International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5C� C�

ITU-R�WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:437 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 187 ]
Liaison statement on determination of the ITU-T G.fast PSD specification � ITU-T SG 15 2013-07-24
[ 186 ]
Liaison statement to Working Party 5C and ITU-T Study Groups 13 and 15 (copy for information to Working Party 5A) on development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems � WP 5D 2013-07-22
[ 185 ]
Liaison statement to Working Parties 5A and 5C - Improved sectoral antenna pattern approximations in Recommendation ITU-R F.1336 � WP 5D 2013-07-22
[ 184 ]
Liaison statement to ITU-T Study Group 13 Question 16/13 (copy to ITU-R Study Group 1 and for information to Working Parties 5A, 5B and 5C) � WP 5D 2013-07-22
[ 183 ]
Liaison statement to Working Party 5C - Propagation models for planning and interference assessment involving fixed service links in bands above 50 GHz � WPs 3M, 3J and 3K 2013-07-01
[ 182 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities � WP 1B 2013-06-21
[ 181 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station � WP 1B 2013-06-21
[ 180 ]
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks � WP 1A 2013-06-14
[ 179 ]
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast � WP 1A 2013-06-14
[ 178 ]
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T � WP 1A 2013-06-14
[ 177 ]
Liaison statement to ITU-T Study Group 9 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req) � WP 1A 2013-06-14
[ 176 ]
Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 5A, 5C and 5D for information) - Preparations for WRC-15 Agenda item 1.1 - Additional technical and operational characteristics � WP 5B 2013-06-11
[ 175 ]
Liaison statement to Working Parties 5B and 5C (copy for information to Working Party 3L) - WRC-15 Agenda item 1.4 - Status of studies and draft CPM text for WRC-15 Agenda item 1.4 � WP 5A 2013-06-06
[ 174 ]
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1 � WP 5A 2013-06-04
[ 173 ]
Reply liaison statement to Working Party 5C - Fixed service information for the 71 - 76 GHz and 81 - 86 GHz bands � WPs 5A and 5B 2013-06-04
[ 172 ]
Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing � WP 5A 2013-06-03
[ 171 ]
+Ann.1-18
Report on the eleventh meeting of Working Party 5C (Geneva, 20-29 May 2013) � Chairman, WP 5C 2013-05-29
[ 170 ]
Final list of participants - Working Party 5C (Geneva, 20-29 May 2013) � Director, BR 2013-05-29
[ 169 ]
Results of the 20th RAG meeting � Chairman, SG 5 2013-05-27
[ 168 ]
Liaison statement - WRC-15 Agenda item 1.16 � WP 5B 2013-05-24
[ 167 ]
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076 � WP 5B 2013-05-24
[ 166 ]
List of documents issued (Documents 5C/112 - 5C/166) � BR Study Groups Department 2013-05-17
[ 165 ]
Liaison statement to Working Party 5C - WRC-15 Agenda item 1.8 � WP 4A 2013-05-16
[ 164 ]
Liaison statement to Working Party 5C - WRC-15 Agenda item 1.6 � WP 4A 2013-05-16
[ 163 ]
Liaison statement to Working Party 5C - Review of SF-series Recommendations � WP 4A 2013-05-16
[ 162 ]
Liaison statement to Working Parties 5A, 5C and 7B - WRC-15 Agenda item 1.9.1 � WP 4A 2013-05-16
[ 161 ]
Proposed liaison statement to Working Parties 3J, 3M and other regional organizations - Studies on fixed service use and trends � United Kingdom of Great Britain and Northern Ireland 253/5 2013-05-13
[ 160 ]
Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range above 1 GHz � Telefon AB - LM Ericsson 2013-05-13
[ 159 ]
Progress Report of Joint Correspondence Group Activity � Chairman, JCG 5A/5C 2013-05-13
[ 158 ]
Consideration on a new approach for reference sectoral antenna patterns in recommendation ITU-R F.1336-3 � Japan 242-1/5 2013-05-13
[ 157 ]
Proposed revision of Recommendation ITU-R F.1105-2 - Fixed wireless systems for disaster mitigation and relief operations � Japan 248/5 2013-05-13
[ 156 ]
Proposed revision of Recommendation ITU-R F.557-4 - Availability objective for radio-relay systems over a hypothetical reference circuit and a hypothetical reference digital path � Japan 2013-05-13
[ 155 ]
Working document towards a preliminary draft revision of Recommendation ITU-R F.1336-3 - Reference radiation patterns of sectoral antennas in point-to-multipoint systems for use in sharing studies in the frequency range from [X] MHz to about 70 GHz � Telstra Corporation Ltd. 2013-05-13
[ 154 ]
Antenna radiation pattern data for IMT networks operating in bands below 1GHhz � Telstra Corporation Ltd. 2013-05-13
[ 153 ]
Proposal for a new question on fixed point-to-point wireless system used in packet-based network � Huawei Technologies Co. Ltd. , China Mobile Communications Corporation 2013-05-10
[ 152 ]
Views on "Report on backhaul in support of IMT Systems" � United States of America 2013-05-10
[ 151 ]
Report on the Correspondence Group on fixed service use and future trends � Chairman, CG FS-trends 2013-05-10
[ 150 ]
Distribution of antenna elevation in the fixed service in Poland � TELEKOMUNIKACJA POLSKA S.A. 2013-05-10
[ 149 ]
Proposed working document towards a preliminary draft new Report ITU-R F.[FS.IMT] - IMT tranport network applications in the fixed service � Canada 2013-05-09
[ 148 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and automotive collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz � Canada 2013-05-09
[ 147 ]
Liaison statement to Working Party 3L (copy to Working Party 5C) - Proposed amendment to Recommendation ITU-R P.842 � WP 6A 2013-05-09
[ 146 ]
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems � WP 6A 2013-05-08
[ 145 ]
Liaison statement to Working Party 1A (and for information to ITU-R Working Parties 5A, 5B and 5C and ITU-T Study Groups 5, 9 & 15) - Considerations on wired telecommunication systems being developed under G.fast and J.HiNoC � WP 6A 2013-05-08
[ 144 ]
Liaison statement - Request to provide security contacts � ITU-T SG 17 2013-05-08
[ 143 ]
On the termination of Recommendation ITU-R F.1502-1 and interpretation of No. 5.462A of the Radio Regulations Article 5 � Russian Federation 2013-05-08
[ 142 ]
(Rev.1)
Proposed liaison statement to Working Parties 7C and 7D - Description of certain electronic news gathering (ENG) systems operating in the 2 025-2 110 MHz band � Australia 2013-05-08
[ 141 ]
(Rev.1)
Preliminary draft new Report - Sharing and compatibility issues between ENG and other systems in frequency bands allocated to the fixed and mobile and broadcasting services � Australia 252/5 2013-05-08
[ 140 ]
Liaison statement to Working Party 5C - Studies to assist coordination between RDSS or MSS and the fixed service in the 2 483.5-2 500 MHz band � WP 4C 2013-05-06
[ 139 ]
Liaison statement on DNR F.[FS-SDR] - Software defined radio information on ETSI and ECC related activities � European Telecommunications Standards Institute 2013-04-19
[ 138 ]
Proposal for revision of Recommendation ITU-R F.1497-1 - Radio-frequency channel arrangements for fixed wireless systems operating in the band 55.78-59 66 GHz � Sweden 2013-04-16
Results:437 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-10-06