International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1A� C�

ITU-R�WP1A

Spectrum Engineering Techniques

Results:287 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 37 ]
Reply liaison statement to Working Party 1A (copy to ITU-R Working Parties 1C, 4A, 4B, and 7D) - Protection of EESS (passive) remote sensors against interference caused by radiation from electrical or electronic equipment � WP 7C 2020-10-05
[ 36 ]
Liaison statement to CISPR and CISPR/H (copy to ITU-R Study Groups 1 and Working Parties 1A and 6A) - Additional information about the impact of WPT-EV on LF and MF broadcasting � SG 1 RG on Liaison with CISPR 2020-10-01
[ 35 ]
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG15 2020-09-22
[ 34 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2020-09-22
[ 33 ]
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range � WP 7D 2020-09-21
[ 32 ]
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth � WP 3L 2020-08-27
[ 31 ]
Liaison statement to ITU-T Study Group 15 and ITU-R Working Party 1A (copy for information to Working Party 5D) - Utility communication systems � WP 5A 2020-08-07
[ 30 ]
Liaison statement to Working Parties 1A and 4C and CISPR - Interference to maritime systems from light emitting diode (LED) lighting located onboard the same vessel � WP 5B 2020-08-07
[ 29 ]
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz � WP 5C 2020-08-06
[ 28 ]
Reply liaison statement to Working Party 1A - Development of a Recommendation on principles and approaches of limiting unwanted emissions for improving HF electromagnetic environment � WP 5C 2020-08-06
[ 27 ]
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz � WP 5A 2020-08-06
[ 26 ]
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Party 1A for information) - Working document towards a preliminary draft revision of Report ITU-R M.2417-0 � WP 5A 2020-08-06
[ 25 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chairman, CCV 2020-07-14
[ 24 ]
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 - SG2RGQ/200) � ITU-T SG5 2020-07-13
[ 23 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other subordinate groups � Director, BR 2020-06-25
[ 22 ]
Proposal for the revision of relevant existing questions dealing with electromagnetic compatibility and unintentional electromagnetic emissions � Italy 2020-06-19
[ 21 ]
Editorial amendments of Report ITU-R SM.2451-0 - Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services � Italy 2020-06-19
[ 20 ]
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan � ITU-T SG9 2020-05-27
[ 19 ]
Preliminary position on WRC-23 agenda � World Meteorological Organization 2020-05-13
[ 18 ]
Proposed revisions to working document towards a preliminary draft revision of Report ITU-R SM.2392-0 � United States of America Q210/1 2020-05-12
[ 17 ]
Proposed revisions to Report ITU-R SM.2451-0 - Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services � United States of America Q210/1 2020-05-12
[ 16 ]
Working document towards a preliminary draft new Recommendation ITU-R [WPT-EMISSIONS] - Limits and measures to mitigate the impact of wireless power transmission systems on radiocommunications services operating below [30 MHz] � United States of America Q210/1 2020-05-12
[ 15 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency beam � United States of America Q210/1 2020-05-12
[ 14 ]
Proposed revisions to working document towards a preliminary draft new Recommendation ITU-R SM.[WPT.BEAM.FRQ] � United States of America Q210/1 2020-05-12
[ 13 ]
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC � International Special Committee on Radio Interference 2020-05-07
[ 12 ]
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors � European Broadcasting Union 2020-04-16
[ 11 ]
Liaison statement to ITU-R - Request for support from ITU-R concerning publication CISPR 28 � International Special Committee on Radio Interference 2020-03-17
[ 10 ]
Reply liaison statement to Working Party 1C (copy to Working Party 1A) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas � WP 5D 2020-03-06
[ 9 ]
Reply liaison statement to ITU-R on Wireless Power Transfer (WPT) � International Special Committee on Radio Interference Q210/1 2020-03-02
[ 8 ]
Response to liaison statement from the ITU-R on interference from LED lighting to maritime VHF communications � International Special Committee on Radio Interference 2020-03-03
[ 7 ]
Proposed organization of the work of the Study Group 1 � Chairman, SG 1 2020-02-26
[ 6 ]
Summary of the main results of RA-19 and CPM23-1 related to Study Group 1 � Chairman, SG 1 2020-02-26
[ 5 ]
Information from the Radiocommunication Assembly 2019 on the potential impact of unintentional electromagnetic energy generated by electrical or electronic apparatus � Director, BR 2020-02-25
[ 4 ]
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2020-02-19
[ 3 ]
Liaison on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG15 2020-02-19
[ 2 ]
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R Working Parties 1A, 1C, 4A, 5A, 5C, 5D and 6A on strategies and policies concerning human exposure to EMF � ITU-D SG2 2019-11-29
[ 1 ]
Documents to be carried over from the 2015-2019 study period � WP 1A 2019-10-31
Results:287 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-05-31