Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 339 ]
�
� |
Liaison statement - New ITU-T Study Group 13 terms and definitions
�
� |
ITU-R CCV, ITU-T SCV
� |
� |
2018-02-09 |
|
[ 338 ]
�
� |
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 337 ]
�
� |
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison Activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 336 ]
�
� |
Reply liaison statement to Working Party 6A - Comment on the Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities
�
� |
WP 1B
� |
� |
2017-12-08 |
|
[ 335 ]
�
� |
Note to the Chairman of Study Group 6
�
� |
Chairman, SG 5
� |
� |
2017-11-29 |
|
[ 334 ]
�
� |
Liaison statement on Setting Environmental requirements for 5G/IMT-2020
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 333 ]
�
� |
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 332 ]
�
� |
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies
�
� |
WP 5A
� |
AI1.1
� |
2017-11-22 |
|
[ 331 ]
�
� |
Liaison statement to Working Parties 5A, 5D and 6A - Draft revision of Report ITU-R F.2323-0
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 330 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 329 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
�
� |
WP 5B
� |
AI1.10
� |
2017-11-20 |
|
[ 328 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Parties 1A and 1C (copy to Working Parties 5D and 6A) - Interference to EESS (passive) sensors operating in the 1 400-1 427 MHz band caused by radiations at the intermediate frequency of satellite broadcast receiver equipment
�
� |
WP 7C
� |
� |
2017-11-14 |
|
[ 327 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2
�
� |
WP 4A
� |
AI9.1
� |
2017-11-07 |
|
[ 326 ]
�
� |
Reply liaison statement to Working Party 6A - Progress of sharing studies between a 45 MHz radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)
�
� |
WP 7C
� |
AI2.2
� |
2017-11-02 |
|
[ 325 ]
�
� |
Liaison statement to Working Party 6A regarding WRC-19 agenda item 1.3
�
� |
WP 7B
� |
AI1.3
� |
2017-11-01 |
|
[ 324 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems�
�
� |
WP 7A
� |
� |
2017-11-01 |
|
[ 323 ]
�
� |
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7D for information) - Studies on "Wireless Power Transmission (WPT)"
�
� |
WP 7A
� |
Q210/1
� |
2017-11-01 |
|
[ 322 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2017-11-01 |
|
[ 321 ]
�
� |
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
� |
2017-11-03 |
|
[ 320 ]
�
� |
Liaison statement to ITU-R Working Party 5D (copy to ITU-R WPs 5A, 5C, 6A and 6B) - Draft revision of Report ITU-R M.2373
�
� |
WP 6C
� |
� |
2017-10-24 |
|
[ 319 ]
�
� |
Liaison statement to ITU-R Working Party 5D (copy to ITU-R WPs 6A and 6C) - Comments on working document towards draft revision of Report ITU-R M.2373
�
� |
WP 6B
� |
� |
2017-10-23 |
|
[ 318 ]
�
+Ann.1-16� |
Report of the meeting of Working Party 6A (Geneva, 3-11 October 2017)
�
� |
Chairman, WP 6A
� |
� |
2017-10-13 |
|
[ 317 ]
�
� |
Final list of participants Working Party 6A (Geneva, 3-10 October 2017)
�
� |
Director, BR
� |
� |
2017-10-11 |
|
[ 316 ]
�
� |
Liaison statement to ITU-R Working Party 5D (copy to ITU-R WPs 5A, 5C, 6A ad 6B) - Draft revision of Report ITU-R M.2373
�
� |
WP 6C
� |
� |
2017-10-05 |
|
[ 315 ]
�
� |
List of documents issued (Documents 6A/242 - 6A/315)
�
� |
BR Study Groups Department
� |
� |
2017-10-02 |
|
[ 314 ]
�
� |
Report of the Joint Rapporteurs - Advanced immersive audio visual (AIAV) systems for programme production and exchange in broadcasting
�
� |
WP 6C Co-Rapp for AIAV
� |
� |
2017-10-02 |
|
[ 313 ]
�
� |
Activity Report
�
� |
Chairman, CG on MER
� |
� |
2017-09-29 |
|
[ 312 ]
�
� |
Revision of [B3BCPARAM] Document
�
� |
Broadcast Networks Europe
� |
� |
2017-09-27 |
|
[ 311 ]
�
� |
Proposed draft revision - Report ITU-R BT.2140-9
�
� |
Brazil (Federative Republic of)
� |
� |
2017-09-26 |
|
[ 310 ]
�
� |
Estimating relation between field strength and quality parametres of received digital TV signal
�
� |
Iran (Islamic Republic of)
� |
� |
2017-09-26 |
|
[ 309 ]
�
� |
Comment on the working document towards the preliminary draft new Report ITU-R BT.[WBR] - Worldwide television and sound broadcasting roaming
�
� |
Germany (Federal Republic of)
� |
� |
2017-09-26 |
|
[ 308 ]
�
� |
Definition of "Pixel" when used in broadcasting emission
�
� |
Italy
� |
� |
2017-09-26 |
|
[ 307 ]
�
� |
Draft reply liaison statement from Working Party 6A to Working Party 1C concerning the revision of the Recommendation ITU-R SM.1875-2
�
� |
European Broadcasting Union
� |
� |
2017-09-26 |
|
[ 306 ]
�
� |
Update on implementation of DRM broadcasting networks around the world - Report on implementation trials of DRM in cooperation between Radio Republic Indonesia and the DRM Consortium
�
� |
Digital Radio Mondiale
� |
� |
2017-09-26 |
|
[ 305 ]
�
� |
Proposed modifications to the preliminary draft revision of Report ITU-R BT.2069-6 - Tuning ranges and operational characteristics of terrestrial electronic news gathering (ENG), television outside broadcast (TVOB) and electronic field production (EFP) systems
�
� |
France
� |
� |
2017-09-26 |
|
[ 304 ]
�
� |
Proposed modifications to preliminary draft revision of Recommendation ITU-R BT.2036
�
� |
France
� |
� |
2017-09-26 |
|
[ 303 ]
�
� |
Proposed modifications to the preliminary draft revision of Recommendation ITU-R BT.1871-1 - User requirements for wireless microphones
�
� |
France
� |
� |
2017-09-26 |
|
[ 302 ]
�
� |
Report on recent developments on WPT under issue 9.1.6 of WRC-19
�
� |
Rapporteur, RG - WPT
� |
� |
2017-09-26 |
|
[ 301 ]
�
� |
Report on recent developments concerning PLT systems and general EMC-related potential interference issues (Question ITU-R 221/1)
�
� |
Rapp. on PLT and general EMC-related
� |
Q221/1
� |
2017-09-25 |
|
[ 300 ]
�
� |
Proposals to clarify some terms used in Report ITU-R BT.2400 and in Question ITU-R 140/6
�
� |
Italy
� |
Q140/6
� |
2017-09-25 |
|
[ 299 ]
�
� |
Update on implementation of DRM broadcasting networks around the world - Implementation consideration for the transition to digital terrestrial sound and multimedia broadcasting
�
� |
Digital Radio Mondiale
� |
� |
2017-09-25 |
|
[ 298 ]
�
� |
Proposed revision of Report ITU-R BT.2140-9 - "Transition from analogue to digital terrestrial broadcasting"
�
� |
Italy
� |
� |
2017-09-25 |
|
[ 297 ]
�
� |
Proposals on various definitions relevant to the delivery of broadcaster' programs
�
� |
Italy
� |
� |
2017-09-25 |
|
[ 296 ]
�
� |
Proposed revision of Report ITU-R BT.2344-1 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting
�
� |
Japan
� |
� |
2017-09-25 |
|
[ 295 ]
�
� |
Proposed revision of Report ITU-R BT.2343-2 - Collection of field trials of UHDT over DTT networks
�
� |
Japan
� |
Q133/6
� |
2017-09-25 |
|
[ 294 ]
�
� |
Preliminary draft revision of Resolution 647 (Rev. WRC-15) - Radiocommunication aspects, including spectrum management guidelines, for early warning, disaster prediction, mitigation and relief operations relating to emergencies and disasters
�
� |
High Frequency Co-ordination Conference
� |
� |
2017-09-25 |
|
[ 293 ]
�
� |
Preliminary draft revision of Resolution 641 (REV.HFBC-87) - Use of the frequency band 7 000-7 100 kHz
�
� |
High Frequency Co-ordination Conference
� |
� |
2017-09-25 |
|
[ 292 ]
�
� |
Editorial amendment to Report ITU-R BT.2302
�
� |
Rai Way S.p.A.
� |
� |
2017-09-25 |
|
[ 291 ]
�
� |
Compatibility between DTMB and the third or fourth generation mobile communications system
�
� |
China (People's Republic of)
� |
� |
2017-09-25 |
|
[ 290 ]
�
� |
A new single frequency network scheme for digital terrestrial multimedia broadcasting
�
� |
China (People's Republic of)
� |
Q136/6
� |
2017-09-25 |
Results:589 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):