Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 200 ]
�
� |
Preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY]- Methodology to calculate aeronautical mobile-satellite(R) service spectrum requirements within the frequency bands 1 545- 1 555 MHz (space-to-Earth) and 1646.5-1656.5 MHz (Earth-to-space)
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
83-6/4
� |
2013-09-16 |
|
[ 199 ]
�
� |
Preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY] - Methodology to calculate aeronautical mobile-satellite (R) service spectrum requirements within the frequency bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space)
�
� |
Canada
,
United States of America
� |
83-6/4
� |
2013-09-16 |
|
[ 198 ]
�
� |
Agenda item 1.10 To consider spectrum requirements and possible additional spectrum allocations for the mobile-satellite service in the Earth-to-space and space-to-Earth directions, including the satellite component for broadband applications, including International Mobile Telecommunications (IMT), within the frequency range from 22 GHz to 26 GHz, in accordance with Res. 234
�
� |
Thuraya Telecommunications Company
� |
� |
2013-09-16 |
|
[ 197 ]
�
� |
Proposed revisions to preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY] - Methodology to calculate aeronautical mobile-satellite (R) service spectrum requirements within the frequency bands 1 545-1 555 MHz (space-to-Earth)
and 1 646.5-1 656.5 MHz (Earth-to-space)
�
� |
Russian Federation
� |
� |
2013-09-13 |
|
[ 196 ]
�
� |
Proposals for WRC-15 agenda item 1.10
�
� |
Russian Federation
� |
� |
2013-09-13 |
|
[ 195 ]
�
� |
Proposals to modification Annex 1 to the working document towards a preliminary draft new Report ITU-R M.[MSS SHARE] - Sharing between GSO MSS and other services in the allocations in the 22-26 GHz range
�
� |
Russian Federation
� |
� |
2013-09-13 |
|
[ 194 ]
�
� |
Proposals to modify working document - Draft CPM text for WRC-15 agenda item 1.10
�
� |
Russian Federation
� |
� |
2013-09-13 |
|
[ 193 ]
�
� |
Proposals on WRC-15 agenda item 9.1.1
�
� |
Russian Federation
� |
� |
2013-09-13 |
|
[ 192 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-15
�
� |
Chairman, CPM-15
� |
� |
2013-09-10 |
|
[ 191 ]
�
� |
Liaison statement to ITU-R Study Groups 4, 6 and 7 and to ITU-T Study Group 5 - The effect on Telecommunications of an extreme solar event
�
� |
WP 3L
� |
� |
2013-07-25 |
|
[ 190 ]
�
� |
Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528
�
� |
WP 3K
� |
233/3
� |
2013-07-05 |
|
[ 189 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities
�
� |
WP 1B
� |
� |
2013-06-21 |
|
[ 188 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 Agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station
�
� |
WP 1B
� |
� |
2013-06-21 |
|
[ 187 ]
�
� |
Liaison statement to Working Party 4C - Draft revision of Recommendation ITU-R SM.1051
�
� |
WP 1C
� |
� |
2013-06-20 |
|
[ 186 ]
�
� |
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 185 ]
�
� |
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 184 ]
�
� |
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 183 ]
�
� |
Liaison statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 182 ]
�
� |
Liaison statement to ITU-R Working Party 4C - Information about the use of MSS systems in disaster response and relief
�
� |
ITU-T FG DR&NRR
� |
� |
2013-06-13 |
|
[ 181 ]
�
� |
Liaison statement to Working Party 4C (copy to Working Party 4A) - WRC-15 Agenda item 1.10
�
� |
WP 5B
� |
� |
2013-06-12 |
|
[ 180 ]
�
� |
Liaison statement to Working Party 4C - Working document on a PDN Report ITU-R M.[ADS-B]
�
� |
WP 5B
� |
� |
2013-06-05 |
|
[ 179 ]
�
� |
Liaison statement to COSPAS-SARSAT (copy to ITU-R Working Party 4C for information)
�
� |
WP 5B
� |
� |
2013-06-05 |
|
[ 178 ]
�
� |
Liaison statement to Working Party 4C - Studies to assist coordination between RDSS or MSS and the fixed service in the 2 483.5-2 500 MHz band
�
� |
WP 5C
� |
� |
2013-06-05 |
|
[ 177 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
� |
2013-06-04 |
|
[ 176 ]
�
� |
Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems
�
� |
WPs 5A, 5B and 5C
� |
� |
2013-06-03 |
|
[ 175 ]
�
� |
Liaison statement to Working Parties 5A, 5C and 4C - (WRC-15 Agenda item 1.16)
�
� |
WP 5B
� |
� |
2013-05-24 |
|
[ 174 ]
�
� |
Liaison statement on nomination of JCA-AHF representatives
�
� |
ITU-T JCA-AHF
� |
� |
2013-05-14 |
|
[ 173 ]
�
+Ann.1-20� |
Report on the eleventh meeting of Working Party 4C (Geneva, 25 April - 1 May 2013)
�
� |
Chairman, WP 4C
� |
� |
2013-05-01 |
|
[ 172 ]
�
� |
Final list of participants - Working Party 4C (Geneva, 25 April - 1 May 2013)
�
� |
Director, BR
� |
� |
2013-05-01 |
|
[ 171 ]
�
� |
List of documents issued (Documents 4C/91 - 4C/171)
�
� |
BR Study Groups Department
� |
� |
2013-04-26 |
|
[ 170 ]
�
� |
ICT sectorial consultation on the role of ICTS to promote the inclusion of persons with disabilities - Request for inputs from relevant ITU-R Study Groups
�
� |
Note by the Secretary-General
� |
� |
2013-04-19 |
|
[ 169 ]
�
� |
Question ITU-R 136-1/6
�
� |
SG 6
� |
� |
2013-04-19 |
|
[ 168 ]
�
� |
Agenda item 1.10 - To consider spectrum requirements and possible additional spectrum allocations for the mobile-satellite service in the Earth-to-space and space-to-Earth directions, including the satellite component for broadband applications, including International Mobile Telecommunications (IMT), within the frequency range from 22 GHz to 26 GHz, ...
�
� |
United Arab Emirates
� |
� |
2013-04-18 |
|
[ 167 ]
�
� |
Proposed preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY] in response to Resolution 422 (WRC-12)
�
� |
Japan
� |
83-6/4
� |
2013-04-18 |
|
[ 166 ]
�
� |
Proposed modifications to preliminary draft revision of Recommendation ITU-R M.1831 - A coordination methodology for RNSS inter-system interference estimation
�
� |
Japan
� |
217-2/4
� |
2013-04-18 |
|
[ 165 ]
�
� |
Preliminary draft revision of Recommendation ITU-R M.1787-1 - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
�
� |
Japan
� |
288/4, 217-2/4
� |
2013-04-18 |
|
[ 164 ]
�
� |
Information document to Working Party 4C - Space-based ADS-B
�
� |
United States of America
� |
� |
2013-04-17 |
|
[ 163 ]
�
� |
Preliminary draft new Recommendation ITU-R M.[MSS 400 MHz] - Characteristics and protection criteria for non-GSO MSS operation in the band 399.9-400.05 MHz
�
� |
France
� |
� |
2013-04-17 |
|
[ 162 ]
�
� |
Proposed revision of Recommendation ITU-R M.1478-2 concerning GALILEO MEOSAR space segment - Protection criteria for Cospas-Sarsat search and rescue instruments in the band 406-406.1 MHz
�
� |
France
,
European Space Agency
� |
� |
2013-04-17 |
|
[ 161 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[AI_9.1.1] - WRC-15 Agenda item 9.1.1 - Protection of the 406-406.1 MHz band
�
� |
France
,
European Space Agency
� |
� |
2013-04-17 |
|
[ 160 ]
�
� |
Proposal of CPM text concerning Agenda item 9.1.1
�
� |
France
� |
� |
2013-04-17 |
|
[ 159 ]
�
� |
Proposed revisions to a preliminary draft new Report ITU-R M.[AI_9.1.1] - WRC-15 Agenda item 9.1.1 - Protection of the 406-406.1 MHz band
�
� |
France
� |
� |
2013-04-17 |
|
[ 158 ]
�
� |
Working document towards a draft CPM text for protection of the systems operating in the mobile-satellite service in the band 406 - 406.1 MHz - WRC-15 Agenda item 9.1.1 - Protection of the 406-406.1 MHz band
�
� |
Canada
� |
� |
2013-04-17 |
|
[ 157 ]
�
� |
Working document in response to Resolution 422 (WRC-12) - General principles, guidelines and example methodology to calculate spectrum requirements to satisfy AMS(R)S access within the bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space)
�
� |
Canada
,
United States of America
� |
83-6/4
� |
2013-04-17 |
|
[ 156 ]
�
� |
Spectrum requirements for future maritime mobile satellite service in the band 7/8 GHz
�
� |
France
� |
� |
2013-04-17 |
|
[ 155 ]
�
� |
Sharing between the fixed service and the maritime-mobile satellite service (space-to-Earth) - WRC-15 Agenda item 1.9.2
�
� |
France
� |
� |
2013-04-17 |
|
[ 154 ]
�
� |
Sharing study between the EESS (space-to-Earth) and the MMSS (Earth-to-space) in the band 8 025-8 400 MHz
�
� |
France
� |
� |
2013-04-17 |
|
[ 153 ]
�
� |
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)
�
� |
ITU-T FG-DR&NRR
� |
� |
2013-04-17 |
|
[ 152 ]
�
� |
Working document towards preliminary draft new Report ITU-R M.[RNSS_MULTI_EESS] - Consideration of aggregate RFI event potentials from multiple EESS systems on RNSS receivers in the 1 215-1 300 MHz frequency band
�
� |
United States of America
� |
� |
2013-04-16 |
|
[ 151 ]
�
� |
Draft liaison statement to the International Civil Aviation Organization (copy to ITU-R Working Party 5B) - Request for information on current and planned AM(R)S systems operating in the 5 030-5 091 MHz band
�
� |
United States of America
� |
� |
2013-04-16 |
Results:450 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):