International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5B� C�

ITU-R�WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:813 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 563 ]
Proposals to PDNR ITU-R M.[UAS-BANDS-EXIST-ALLOC] - Results of compatibility studies between non-ICAO ARNS systems and unmanned aircraft systems in the 960-1 164 MHz band � Russian Federation 2010-10-28
[ 562 ]
Proposals to PDRN ITU-R M.[UAS-BANDS-NEW-ALLOC] - Results of compatibility studies between airborne radar (system-6) and unmanned aircraft control station of unmanned aircraft system in the 15.4-15.7 GHz � Russian Federation 2010-10-28
[ 561 ]
Studies of sharing feasibility of the MSS with RLS in the frequency band 10.5-10.6 GHZ and also of the MSS with RLS and ARNS in the frequency band 15.43-15.63 GHz � Russian Federation 2010-10-28
[ 560 ]
Results of compatibility studies between space surveillance radars and MMs safety systems � Russian Federation 2010-10-28
[ 559 ]
Using a special format MMSI in a handheld portable VHF radio with DSC and GNSS � Telenor ASA 2010-10-25
[ 558 ]
Proposed review of PDNR ITU-R M.[RLS 3-50 MHz SHARING] (copy to Working Party 5C for information) - The feasibility of sharing sub-bands between oceanographic radars and fixed and mobile services within the 3-50 MHz band � Canada 2010-10-25
[ 557 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3L, 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) � WP 7D 2010-10-15
[ 556 ]
Reply to liaison statement from Working Party 5B - Radar emission measurements in the out of band domain � WP 1C 230/1 2010-10-14
[ 555 ]
The study results of Joint Task Group 5-6 and the related work under Resolution 224 (Rev. WRC-07) � Chairman, SG 5 2010-10-05
[ 554 ]
Liaison statement to ITU-R Working Party 5B (copy to CIRM, IALA and IEC TC80) - Future revision of Recommendation ITU-R M.1371-4 � International Maritime Organization 2010-08-05
[ 553 ]
Liaison statement to ITU-R Working Party 5B - Guidance on the use of AIS Application-Specific Messages � International Maritime Organization 2010-08-05
[ 552 ]
PDNR M.[RLS_ARNS] � Ukraine 2010-07-28
[ 551 ]
PDNR M.[RLS_FSS] � Ukraine 2010-07-28
[ 550 ]
PDNR M.[RLS_RAS] � Ukraine 2010-07-28
[ 549 ]
Reply liaison statement to Working Party 5B - Compatibility studies between the radiodetermination-satellite service and the radiolocation service � WP 4C 2010-07-26
[ 548 ]
Reply liaison statement to WP 5B - Compatibility between 5 GHz radionavigation-satellite service systems and proposed aeronautical mobile (R) services systems in the band 5 000-5 010 MHz � WP 4C 288/4, 217-2/4 2010-07-26
[ 547 ]
Liaison statement to Working Party 5B - Potential interference between the ICAO standard microwave landing system (MLS) operating above 5 030 MHz and planned radionavigation-satellite service (RNSS) in the band 5 000-5 030 MHz � WP 4C 2010-07-26
[ 546 ]
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment � WP 1A 2010-07-22
[ 545 ]
Liaison statement to Working Party 5B - Finalizing the work on the revision of Annex 8 to Recommendation ITU-R SM.1541-2 � WP 1A 2010-07-21
[ 544 ]
Liaison statement to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5 and 15 for information and/or action if any) - Developments on PLT systems � WP 1A 2010-07-16
[ 543 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7B, 7C and 7D - Information on studies related to WRC-12 Agenda item 1.25 � WP 4C 2010-07-13
[ 542 ]
Liaison statement to ITU-R Working Party 5B - On studies between the space research service (space-to-earth) and the aeronautical mobile service in the 37-38 GHz band � WP 7B 2010-07-13
[ 541 ]
Liaison statement to the International Maritime Organization (IMO) for consideration at the sixth session of the Joint IMO/ITU Experts Group meeting and the eighty-eighth session of the Maritime Safety Committee (MSC 88) (Copy to Working Parties 1B and 5B for information) - Draft IMO position on WRC-12 Agenda items concerning matters relating to maritime services � WP 1A 2010-07-09
[ 540 ]
Additional guidelines for updating the Recommendations listed in Document 5B/465 (copied to Working Parties 5A, 5C and 5D for information) � Chairman, SG 5 2010-07-01
[ 539 ]
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07)) � WP 7C 2010-06-30
[ 538 ]
Liaison statement to the Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Further work on power line telecomunications � WP 7D 221-1/1 2010-06-17
[ 537 ]
Liaison statement to Working Party 5B on a PDNR on intelligent transport systems (ITS) guidelines and objectives � WP 5A 2010-06-09
[ 536 ]
Liaison statement to Working Party 7B on WRC-12 Agenda item 1.12 (copy to Working Party 5B) - Sharing between the aeronautical mobile and the fixed service in the band 37-38 GHz � WP 5C 2010-06-04
[ 535 ]
Reply liaison statement to ITU-R Working Party 5B on sharing between potential aeronautical mobile service applications and the fixed service in the band 37-38 GHz � WP 5C 2010-06-04
[ 534 ]
Review of the Study Group 5 Questions assigned to the Working Parties � Chairman, SG 5 2010-05-31
[ 533 ]
Draft IMO position on WRC-12 Agenda items concerning matters relating to maritime services � International Maritime Organization 2010-05-20
[ 532 ]
+Ann.1-33
Report of the fifth meeting of Working Party 5B (Geneva, 10-21 May 2010) � Chairman, WP 5B 2010-05-25
[ 531 ]
Final List of Participants - Working Party 5B (Geneva, 10-21 May 2010) � Director, BR 2010-05-21
[ 530 ]
Liaison statement to ITU-R Working Party 5B (copy to Working Party 5A) - Proposed response to Working Party 1A on PLT systems � WP 5C 2010-05-19
[ 529 ]
Liaison statement to Working Party 5B on a PDNR on intelligent transport systems (ITS) guidelines and objectives � WP 5A 2010-05-17
[ 528 ]
Liaison statement to ITU-R Working Party 5B (copy to Working Party 5C) - Proposed response to Working Party 1A on PLT systems � WP 5A 2010-05-17
[ 527 ]
List of documents issued � BR Study Group Department 2010-05-07
[ 526 ]
(Rev.1)
System characteristics and protection requirements of systems operating under allocations to services that are under the purview of Working Party 5B � Chairman, WP 5B 2010-05-06
[ 525 ]
Liaison note to ITU-R Working Party 5B on spectrum requirements for E-Navigation � International Association of Lighthouse Authorities (IALA) 2010-05-03
[ 524 ]
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 6, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications � WP 6A 2010-05-05
[ 523 ]
Recommendation ITU-R M.493-13 on digital selective calling system for use in the Maritime Mobile Service � United States of America 2010-04-30
[ 522 ]
Working document toward a draft new Report on near real time exchange of maritime domain information � United States of America 2010-04-30
[ 521 ]
Working document towards draft CPM text on WRC-12 Agenda item 1.9 � United States of America 2010-04-30
[ 520 ]
Working document toward a draft new Report - Future VHF maritime digital communications systems utilizing Recommendation ITU-R M.1842-1 � United States of America 2010-04-30
[ 519 ]
Working document towards draft CPM text on WRC-12 Agenda item 1.3 � United States of America 2010-04-30
[ 518 ]
Working document towards a draft new Report ITU-R M.[UAS AND GSO] - Characteristics and performance requirements for unamanned aircraft control links supported by GSO satellites operating between 10 GHz and 31 GHz � United States of America 2010-04-30
[ 517 ]
Working document towards a draft new Report - Oceanographic radar interference mitigation techniques - Technical and operational considerations � United States of America 2010-04-30
[ 516 ]
Reply liaison statement to ITU-R Working Party 5B - WRC-12 Agenda item 1.4 - Compatibility study between AM(R)S systems and digital sound broadcasting systems operating below 108 MHz � WP 6A 2010-05-04
[ 515 ]
Working document towards draft CPM text on WRC-12 Agenda item 1.21 � United States of America 2010-05-03
[ 514 ]
Proposed modifications to the draft CPM text on WRC-12 Agenda item 1.25 - WRC-12 Agenda items 1.3, 1.21 and 1.25 � Luxembourg 2010-05-03
Results:813 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2012-04-30