International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP-7B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP-7B� C�

ITU-R�WP-7B

Space Radiocommunication Applications

Results:278 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 28 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.16 � WP 5C AI1.16 2020-08-06
[ 27 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, and 7B for information) - WRC-23 agenda item 1.19 � WP 5C AI1.19 2020-08-06
[ 26 ]
Liaison reply to Working Party 4A (copy to Working Parties 4C, 7B and 7C) - Re: Intention to develop a Small Satellite Handbook � WP 5A 2020-08-06
[ 25 ]
Liaison statement to Working Parties 3M, 4A, 4C and 7B - WRC-23 agenda item 1.6 - Facilitation of radiocommunication for sub-orbital vehicles � WP 5B AI1.6 2020-08-05
[ 24 ]
Liaison statement to Working Party 7B (copied to Working Parties 3M, 5B, 5C, 7C and 7D for information) - Preparations for studies under WRC-23 agenda item 1.13 � WP 5A AI1.13 2020-08-05
[ 23 ]
Liaison statement to Working Parties 4C, 7B, 3M and 3L - WRC-23 agenda item 1.7 - Consideration of a new aeronautical mobile-satellite (R) service allocation in the frequency band 117.975-137 MHz � WP 5B AI1.7 2020-08-05
[ 22 ]
Reply liaison statement to Working Party 7B - WRC-23 agenda item 1.13 - Radiodetermination and aeronautical characteristics in or adjacent to frequency band 14.8-15.35 GHz � WP 5B AI1.13 2020-08-05
[ 21 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chairman, CCV 2020-07-14
[ 20 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups � Director, BR 2020-06-25
[ 19 ]
Liaison statement to Working Parties 5A, 5B, 5C, 7B (copy for information to Working Party 3M) - WRC-23 agenda item 1.19 � WP 4A AI1.19 2020-09-08
[ 18 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.16 � WP 4A AI1.16 2020-06-10
[ 17 ]
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.17 � WP 4A AI1.17 2020-06-10
[ 16 ]
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18 � WP 4C AI1.18 2020-06-08
[ 15 ]
Preliminary position on WRC-23 agenda � World Meteorological Organization 2020-05-13
[ 14 ]
+Ann.1-10
Report on the meeting of Working Party 7B (e-Meeting, 21-24 April 2020) � Chairman, WP 7B 2020-04-24
[ 13 ]
Final List of Participants - Working Party 7B (e-Meeting, 21-24 April 2020) � Director, BR 2020-04-24
[ 12 ]
Draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION] � Chairman, SG 7 2020-04-20
[ 11 ]
List of documents issued (Documents 7B/1 - 7B/12) � BR Study Groups Department 2020-04-17
[ 10 ]
Organization of the work of Working Party 7B � Chairman, SG 7 2020-04-16
[ 9 ]
Provisional work plan of Working Party 7B for WRC-23 agenda item 1.13 � China (People's Republic of) AI1.13 2020-04-13
[ 8 ]
Draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION] - Determination of coordination zones around EESS and SRS earth stations � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites 2020-04-09
[ 7 ]
Working document towards a preliminary draft new Report ITU-R SA.[15 GHz SRS SHARING] - Sharing and Compatibility Studies for the SRS in the band 14.8-15.35 GHz � United States of America AI1.13 2020-04-07
[ 6 ]
Working document towards a preliminary draft new Recommendation ITU-R SA.[15 GHz SRS CHARACTERISTICS] - Characteristics of SRS Systems in the frequency range 14.8-15.35 GHz � United States of America AI1.13 2020-04-07
[ 5 ]
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23 � Iran (Islamic Republic of) 2020-03-23
[ 4 ]
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2 � WP 5D AI1.2, AI1.1 2020-03-06
[ 3 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2 � WP 5D AI1.2 2020-03-06
[ 2 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4 � WP 5D AI1.4 2020-03-06
[ 1 ]
Documents to be carried over from the 2015-2019 study period � WP 7B 2019-10-31
Results:278 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-11-10