed concepts to consider when revising the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO]
�
� |
France
� |
� |
2024-04-19 |
|
[ 100 ]
�
� |
Proposed reply liaison statement to Working Party 7D FSS characteristics for WRC-27 agenda item 1.16
�
� |
France
� |
AI1.16
� |
2024-04-19 |
|
[ 99 ]
�
� |
Proposed reply liaison statement to Working Party 5D documenting FSS characteristics in the frequency range 7 125-8 400 MHz for sharing and compatibility studies under WRC-27 agenda item 1.7
�
� |
France
� |
AI1.7
� |
2024-04-19 |
|
[ 98 ]
�
� |
Proposed liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D requesting characteristics for use in sharing studies under WRC-27 agenda item 1.1
�
� |
France
� |
AI1.1
� |
2024-04-19 |
|
[ 97 ]
�
� |
Initial elements related to the preparatory work for WRC-27 agenda item 1.2
�
� |
France
� |
AI1.2
� |
2024-04-19 |
|
[ 96 ]
�
� |
Working document towards a preliminary draft new Recommendation - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric or active phased array earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band
�
� |
Viasat, Inc. (United States)
� |
� |
2024-04-18 |
|
[ 95 ]
�
� |
Proposed elevation of working document towards a preliminary draft new Report to preliminary draft new Report
�
� |
Viasat, Inc. (United States)
� |
� |
2024-04-18 |
|
[ 94 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Underestimation of non-GSO interference arising from the use of worst-case geometry in S.1503 and necessity to supplement it with grid-based epfd analysis
�
� |
Viasat, Inc. (United States)
� |
� |
2024-04-18 |
|
[ 93 ]
�
� |
Additional elements in application of existing methodologies to compute and evaluate the aggregate interference from non-GSO FSS systems into GSO networks with respect to aggregate epfd limits in Resolution 76 (Rev.WRC-23)
�
� |
Viasat, Inc. (United States)
� |
� |
2024-04-18 |
|
[ 92 ]
�
� |
Proposed open-source software tool for determining conformity of non-GSO FSS systems with Article 22 epfd limits
�
� |
Viasat, Inc. (United States)
� |
� |
2024-04-18 |
|
[ 91 ]
�
� |
Proposed technical parameters for WRC-27 agenda item 1.3
�
� |
Intelsat
� |
� |
2024-04-19 |
|
[ 90 ]
�
� |
Studies related to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Modifications to the preliminary draft new Recommendation/Report
�
� |
Intelsat
� |
� |
2024-04-19 |
|
[ 89 ]
�
� |
Studies related to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Studies 1 and 2
�
� |
Intelsat
� |
� |
2024-04-19 |
|
[ 88 ]
�
� |
Studies related to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - GSO return links operations
�
� |
Intelsat
� |
� |
2024-04-19 |
|
[ 87 ]
�
� |
Position and proposals regarding on the work on Recommendation ITU-R S.[MITIGATION MEASURES]
�
� |
Papua New Guinea
� |
� |
2024-04-19 |
|
[ 86 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO]
�
� |
United States
� |
� |
2024-04-19 |
|
[ 85 ]
�
� |
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Methodology for evaluating and technical procedures for addressing any exceedance of aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka frequency bands
�
� |
United States
� |
� |
2024-04-19 |
|
[ 84 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[ARTICLE 22 EPFD LIMIT STUDIES]
�
� |
United States
� |
� |
2024-04-19 |
|
[ 83 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[ESIM NCMC] - The functionalities and implementation of a network control and monitoring center (NCMC) for earth stations in motion
�
� |
United States
� |
� |
2024-04-19 |
|
[ 82 ]
�
� |
Suppression of Question ITU-R 284/4 - Spectrum management issues related to the introduction of the broadcasting-satellite service (sound) in the frequency range 1-3 GHz
�
� |
United States
� |
� |
2024-04-19 |
|
[ 81 ]
�
� |
Proposed working document on WRC-27 agenda item 1.3
�
� |
Canada
� |
AI1.3
� |
2024-04-18 |
|
[ 80 ]
�
� |
Comparison of GSO protection limits in the Ka-band
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 79 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[GSO PROTECTION FROM NGSO KA-BAND]
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 78 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Review of methods for computing aggregate epfd
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 77 ]
�
� |
Submission of satellite system characteristics as per recommends 4 of Recommendation ITU-R S.1328-4 - Satellite system characteristics to be considered in frequency sharing analyses within the fixed-satellite service
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 76 ]
�
� |
Elements for a working document towards a preliminary draft new Handbook ITU-R [NGSO_BEST_PRACTICES]
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 75 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[NGSO DEORBITING] - Guidance on safe and efficient deorbit and/or disposal strategies and methodologies for non-GSO space stations involved in radiocommunication services after the end of their life
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 74 ]
�
� |
Calculation of epfd statistics at geometries other than the worst-case geometry
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 73 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 72 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] - Calculation method to assess the impact on link performance due to inter-system interference when an assignment to a non-geostationary FSS satellite system is involved
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 71 ]
�
� |
Analysis of the protection provided by Article 22 epfd limits to GSO FSS networks and potential constraints to non-GSO FSS system in the 10.7-12.75 GHz band
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 70 ]
�
� |
Representative system characteristics of an FSS geostationary network in the 40/50 GHz bands for studies related to WRC-27 agenda item 1.1
�
� |
EchoStar Operating LLC
� |
AI1.1
� |
2024-04-18 |
|
[ 69 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Modifications to ITU-R S.1503 to accurately model downlink of non-GSO systems using steerable beams
�
� |
Galaxy Space (Beijing) Technology Co.,Ltd.
� |
� |
2024-04-18 |
|
[ 68 ]
�
� |
Proposed working document on WRC-27 agenda item 1.2
�
� |
Ghana
,
Nigeria
� |
AI1.2
� |
2024-04-18 |
|
[ 67 ]
�
� |
Workplan for WRC-27 agenda item 1.2
�
� |
Ghana
,
Nigeria
� |
AI1.2
� |
2024-04-18 |
|
[ 66 ]
�
� |
Proposed liaison statement to contributing Working Parties of WRC-27 agenda item 1.2
�
� |
Ghana
,
Nigeria
� |
� |
2024-04-18 |
|
[ 65 ]
�
� |
Prioritization of work related to non-WRC-27 agenda item
�
� |
Indonesia
� |
� |
2024-04-18 |
|
[ 64 ]
�
� |
Information document on U.S. domestic regulations and policies regarding the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
�
� |
United States
� |
� |
2024-04-18 |
|
[ 63 ]
�
� |
Additional issue to address in the next revision of Recommendation ITU-R S.1503-4
�
� |
United States
� |
� |
2024-04-18 |
|
[ 62 ]
�
� |
Proposed draft reply liaison statement to Working Party 7D regarding WRC-27 agenda item 1.16
�
� |
United States
� |
AI1.16
� |
2024-04-18 |
|
[ 61 ]
�
� |
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
�
� |
United States
� |
� |
2024-04-18 |
|
[ 60 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
�
� |
United States
� |
� |
2024-04-18 |
|
[ 59 ]
�
� |
Draft liaison statement to Working Parties 5A, 5C, 7C and 7D (copy to Working Party 3M) - WRC-27 agenda item 1.3
�
� |
United States
� |
AI1.3
� |
2024-04-18 |
Results:358 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):