International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 290 ]
Comparison between shared-link and sub-ring models (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 289 ]
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission � ZTE Corporation Q6/15 2008-11-23
[ 288 ]
Proposals on optical attenuator parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 287 ]
Proposal on PDL and PMD parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 286 ]
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713 � ZTE Corporation Q14/15 2008-11-23
[ 285 ]
Comments to G.8152 � ZTE Corporation Q14/15 2008-11-23
[ 284 ]
Comments to G.8052 � ZTE Corporation Q14/15 2008-11-23
[ 283 ]
Add "central frequency deviation" parameter for transmitter in G.698.2 � ZTE Q6/15 2008-11-23
[ 282 ]
G.lt: Time-varying interference measurement and characterisation � BT Q4/15 2008-11-23
[ 281 ]
G.hn: Proposal for maximum wideband transmit power � Infineon Technologies AG Q4/15 2008-11-23
[ 280 ]
G.hn: Proposal for text describing G.hn threat model � Infineon Technologies AG Q4/15 2008-11-23
[ 279 ]
G.8032 protection switching transient traffic performance requirement for next study period � ETRI (Republic of Korea) Q9/15 2008-11-23
[ 278 ]
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection � ETRI (Korea, Republic of) Q9/15 2008-11-23
[ 277 ]
Creation of a new TLV in ESMC channel in order to transport frequency stability level information � France T�l�com, Tellabs Q13/15 2008-11-23
[ 276 ]
Proposed text for drafting of PTPv2 telecom profile frequency-oriented � France T�l�com, Tellabs Q13/15 2008-11-23
[ 275 ]
Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented � France T�l�com, Tellabs Q13/15 2008-11-23
[ 274 ]
Standards for 112 Gbit/s serial transmission � Telecom Italia Q6/15 2008-11-23
[ 273 ]
Study items for Q6/15 � Italy Q6/15 2008-11-23
[ 272 ]
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T � Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital Q9/15, Q3/15, Q11/15 2008-11-23
[ 271 ]
Restoration exercise � ZTE Corporation Q14/15, Q12/15 2008-11-23
[ 270 ]
Document withdrawn (See C89) � Italy Q6/15 2008-11-23
[ 269 ]
G.hn: Profiles � CopperGate Communications Q4/15 2008-11-21
[ 268 ]
G.hn: Proposal for fixed window setting � Infineon Technologies AG Q4/15 2008-11-21
[ 267 ]
G.hn: Proposal to associate EVM values with the transmit power levels � Infineon Technologies AG, DS2 Q4/15 2008-11-21
[ 266 ]
Withdrawn � N/A � 1753-01-01
[ 265 ]
G.vector: Proposal for a frequency division multiplexing scheme for pilot sequences and sync-flags � Alcatel-Lucent Bell N.V. Q4/15 2008-11-21
[ 264 ]
G.lt: Update to SELT-P draft text � Alcatel-Lucent Bell N.V. Q4/15 2008-11-21
[ 263 ]
Ghn: PLC Passband OFDM Parameters Proposal � Gigle Semiconductor Q4/15 2008-11-21
[ 262 ]
G.INP: Further Details on Error Monitoring, OAM and Traffic Differentiation with the Unified Retransmission Method � Infineon Technologies AG Q4/15 2008-11-21
[ 261 ]
G.hn: Proposal to use a single indexing rule � Infineon Technologies AG Q4/15 2008-11-21
[ 260 ]
Proposal to specify Failure of Protocol defects for the R-APS protocol � Lucent Technologies, Inc - AimValley BV Q9/15 2008-11-21
[ 259 ]
G.hn: Proposal for a multi-mode FEC scheme � France Telecom, Spidcom Technologies, Gigle Semico Q4/15 2008-11-21
[ 258 ]
G.inp: Limitations of the PMS-TC Retransmisssion Scheme � Infineon Technologies AG Q4/15 2008-11-21
[ 257 ]
Proposed change in Draft Annex to G.709 for transcoding via 512B/513B � NTT Q11/15 2008-11-21
[ 256 ]
Notification of IPR statement submission � DS2 Q4/15 2008-11-21
[ 255 ]
G.lt: Communications Channel Extension for Measurement Data Retrieval � BT Q4/15 2008-11-21
[ 254 ]
Solution of fast GPON switching in long-reach PON scenario � Huawei technologies Q2/15 2008-11-21
[ 253 ]
Proposal to support phase synchronization in GPON system � Huawei technologies Co., LTD Q2/15 2008-11-21
[ 252 ]
Proposal to support ONT survival time attribute in G.984.4 � Huawei technologies Co., LTD Q2/15 2008-11-21
[ 251 ]
Proposal on Continuous Mode of LR-PON � Huawei Technologies Co., Ltd. RAD Data communicati Q2/15 2008-11-21
[ 250 ]
Proposed text for ODU3ye/OTU3ye in supplement � Japan Q11/15 2008-11-21
[ 249 ]
Corrigendum for G.709 correcting small mistake and inconsistency with G.798 � Alcatel Lucent Germany Q9/15, Q11/15 2008-11-21
[ 248 ]
Ghn: EVM Requirements Proposal � Gigle Semiconductor Q4/15 2008-11-21
[ 247 ]
Proposal to include additional PMD-related parameters in the 40G and 100G modulation format comparison documents � Deutsche Telekom Q7/15, Q6/15 2008-11-21
[ 246 ]
G.lt: Proposal for modifications to the "Loop Topology with cable-type identification" table in SELT � Ericsson AB Q4/15 2008-11-21
[ 245 ]
Consideration of OTU4 FEC requirements � Alcatel Lucent Q11/15 2008-11-21
[ 244 ]
Proposal for adding timing transparency to GFP (G.7041) mapping and its variant as given in G.Sup43 Clause 7.3 for 10GBase-R � Alcatel - Lucent Germany Q11/15 2008-11-21
[ 243 ]
Considerations about Implementation friendly justification procressing of mapping of data into ODU4 � Alcatel - Lucent Germany Q11/15 2008-11-21
[ 242 ]
G.hn: Compression formats for the Ack message � DS2 Q4/15 2008-11-21
[ 241 ]
G.hn: Re-synchronization in STXOPs with CFTS � DS2 Q4/15 2008-11-21
Results:2390 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2021-01-29