Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 60 ]
�
(Rev.1-3)� |
Comments on CCCV mode in G.8121.2
�
� |
FiberHome Technologies Group
� |
Q10/15
� |
2013-06-13 |
|
[ 59 ]
�
� |
G.8263 Wander Generation
�
� |
Integrated Device Technology (IDT)
� |
Q13/15
� |
2013-06-13 |
|
[ 58 ]
�
(Rev.1-3)� |
Comments on Ring Protection Function in G.8052
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2013-06-13 |
|
[ 57 ]
�
� |
Security in Optical Transport Networks
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q11/15
� |
2013-06-13 |
|
[ 56 ]
�
� |
Getting a 'point to point modem proof' PON ranging process
�
� |
Orange
� |
Q2/15
� |
2013-06-13 |
|
[ 55 ]
�
� |
PON-Id fuelled power saving capabilities
�
� |
Orange
� |
Q2/15
� |
2013-06-13 |
|
[ 54 ]
�
� |
Detection of point to point modems on a PON
�
� |
Orange
� |
Q2/15
� |
2013-06-13 |
|
[ 53 ]
�
� |
Necessity to Support External Commands in ODU SMP Protocol
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2013-06-13 |
|
[ 52 ]
�
� |
MPLS-TP shared ring protection(MSRP) implementation and test result
�
� |
China Mobile Communications Corporation
� |
Q9/15
� |
2013-06-13 |
|
[ 51 ]
�
� |
PWE3 Dual-Homing Protection Requirements
�
� |
China Mobile Communications Corporation
� |
Q9/15
� |
2013-06-13 |
|
[ 50 ]
�
� |
Proposal for PTP clockclasses
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2013-06-13 |
|
[ 49 ]
�
� |
Proposal for HRM hops and BC constant time error
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2013-06-13 |
|
[ 48 ]
�
(Rev.1)� |
Proposal to reserve Priority 1 in BMCA
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2013-06-13 |
|
[ 47 ]
�
(Rev.1)� |
ODU SMP with centralized control plane
�
� |
China Mobile Communications Corporation
� |
Q9/15
� |
2013-06-13 |
|
[ 46 ]
�
(Rev.1)� |
Proposal for different correlation structures for SDN-based transport network controller and path computation element (PCE)
�
� |
China Unicom
� |
Q12/15
� |
2013-06-13 |
|
[ 45 ]
�
� |
Optical transceiver performance for the new CWDM applications with multi sub-channel interface
�
� |
Ericsson-LG
,
SK Telecom
� |
Q6/15
� |
2013-06-13 |
|
[ 44 ]
�
(Rev.1)� |
Proposal for revision of recommendation ITU-T L.60
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2013-06-13 |
|
[ 43 ]
�
� |
Consideration for Interworking between Ethernet Linear Protection in G.MDSP
�
� |
China Unicom
� |
Q9/15
� |
2013-06-13 |
|
[ 42 ]
�
(Rev.1)� |
Proposal to add related description of PMDQ in ITU-T Recommendation G.650.2(2007)
�
� |
FiberHome Technologies Group
,
Ministry of Information and Industry of China
� |
Q5/15
� |
2013-06-13 |
|
[ 41 ]
�
� |
Definition of serial data interface comunication ME in G.988
�
� |
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q2/15
� |
2013-06-13 |
|
[ 40 ]
�
� |
Comments and modifications to ODN reference architecture in G.multi
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 39 ]
�
� |
FEC NCG in G.Sup39
�
� |
ZTE Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2013-06-13 |
|
[ 38 ]
�
� |
The improvement of 8B10B line coding of CPRI in G.989.2 Annex A
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 37 ]
�
� |
The requirement of CPRI signal transmission over P2P WDM system in G.989.2 Annex A
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 36 ]
�
� |
Proposal for ONU Activation in dual rate NGPON2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 35 ]
�
� |
Proposal for dual-rate implementation on NGPON2 PMD
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 34 ]
�
� |
Proposal for administrate channel amendment for dual rate NGPON2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 33 ]
�
� |
Amendment for bandwidth map in dual rate NGPON2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 32 ]
�
� |
Considerations about requirement of beyond 100G in G.sup39
�
� |
ZTE Corporation
� |
Q6/15
� |
2013-06-13 |
|
[ 31 ]
�
� |
Boundary conditions for metro applications in G.698.2
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q6/15
� |
2013-06-12 |
|
[ 30 ]
�
� |
Improvements of G.672
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q7/15
� |
2013-06-12 |
|
[ 29 ]
�
� |
BT proposed revisions to ITU-T G.652 Recommendation
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q5/15
� |
2013-06-12 |
|
[ 28 ]
�
(Rev.1)� |
Spectral excursion measurements for 100Gb/s DP-QPSK signals
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2013-06-06 |
|
[ 27 ]
�
� |
B100G - Power Saving
�
� |
Telefon AB - LM Ericsson
� |
Q6/15, Q11/15
� |
2013-06-05 |
|
[ 26 ]
�
� |
Including Non-Orthogonal SCM in G.Sup.39
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2013-06-04 |
|
[ 25 ]
�
� |
Participation of African consumers in ITU's standardization work
�
� |
R�CATIC
� |
BSG/15
� |
2013-06-04 |
|
[ 24 ]
�
� |
G.8275.1: Proposed Updates to the Alternate BMCA
�
� |
Juniper Networks
� |
Q13/15
� |
2013-06-04 |
|
[ 23 ]
�
� |
B100G multiplexing hierarchy
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-03 |
|
[ 22 ]
�
� |
B100G FEC consideration
�
� |
ZTE Corporation
� |
Q6/15, Q11/15
� |
2013-06-03 |
|
[ 21 ]
�
� |
B100G bit rate option
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-03 |
|
[ 20 ]
�
� |
B100G multiplexing consideration
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-03 |
|
[ 19 ]
�
� |
B100G minimum OCh rate
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q6/15, Q11/15
� |
2013-06-03 |
|
[ 18 ]
�
� |
Text Changes in G.8021 for At Risk signalling
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q14/15, Q10/15
� |
2013-05-31 |
|
[ 17 ]
�
� |
Text changes in Y.1731 for At Risk signalling
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-31 |
|
[ 16 ]
�
� |
"At Risk" signalling in Y.1731 Ethernet OAM
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q14/15, Q10/15
� |
2013-05-31 |
|
[ 15 ]
�
(Rev.1)� |
Some considerations for modelling Sub-lambda photonic switched networks (SLPSN)
�
� |
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
� |
Q12/15
� |
2013-05-31 |
|
[ 14 ]
�
� |
LCK/AIS Reception Process in G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 13 ]
�
� |
Modelling of OTN Delay Measurement
�
� |
Alcatel-Lucent USA Inc.
,
Deutsche Telekom AG
� |
Q14/15
� |
2013-05-29 |
|
[ 12 ]
�
� |
Clarification regarding Dataplane Loopback in G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 11 ]
�
� |
Clarification regarding Dataplane Loopback in G.8121
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):