Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 353 ]
�
� |
Modifications to the draft CPM text for WRC-12 Agenda item 1.20
�
� |
France
,
Germany (Federal Republic of)
,
Sweden
,
Finland
,
Netherlands (Kingdom of the)
� |
� |
2010-04-30 |
|
[ 352 ]
�
� |
Liaison statement to Working Party 5C - Review of certain SF-Series Recommendations
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 351 ]
�
� |
Liaison statement to Working Party 5C - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 350 ]
�
� |
Liaison statement to Working Party 5C - Estimation of probability of causing harmful interference to FS terrestrial stations from geostationary BSS satellites in the frequency band 21.4-22.0 GHz
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 349 ]
�
� |
Liaison statement to Working Party 5C - Revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 KHz) of an angle modulated carrier"
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 348 ]
�
� |
Liaison statement to Working Party 5C for action (copy to Working Party 4C for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 347 ]
�
� |
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 346 ]
�
� |
Amendments to PDNR ITU-R F.[HAPS Gateway]
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 345 ]
�
� |
Preliminary draft new Recommendation ITU-R F.[HAPS CHAR] - Technical and operational characteristics of gateway links in the fixed service using high altitude platform stations in the band 5 850-7 075 MHz to be used in sharing studies
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 344 ]
�
� |
Proposed revisions to draft text for the CPM Report, Chapter 3 for WRC-12 Agenda item 1.5
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 343 ]
�
� |
Interference modelling between HAPS gateway links and the fixed-satellite service in the 5 850-7 075 MHz band]
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 342 ]
�
� |
Consideration of the PFD limits required to protect point-to-point fixed service receivers in one administration from interference from high altitude platform gateway systems operating in another administration in the frequency range 5 850-7 025 MHz
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 341 ]
�
� |
Comments on potential tuning ranges for harmonization of spectrum for use by terrestrial electronic news gathering systems and the need for sharing studies
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 340 ]
�
� |
Interference analysis modeling for sharing between HAPS gateway links and existing services in the range 5 850-7 075 MHz
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 339 ]
�
� |
Analysis of the impact of interference into HAPS gateway links from GSO FSS Earth-to-space links in the 5 850-6 725 MHz frequency band
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 338 ]
�
� |
Proposed revisions to a working document toward a draft new Report ITU-R F.[FS-SDR] on the impact of Software Defined Radio (SDR) and Cognitive Radio Systems (CRS) on the fixed service
�
� |
United States of America
� |
� |
2010-04-29 |
|
[ 337 ]
�
� |
Improved method of calculating line-of-sight interference into radio-relay systems to account for terrain scattering in Recommendation ITU-R F.1096
�
� |
Russian Federation
� |
� |
2010-04-29 |
|
[ 336 ]
�
� |
Results of interference assessment of HAPS gateway links into the FSS systems in frequency band 5 850 - 7 075 MHz (WRC-12 Agenda item 1.20)
�
� |
Russian Federation
� |
� |
2010-04-29 |
|
[ 335 ]
�
� |
Working document toward PDNR "Radio frequency channel arrangement for fixed service systems operating in the band 92 - 95 GHz"
�
� |
Russian Federation
� |
� |
2010-04-29 |
|
[ 334 ]
�
� |
Proposal for draft liaison statement to Working Party 4C on WRC-12 Agenda item 1.25 - Sharing between broadcasting auxiliary services in fixed service and mobile satellite service in the band 7 055-7 250 MHz and 10.5- 10.6 GHz
�
� |
Japan
� |
� |
2010-04-28 |
|
[ 333 ]
�
� |
Draft liaison statement to Working Party 1A - Additional text to the draft CPM text for WRC-12 Agenda item 1.6 (Resolution 955)
�
� |
Japan
� |
� |
2010-04-28 |
|
[ 332 ]
�
� |
Draft revision of Report ITU-R F.2106 - Fixed service applications using free-space optical links
�
� |
Japan
� |
245/5
� |
2010-04-28 |
|
[ 331 ]
�
� |
Proposed modifications to the working document toward a preliminary draft revision of Recommendation ITU-R F.1336-2
�
� |
Japan
� |
� |
2010-04-28 |
|
[ 330 ]
�
� |
Further review of certain F-series Recommendations
�
� |
Japan
� |
� |
2010-04-28 |
|
[ 329 ]
�
� |
Work on the revision of Recommendation ITU-R F.1335 - Technical and operational considerations in the phased transitional approach for bands shared between the mobile-satellite service and the fixed service at 2 GHz
�
� |
Japan
� |
� |
2010-04-28 |
|
[ 328 ]
�
� |
Proposed revisions to draft text for the CPM Report, Chapter 3 for WRC-12 Agenda item 1.5
�
� |
Germany (Federal Republic of)
� |
� |
2010-04-27 |
|
[ 327 ]
�
� |
Technical studies on the impact from HAPS gateway links to fixed and mobile service applications operating in the 5 850-7 075 MHz band
�
� |
France
� |
� |
2010-04-27 |
|
[ 326 ]
�
� |
Liaison statement to Working Parties 3J and 3M for action (copy to WP 5C for information) - Comparison of combined attenuation due to fading / enhancement due to scintillation and multipath mechanism and attenuation due to gaseous absorption with attenuation due to gaseous absorption for interference assessment from space-to-Earth emissions for frequency bands above about 17 GHz
�
� |
WP 4A
� |
� |
2010-04-26 |
|
[ 325 ]
�
� |
Preliminary draft revision on Report ITU-R F.2107 - Characteristics and applications of fixed wireless systems operating in the 57 GHz to 130 GHz band
�
� |
France
� |
� |
2010-04-21 |
|
[ 324 ]
�
� |
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-12 Agenda item 1.13
�
� |
WP 4A
� |
� |
2010-04-14 |
|
[ 323 ]
�
� |
Follow-up study after the work of Joint Task Group 5-6 is over
�
� |
Chairmen, SGs 5 and 6
� |
� |
2010-04-12 |
|
[ 322 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 4A for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems (WRC-12 Agenda item 1.5)
�
� |
WP 4C
� |
� |
2010-03-23 |
|
[ 321 ]
�
� |
Liaison statement to Working Party 5C (copied to Working Party 6A for information) - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 5D
� |
� |
2010-03-22 |
|
[ 320 ]
�
� |
Liaison statement to Working Party 6A (copied to Working Parties 5A, 5B and 5C for information) - Sharing and compatibility studies related to IMT systems in the mobile service
�
� |
WP 5D
� |
� |
2010-03-22 |
|
[ 319 ]
�
� |
ITU-T G.9960 collaboration to address power line communication signal power
�
� |
ITU-T SG 15
� |
� |
2010-03-05 |
|
[ 318 ]
�
� |
Results of the 17th RAG meeting
�
� |
Chairman, SG 5
� |
� |
2010-03-03 |
|
[ 317 ]
�
� |
ABU views on WRC-12 Agenda items 1.5 and 1.13
�
� |
Asia-Pacific Broadcasting Union (ABU)
� |
� |
2010-02-26 |
|
[ 316 ]
�
� |
Liaison statement to the relevant Working Parties of Study Groups 4, 5, 6 and 7 (copy to ITU-T Study Group 15 for information) - Further work on power line telecommunications
�
� |
WP 1A
� |
221-1/1
� |
2010-03-01 |
|
[ 315 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 5A for information) - Preliminary draft revision of Recommendation ITU-R F.1191 - Bandwidths and unwanted emissions of digital fixed service systems
�
� |
WP 1A
� |
� |
2010-02-18 |
|
[ 314 ]
�
� |
Liaison statement to Working Parties 5C and 7B - Draft CPM text for WRC-12 Agenda item 1.6 - Resolution 955 (WRC-07)
�
� |
WP 1A
� |
� |
2010-02-18 |
|
[ 313 ]
�
� |
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2
�
� |
WP 1B
� |
� |
2010-02-17 |
|
[ 312 ]
�
� |
ITU-R Study Group 4 Recommendation to be brought to the attention of Study Group 5
�
� |
BR Study Group Department
� |
� |
2010-02-09 |
|
[ 311 ]
�
� |
ITU-R Study Group 4 Question to be brought to the attention of Study Groups 5 and 7
�
� |
BR Study Group Department
� |
� |
2010-02-04 |
|
[ 310 ]
�
+Corr.1� |
Additional information for the preparation of the draft CPM Report to WRC-12
�
� |
Chairman, CPM-11
� |
� |
2010-01-22 |
|
[ 309 ]
�
� |
Reply liaison statement to ITU-R Working Party 5C on sharing between potential aeronautical mobile service applications and the fixed service in the band 37-38 GHz
�
� |
WP 5B
� |
� |
2009-12-15 |
|
[ 308 ]
�
� |
Liaison statement to Working Parties 5A and 5C - Compatibility studies between radiolocation and mobile and fixed services in the band 30-300 MHz (WRC-12 Agenda item 1.14)
�
� |
WP 5B
� |
� |
2009-12-11 |
|
[ 307 ]
�
� |
Liaison statement to Working Party 1A (copy to Working Parties 5A, 5B, 5C and 7D for information) - Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 6A
� |
� |
2009-12-08 |
|
[ 306 ]
�
� |
Liaison statement to Working Party 7B (copy to WP 5C for information) - Draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for digital electronic news gathering
�
� |
WP 6B
� |
� |
2009-12-08 |
|
[ 305 ]
�
� |
Liaison statement to Working Parties 5B, 5C and 6A - Working documents towards Reports related to amateur service operation in the WRC-12 Agenda item 1.23 for the proposed band of 415-526.5 kHz
�
� |
WP 5A
� |
� |
2009-12-07 |
|
[ 304 ]
�
� |
Liaison statement to Working Parties 5B, 5C and 6A - Working document towards draft CPM text for WRC-12 Agenda item 1.23
�
� |
WP 5A
� |
� |
2009-12-07 |
Results:603 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):