Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 169 ]
�
(Rev.1)� |
Report on the activities of Correspondence Group 3J-3M-13 - Validation examples
�
� |
CG 3J-3M-13
� |
� |
2017-03-14 |
|
[ 168 ]
�
� |
Information document concerning atmospheric and other attenuation effects to be considered on sharing and compatibility studies at frequency range between 24.25 and 86 GHz
�
� |
European Union
� |
� |
2017-03-14 |
|
[ 167 ]
�
� |
Evaluation of recent rainfall rate and variability prediction models using a long-term database of rainfall rate
�
� |
Spain
� |
� |
2017-03-14 |
|
[ 166 ]
�
� |
Contribution to the propagation data banks - Rain rate and slant-path rain attenuation measurements in Madrid
�
� |
Spain
� |
� |
2017-03-14 |
|
[ 165 ]
�
� |
Proposed channel parameters based on building entry loss and building material loss measurement results using a multifrequency sounder for the development of IMT-2020 channel models
�
� |
Canada
� |
� |
2017-03-10 |
|
[ 164 ]
�
� |
Report on activities of the Correspondence Group - Building Entry Loss
�
� |
CG 3J-3K-3M-8
� |
� |
2017-03-14 |
|
[ 163 ]
�
� |
Clutter loss for slant paths by site-shielding in urban environments
�
� |
Japan
� |
� |
2017-03-14 |
|
[ 162 ]
�
� |
Measurements on slant-path building entry loss
�
� |
Telstra Corporation Ltd.
� |
� |
2017-03-14 |
|
[ 161 ]
�
� |
Measurements on urban building clutter loss
�
� |
Telstra Corporation Ltd.
� |
� |
2017-03-13 |
|
[ 160 ]
�
� |
Proposed liaison statement to ITU-R Task Group 5/1 in response to Decides 4) of Annex 9 of Administrative Circular CA-226
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 159 ]
�
� |
Revision of Work Plan in response to Decides 4) in Annex 9 (CPM19-1 Decision on the establishment and Terms of Reference of Study Group 5 Task Group 5/1 (TG 5/1) on WRC-19 agenda item 1.13) of CA/226
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 158 ]
�
� |
Comments on ITU-R propagation models and Recommendations
�
� |
France
� |
� |
2017-03-14 |
|
[ 157 ]
�
� |
Draft revision to Fascicle on application, validation and data processing of atmospheric path length standard deviation statistics for ground-based antenna array performance predictions
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 156 ]
�
� |
Working document toward a preliminary draft revision of Recommendation ITU-R P.452-16 - Prediction procedure for the evaluation of interference between stations on the surface of the Earth at frequencies above about 0.1 GHz
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 155 ]
�
� |
Working document toward a preliminary draft revision of Report ITU-R P.2346-1 - Compilation of measurement data relating to building entry loss
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 154 ]
�
� |
Contribution to the propagation databanks: path length turbulence statistics for goldstone, CA (Apollo site); Canberra, Australia; Madrid, Spain and Kennedy Space Center, Florida
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 153 ]
�
� |
Proposed draft liaison statement to Working Party 4A regarding support on propagation correlation for the update of Recommendation ITU-R S.1323
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 152 ]
�
� |
Revision to Study Group 3 Data Banks formatted Tables Part VII
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 151 ]
�
� |
The clutter loss in the Recommendations ITU-R P.452, ITU-R P.1546 and ITU-R P.1812
�
� |
ORANGE POLSKA S.A.
� |
� |
2017-03-13 |
|
[ 150 ]
�
� |
Building entry loss measurements at 3, 10, 17 and 60 GHz frequencies
�
� |
Orange
� |
� |
2017-03-10 |
|
[ 149 ]
�
� |
Study on the combined effects of gaseous absorption and scintillation losses on low elevation slant paths and proposals for the Revision of Recommendation ITU-R P.619-1
�
� |
Canada
� |
� |
2017-03-10 |
|
[ 148 ]
�
� |
Chairman's Report
�
� |
CG 3M-14
� |
� |
2017-02-22 |
|
[ 147 ]
�
� |
Activity Report
�
� |
Rapporteurs CG 3K-3M-12
� |
� |
2017-02-21 |
|
[ 146 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 145 ]
�
� |
Reply liaison statement to Working Parties 3M and 3J (copied for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 144 ]
�
� |
Liaison statement to Working Parties 3K and 3M - Propagation models for compatibility studies regarding WRC-19 agenda item 1.16
�
� |
WP 5A
� |
� |
2016-11-29 |
|
[ 143 ]
�
� |
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 AI 1.13
�
� |
WP 5A
� |
AI1.13
� |
2016-11-23 |
|
[ 142 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5C, 5D and 7D for information) - Operational requirements and technical characteristics of systems in the frequency band 51.4-52.4 GHz
�
� |
WP 5A
� |
� |
2016-11-23 |
|
[ 141 ]
�
� |
Reply liaison statement to ITU-R Working Parties 1A, 3J, 3M (copy to Working Party 4A for information) - Revision of Recommendations ITU-R SM.1448 and ITU-R P.620
�
� |
WP 5C
� |
� |
2016-11-21 |
|
[ 140 ]
�
� |
Reply liaison statement to Working Party 1A copied to Working Parties 1A, 3J, 3M, 4A, 4C 5A, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 5B
� |
� |
2016-11-18 |
|
[ 139 ]
�
� |
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15
�
� |
WP 5A
� |
� |
2016-11-18 |
|
[ 138 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15
�
� |
WP 5A
� |
� |
2016-11-18 |
|
[ 137 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 136 ]
�
� |
Reply liaison statement to Working Party 5B on technical characteristics for the fixed service for studies under WRC-19 agenda item 1.9.2 (copy to Working Parties 1A, 3M, 4C, 5A, 6A, 7B and 7D for information)
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 135 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C and 7D (copy for information to Working Parties 3K and 3M) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 134 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5D, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 133 ]
�
� |
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 3J, 3K, 3M, 4A, 4C, 5B and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 132 ]
�
� |
Reply liaison statement to ITU-R Working Party 4A (copy for information to Working Parties 3M and 5A) - Providing fixed service information for studies under WRC-19 agenda item 1.5 and identifying issues to consider when modelling interference into the fixed service from earth stations in motion (ESIMs)
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 131 ]
�
� |
Liaison statement to Working Party 1A and IEEE (copy to Working Parties 3M, 5A, 7C and 7D for information) - Preliminary information on fixed service applications associated with work on WRC-19 agenda item 1.15
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 130 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 6A
� |
� |
2016-11-04 |
|
[ 129 ]
�
� |
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) WRC-19 agenda item 1.1
�
� |
WP 6A
� |
AI1.1
� |
2016-11-04 |
|
[ 128 ]
�
� |
Liaison statement to Working Parties 3K and 3M (copy for information to Working Parties 4C and 5D) - Propagation model for compatibility study regarding WRC-19 agenda item 9.1, issue 9.1.2
�
� |
WP 4A
� |
AI9.1
� |
2016-11-02 |
|
[ 127 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 4A
� |
� |
2016-11-02 |
|
[ 126 ]
�
� |
Reply liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M for information) - WRC-19 agenda item 1.13
�
� |
WP 7C
� |
AI1.13
� |
2016-11-02 |
|
[ 125 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 5C, 5D, 6A and 7C) - WRC-19 agenda items 1.6 and 9.1, issue 9.1.9
�
� |
WP 7D
� |
AI9.1, AI1.6
� |
2016-11-01 |
|
[ 124 ]
�
� |
Revision of Recommendation ITU-R P.620
�
� |
ATDI
� |
� |
2016-11-01 |
|
[ 123 ]
�
� |
Revision of Recommendation ITU-R SM.1448 based on Recommendation ITU-R P.620
�
� |
ATDI
� |
� |
2016-10-24 |
|
[ 122 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 121 ]
�
� |
Liaison statement to Working Party 3M - Support for the update of Recommendation ITU-R S.1323-2
�
� |
WP 4A
� |
� |
2016-10-24 |
|
[ 120 ]
�
� |
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-10-17 |
Results:419 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):