International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : TG1/8 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�TG1/8� C�

ITU-R�TG1/8

Compatibility between ultra-wideband devices (UWB) and radiocommunications services

Results:443 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 193 ]
Proposed changes to Chapter 7.10.6 of [Document 1-8/TEMP/68] on compatibility studies between UWB devices around 24 GHz and radicommunication services � Robert Bosch GmbH, Siemens AG 2004-10-26
[ 192 ]
Annex A.1.6 on RLAN in the preliminary draft new Report - Compatibility studies of systems using UWB technology with systems operating within radiocommunication services - Wireless access systems, including RLANs � Convenors of Annex 1.6 of TG 1/8 WG 2 2004-10-26
[ 191 ]
Summary of compatibility studies for WAS/RLAN � Convenors of Annex 1.6 of TG 1/8 WG 2 2004-10-26
[ 190 ]
Experimental data on IMT-DS and UWB compatibility � Infocomm Development Authority of Singapore (IDA) 227/1 2004-10-26
[ 189 ]
Experimental data on GSM/GPRS an UWB compatibility � Infocomm Development Authority of Singapore (IDA) 227/1 2004-10-26
[ 188 ]
Proposed text for � B1.7 of the working document towards a PDNR S.[UWB.CHAR] concerning UWB communication system capacity � Japan 2004-10-25
[ 187 ]
Proposed modification text for � B2.2 of he working document towards a PDNR SM.[UWB.CHAR] concerning UWB modulation schemes � Japan 2004-10-25
[ 186 ]
Proposed text for � 5.1.2 of the working document towards a PDN Report on compatibility studies of systems using UWB technology with systems operating within radiocommunication services concerning UWB mitigation techniques � Japan 2004-10-25
[ 185 ]
Proposed modification of � 6.1.1 of the working document towards a PDNR SM.[UWB.MES] concerning the radiated power measured by using a reverberation chamber � Japan 2004-10-25
[ 184 ]
Proposed modification of � 6.1.3.2.1 of the working document towards a PDNR SM.[UWB.MES] peak power measurement by using a spectrum analyser � Japan 2004-10-25
[ 183 ]
Proposed modification of � 6.1.3.4 of the working document towards a PDNR ITU-R SM.[UWB.MES] measurement initialization for RMS PSD � Japan 2004-10-25
[ 182 ]
Proposed modification of Section 6.1.7 of the working document towards a PDNR ITU-R SM.[UWB.MES] concerning compliance test � Japan 2004-10-25
[ 181 ]
Proposed modification of � 6.2.7.3 and � 6.2.7.4 of the working document towards a PDNR ITU-R SM.[UWB.MES] concerning signal processing and post-processing of waveform data � Japan 2004-10-25
[ 180 ]
(Rev.1)
Proposed modification for the Appendix of the working document towards a PDNR ITU-R SM.[UWB.MES] concerning PSD measurement uncertainty on conventional spectrum analyser � Japan 2004-10-25
[ 179 ]
Revision of FS/UWB Report: subsections 2.2 and 7, Appendices 1 and 2 (Bands around 24 GHz) of Annex 2 (Fixed service) � Convener - Fixed Service Annexes - WG-2 (DG 2-3) 2004-10-25
[ 178 ]
Convenor of Annex 7 (radio astronomy) of Working Group 2 - Annex 7 (radio astronomy) of the preliminary draft new Report on compatibility studies between UWB devices and radiocommunication services � Convenor of Annex 7 (radio astronomy) of WG 2 2004-10-22
[ 177 ]
Update of Annex 1.8 of working document toward a preliminary draft new Report on Compatibility studies between ultra-wideband technology within radiocommunication services and the amateur and amateur satellite services � International Amateur Radio Union (IARU) 2004-10-11
[ 176 ]
Proposed modifications to the Chairman's Report of the third international meeting of the Task Group, Annex 3, Document 1-8/162 - Working document towards a PDNR ITU-R SM.[UWB.FRAME] "Spectrum management framework for ultra-wideband" � North American Broadcasters Association 2004-10-11
[ 175 ]
Proposed modifications to the Report on UWB compatibility studies � Canada 2004-10-06
[ 174 ]
On the deletion of additional studies carried forward from the first meeting of Task Group 1/8 on UWB compatibility with IMT-2000 systems � Canada 2004-10-06
[ 173 ]
Liaison statement to Task Group 1/8 - Compatibility between ultra-wideband devices and Earth exploration-satellite service � WP 7C 2004-10-06
[ 172 ]
Joint liaison statement to Task Group 1/8 - Fixed wireless access systems deployment characteristics and protection requirements for indoor deployed terminal stations � WPs 9A and 9D 2004-10-05
[ 171 ]
Modifications to the text on UWB compatibility with the land mobile service in the Task Group 1/8 Report on compatibility studies � Canada 2004-10-05
[ 170 ]
Liaison statement to Task Group 1/8 - Protection criteria applicable to space research (including deep space) and space operation service systems for the use of Task Group 1/8 in their compatibility studies � WP 7B 2004-10-04
[ 169 ]
+Corr.1
Revision of working document toward a preliminary draft new Report on compatibility studies of systems using UWB technology with systems operating within the mobile-satellite service (MSS) including summary table and conclusions � Convenor of Annex 4.1 (MSS) of WG 2 2004-10-01
[ 168 ]
Liaison statement to Task Group 1/8 - Characteristics of meteorological radars � WP 8B 2004-09-30
[ 167 ]
Liaison statement to Task Group 1-8 - Noise figure and feeder losses characteristics of systems in the fixed service in 23 GHz and 26 GHz bands � WP 9D 2004-09-30
[ 166 ]
Liaison statement to Task Group 1/8 on ultra-wideband issues � WP 8D 2004-09-24
[ 165 ]
Reply Liaison statement to Task Group 1/8 - Compatibility studies of systems using ultra-wideband (UWB) technology with wireless access systems, including radio local area networks (RLANs) � WP 8A 2004-09-21
[ 164 ]
Liaison statement to TG 1/8 on compatibility studies between UWB devices and radiocommunication services � WP 8A 2004-09-17
[ 163 ]
Simulation of the noise threshold degradation caused by ultra-wideband transmitters in an indoor environment � Jordan (Hashemite Kingdom of) 2004-08-10
[ 162 ]
+Ann.1-5
Report on the third meeting of Task Group 1/8 (Boston, 9-18 June 2004) � Chairman, TG 1/8 2004-06-29
[ 161 ]
Final list of participants � Director, BR 2004-06-24
[ 160 ]
For information: Mitigation of interference by narrowband and wideband communication signals into ultra-wideband systems � Canada 2004-06-04
[ 159 ]
List of documents issued � BR Study Group Department 2004-06-03
[ 158 ]
Working document toward a preliminary draft new Recommendation ITU-R SM.[UWB.CHAR] - Characteristics of ultra-wideband devices � United States of America 2004-06-03
[ 157 ]
Working document towards the development of measurement procedures for assessing regulatory compliance of UWB emitters � United States of America 2004-06-03
[ 156 ]
Aggregation of interference � Motorola 2004-06-02
[ 155 ]
Proposal to replace Section 4 of Doc. 1-8/15 from the first meeting of Task Group 1/8 � United States of America 2004-06-02
[ 154 ]
Proposed modifications to Annex 5 to TG 1/8 Chairman's Report - Working document toward a preliminary draft new Report on Compatibility studies between UWB devices and radiocommunication services � Texas Instruments 2004-06-02
[ 153 ]
For information: Typical characteristics for C-band receive earth stations � United Kingdom of Great Britain and Northern Ireland 227/1 2004-06-02
[ 152 ]
FSS/Ultra-wideband compatibility - Aggregate interference studies in the space-to-Earth direction � United Kingdom of Great Britain and Northern Ireland 227/1 2004-06-02
[ 151 ]
Proposed text for section 5.1.6 of working document towards a PDNR SM.[UWB.MES] concerning measuring receiver between 30 MHz and 1 000 MHz � Japan 2004-06-02
[ 150 ]
Proposed text for section 5.1.2 of the working document towards a PDNR SM.[UWB.MES] concerning the test pattern for spectrum emission measurement � Japan 2004-06-02
[ 149 ]
Proposed modification for the Appendix of the working document towards a PDNR SM.[UWB.MES] concerning PSD measurement uncertainty of spectrum analysers � Japan 2004-06-02
[ 148 ]
Proposed text for � 6.2.7 of the working document towards a PDNR SM.[UWB.MES] concerning time domain measurement of electric-field waveform � Japan 2004-06-02
[ 147 ]
Proposed modification for � 5.1.8 of the working document towards a PDNR SM.[UWB.MES] concerning radiometric measurements for low level e.i.r.p. � Japan 2004-06-02
[ 146 ]
Proposed modification for � 5.1.8 of the working document towards a PDNR SM.[UWB.MES] concerning ultra-wideband impulse signal detection and processing issued of interest for measurement and monitoring UWB signals � Japan 2004-06-02
[ 145 ]
Proposed modification for � 1 Introduction of the working document towards a PDNR SM.[UWB.MES] concerning examples of ultra-wideband signals � Japan 2004-06-02
[ 144 ]
Proposed text for section A2.3.2 of the working document towards a PDNR SM.[UWB.CHAR] concerning UWB modulation schemes � Japan 2004-06-02
Results:443 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2005-06-06