Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 37 ]
�
� |
Reply liaison statement to Working Party 1A (copy to ITU-R Working Parties 1C, 4A, 4B, and 7D) - Protection of EESS (passive) remote sensors against interference caused by radiation from electrical or electronic equipment
�
� |
WP 7C
� |
� |
2020-10-05 |
|
[ 36 ]
�
� |
Liaison statement to CISPR and CISPR/H (copy to ITU-R Study Groups 1 and Working Parties 1A and 6A) - Additional information about the impact of WPT-EV on LF and MF broadcasting
�
� |
SG 1 RG on Liaison with CISPR
� |
� |
2020-10-01 |
|
[ 35 ]
�
� |
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2020-09-22 |
|
[ 34 ]
�
� |
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2020-09-22 |
|
[ 33 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range
�
� |
WP 7D
� |
� |
2020-09-21 |
|
[ 32 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth
�
� |
WP 3L
� |
� |
2020-08-27 |
|
[ 31 ]
�
� |
Liaison statement to ITU-T Study Group 15 and ITU-R Working Party 1A (copy for information to Working Party 5D) - Utility communication systems
�
� |
WP 5A
� |
� |
2020-08-07 |
|
[ 30 ]
�
� |
Liaison statement to Working Parties 1A and 4C and CISPR - Interference to maritime systems from light emitting diode (LED) lighting located onboard the same vessel
�
� |
WP 5B
� |
� |
2020-08-07 |
|
[ 29 ]
�
� |
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz
�
� |
WP 5C
� |
� |
2020-08-06 |
|
[ 28 ]
�
� |
Reply liaison statement to Working Party 1A - Development of a Recommendation on principles and approaches of limiting unwanted emissions for improving HF electromagnetic environment
�
� |
WP 5C
� |
� |
2020-08-06 |
|
[ 27 ]
�
� |
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz
�
� |
WP 5A
� |
� |
2020-08-06 |
|
[ 26 ]
�
� |
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Party 1A for information) - Working document towards a preliminary draft revision of Report ITU-R M.2417-0
�
� |
WP 5A
� |
� |
2020-08-06 |
|
[ 25 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chairman, CCV
� |
� |
2020-07-14 |
|
[ 24 ]
�
� |
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 - SG2RGQ/200)
�
� |
ITU-T SG5
� |
� |
2020-07-13 |
|
[ 23 ]
�
� |
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other subordinate groups
�
� |
Director, BR
� |
� |
2020-06-25 |
|
[ 22 ]
�
� |
Proposal for the revision of relevant existing questions dealing with electromagnetic compatibility and unintentional electromagnetic emissions
�
� |
Italy
� |
� |
2020-06-19 |
|
[ 21 ]
�
� |
Editorial amendments of Report ITU-R SM.2451-0 - Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services
�
� |
Italy
� |
� |
2020-06-19 |
|
[ 20 ]
�
� |
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan
�
� |
ITU-T SG9
� |
� |
2020-05-27 |
|
[ 19 ]
�
� |
Preliminary position on WRC-23 agenda
�
� |
World Meteorological Organization
� |
� |
2020-05-13 |
|
[ 18 ]
�
� |
Proposed revisions to working document towards a preliminary draft revision of Report ITU-R SM.2392-0
�
� |
United States of America
� |
Q210/1
� |
2020-05-12 |
|
[ 17 ]
�
� |
Proposed revisions to Report ITU-R SM.2451-0 - Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services
�
� |
United States of America
� |
Q210/1
� |
2020-05-12 |
|
[ 16 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R [WPT-EMISSIONS] - Limits and measures to mitigate the impact of wireless power transmission systems on radiocommunications services operating below [30 MHz]
�
� |
United States of America
� |
Q210/1
� |
2020-05-12 |
|
[ 15 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency beam
�
� |
United States of America
� |
Q210/1
� |
2020-05-12 |
|
[ 14 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Recommendation ITU-R SM.[WPT.BEAM.FRQ]
�
� |
United States of America
� |
Q210/1
� |
2020-05-12 |
|
[ 13 ]
�
� |
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC
�
� |
International Special Committee on Radio Interference
� |
� |
2020-05-07 |
|
[ 12 ]
�
� |
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors
�
� |
European Broadcasting Union
� |
� |
2020-04-16 |
|
[ 11 ]
�
� |
Liaison statement to ITU-R - Request for support from ITU-R concerning publication CISPR 28
�
� |
International Special Committee on Radio Interference
� |
� |
2020-03-17 |
|
[ 10 ]
�
� |
Reply liaison statement to Working Party 1C (copy to Working Party 1A) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas
�
� |
WP 5D
� |
� |
2020-03-06 |
|
[ 9 ]
�
� |
Reply liaison statement to ITU-R on Wireless Power Transfer (WPT)
�
� |
International Special Committee on Radio Interference
� |
Q210/1
� |
2020-03-02 |
|
[ 8 ]
�
� |
Response to liaison statement from the ITU-R on interference from LED lighting to maritime VHF communications
�
� |
International Special Committee on Radio Interference
� |
� |
2020-03-03 |
|
[ 7 ]
�
� |
Proposed organization of the work of the Study Group 1
�
� |
Chairman, SG 1
� |
� |
2020-02-26 |
|
[ 6 ]
�
� |
Summary of the main results of RA-19 and CPM23-1 related to Study Group 1
�
� |
Chairman, SG 1
� |
� |
2020-02-26 |
|
[ 5 ]
�
� |
Information from the Radiocommunication Assembly 2019 on the potential impact of unintentional electromagnetic energy generated by electrical or electronic apparatus
�
� |
Director, BR
� |
� |
2020-02-25 |
|
[ 4 ]
�
� |
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2020-02-19 |
|
[ 3 ]
�
� |
Liaison on the new version of the Access Network Transport (ANT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2020-02-19 |
|
[ 2 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R Working Parties 1A, 1C, 4A, 5A, 5C, 5D and 6A on strategies and policies concerning human exposure to EMF
�
� |
ITU-D SG2
� |
� |
2019-11-29 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2015-2019 study period
�
� |
WP 1A
� |
� |
2019-10-31 |
Results:287 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6
� |
Multiple Document Download:�Formats and Languages to be included (when available):