International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:983 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 733 ]
Preliminary draft CPM text for WRC-23 agenda item 1.17 � United States of America AI1.17 2022-09-05
[ 732 ]
Working document on WRC-23 agenda item 1.17 � United States of America AI1.17 2022-09-05
[ 731 ]
Sharing and compatibility studies for working document related to WRC-23 agenda item 1.17 � United States of America AI1.17 2022-09-05
[ 730 ]
Annex 2 to working document on WRC-23 agenda item 1.17 � United States of America AI1.17 2022-09-05
[ 729 ]
Compatibility studies between GSO FSS services and satellite-to-satellite links in 27.5-30 GHz � Australia 2022-09-05
[ 728 ]
Revisions to the working document for WRC-23 agenda item 1.16 - Mechanisms for ESIM operation to mitigate interference when approaching an administration's territory that has not given authorisation or operating outside of accepted parameters � Australia AI1.16 2022-09-05
[ 727 ]
Revisions to the working document for WRC-23 agenda item 1.15 - Mechanisms for ESIM operation to mitigate interference when approaching an administration's territory that has not given authorisation or operating outside of accepted parameters � Australia AI1.15 2022-09-05
[ 726 ]
Revisions to working document on WRC-23 agenda item 1.15 - Studies on the differences between pfd mask proposals for A-ESIM operations in the frequency band 12.75-13.25 GHz � Australia AI1.15 2022-09-05
[ 725 ]
Studies on use of earth stations in motion in relation to sharing and compatibility with fixed service and non-GSO fixed-satellite service in the frequency band 12.75-13.25 GHz � China (People's Republic of) AI1.15 2022-09-05
[ 724 ]
Sharing and compatibility study between maritime earth station in motion (M-ESIM) communicating with non-geostationary-satellites and stations in the fixed service in the frequency band 27.5-29.1 GHz under WRC-23 agenda item 1.16 � China (People's Republic of) AI1.16 2022-09-05
[ 723 ]
Proposed modification to the working document towards a draft CPM text and draft new Resolution for WRC-23 agenda item 1.16 � China (People's Republic of) AI1.16 2022-09-05
[ 722 ]
Proposals on preliminary draft CPM text for WRC-23 agenda item 7, Topic A � China (People's Republic of) AI7A 2022-09-05
[ 721 ]
Preliminary draft CPM text for WRC-23 agenda item 7, Topic C - Protection of geostationary-satellite networks in the mobile-satellite service operating in the 7/8 GHz and 20/30 GHz bands from emissions of non-geostationary-satellite systems operating in the same frequency bands and identical directions � China (People's Republic of) AI7C 2022-09-05
[ 720 ]
Statistics of the new notices of satellite networks submitted under 6.1 of Article 6 of RR Appendix 30B � Director, BR AI7E 2022-09-05
[ 719 ]
Proposed updates to working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] � Romania 2022-09-02
[ 718 ]
Draft revision to Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � Romania 2022-09-02
[ 717 ]
Proposed modifications to the preliminary draft CPM text and a draft new Resolution for WRC-23 agenda item 1.17 � Korea (Republic of) AI1.17 2022-09-02
[ 716 ]
Proposal for modification of the preliminary draft CPM text for WRC-23 agenda item 1.17 in part linked with 11.7-12.7 GHz frequency band � Russian Federation AI1.17 2022-08-30
[ 715 ]
Proposed modifications to the preliminary draft CPM text and draft new Resolution for WRC-23 agenda item 1.16 � Russian Federation AI1.16 2022-08-30
[ 714 ]
Consideration on preliminary draft CPM text for WRC-23 agenda item 7, Topic H � Japan AI7H 2022-08-30
[ 713 ]
Draft CPM text for WRC-23 agenda item 7, Topic F � Japan AI7F 2022-08-30
[ 712 ]
Consideration of the methodology for the assessment of compliance with Resolution 169 (WRC-19) � Korea (Republic of) 2022-08-30
[ 711 ]
Proposed modifications to preliminary draft CPM text and draft new Resolution for WRC-23 agenda item 1.16 � Korea (Republic of) AI1.16 2022-08-30
[ 710 ]
Proposed draft CPM text for WRC-23 agenda item 7, Topic C - Protection of geostationary-satellite networks in the mobile-satellite service operating in the 7/8 GHz and 20/30 GHz bands from emissions of non-geostationary-satellite systems operating in the same frequency bands and identical directions � Korea (Republic of) AI7C 2022-08-30
[ 709 ]
Proposed way-forward for the work and procedures used in the revision of Recommendation ITU-R S.1503 � Mexico 2022-08-29
[ 708 ]
Regarding the new definitions, which are related to satellite orbits for space services � Kazakhstan (Republic of) 2022-08-04
[ 707 ]
Liaison statement to Working Parties 4A and 4B - Draft CPM text on WRC-23 agenda item 1.8 � WP 5B AI1.8 2022-08-03
[ 706 ]
Reply liaison statement to Working Party 4A - Preliminary draft revision of Recommendation ITU-R S.1503 � WP 1C 2022-07-18
[ 705 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4 � WP 5D AI1.4 2022-07-01
[ 704 ]
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5B, 5C, and 7D for information) - WRC-23 agenda item 1.14 Activities � WP 5A AI1.14 2022-06-20
[ 703 ]
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future development of P-series recommendations to address frequencies above 100 GHz � WP 3M 2022-06-14
[ 702 ]
Liaison statement to Working Party 4A (copy to Working Party 7C for information) - Bistatic scattering from the surface of the Earth - WRC-23 agenda item 1.17 � WPs 3J, 3K & 3M AI1.17 2022-06-14
[ 701 ]
Reply liaison statement to Working Party 7C (Copy to Workings Parties 4A, 4C, 5B, 5A and 7D) - WRC-23 agenda item 1.14 � WP 5C AI1.14 2022-06-13
[ 700 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.17 activities � WP 5C AI1.17 2022-06-06
[ 699 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3K, 3M, 4A, 5A, 5B, 7C and 7D for information) - Activities relating to WRC-23 agenda item 1.13 � WP 5C AI1.13 2022-06-06
[ 698 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, and 7C for information) - WRC-23 agenda item 1.15 activities � WP 5C AI1.15 2022-06-06
[ 697 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B and 7C for information) - WRC-23 agenda item 1.16 activities � WP 5C AI1.16 2022-06-06
[ 696 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5B, 5C, and 7C for information) - WRC-23 agenda item 1.15 activities � WP 5A AI1.15 2022-06-06
[ 695 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5B, 5C and 7C for information) - WRC-23 agenda item 1.19 activities � WP 5A AI1.19 2022-06-06
[ 694 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5B, 5C, 7B and 7C for information) - WRC-23 agenda item 1.17 activities � WP 5A AI1.17 2022-06-06
[ 693 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5B, 5C, 7B and 7C for information) - WRC-23 agenda item 1.16 activities � WP 5A AI1.16 2022-06-06
[ 692 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3K, 3M, 4A, 5B, 5C, 7C, and 7D for information) - Activities relating to WRC-23 agenda item 1.13 � WP 5A AI1.13 2022-06-06
[ 691 ]
+Ann.1-44
Report on the meeting of Working Party 4A (Geneva, 11-20 May 2022) � Chairman, WP 4A 2022-05-20
[ 690 ]
Final list of participants - Working Party 4A (Geneva, 11-20 May 2022) � Director, BR 2022-05-20
[ 689 ]
List of documents issued (Documents 4A/522 - 4A/689) � BR, Study Groups Department 2022-05-11
[ 688 ]
Reply liaison statement Working Party 7C (copy to Working Parties 4A, 5A, 5C, 5D, and 7B for information) - Request for information for use in impact studies for EESS (passive) operations in the 6 425-7 250 MHz range under RR No. 5.458 � WP 7A 2022-05-10
[ 687 ]
Statistics on Resolution 40 (Rev.WRC-19) � Director, BR 2022-05-10
[ 686 ]
Proposed modifications to working document on developing an ITU-R Small Satellite Handbook � Director, BR 2022-05-09
[ 685 ]
Proposed modifications to working document on developing an ITU-R Small Satellite Handbook � Director, BR 2022-05-09
[ 684 ]
Proposed modifications to working document on developing an ITU-R Small Satellite Handbook � Director, BR 2022-05-09
Results:983 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19