Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 645 ]
�
(Rev.1)� |
Report of the Q19/5 Rapporteur meeting between Q19/5 and ETSI EE2 (8-12 June 2015)
�
� |
Orange
� |
Q19/5
� |
2015-09-29 |
|
[ 644 ]
�
� |
Discussion on methodologies to assess the impact of ICT on water
�
� |
Orange
� |
Q18/5
� |
2015-09-29 |
|
[ 643 ]
�
(Rev.1)� |
Q19/5 rapporteurLastest L.renewable draft from joint Q19/5 and ETSI EE/EE2 work
�
� |
Orange
� |
Q19/5
� |
2015-09-29 |
|
[ 642 ]
�
(Rev.1)� |
latest draft L.DCmarking
�
� |
Orange
� |
Q19/5
� |
2015-09-29 |
|
[ 641 ]
�
(Rev.1)� |
NWI proposal for New alternative energy storage evaluatation TR or handbook
�
� |
Orange
� |
Q19/5
� |
2015-09-29 |
|
[ 640 ]
�
(Rev.1)� |
Proposal for Recommendations Standardization terms and trends in energy efficiency
�
� |
Cisco Systems, Inc.
� |
Q17/5
� |
2015-09-29 |
|
[ 639 ]
�
(Rev.1)� |
The draft of K.secmiti "Mitigation methods against electromagnetic security threats"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q10/5
� |
2015-09-29 |
|
[ 638 ]
�
� |
Supplement on Hybrid Satellite-based Communications Systems
�
� |
Climate Associates Ltd.
� |
Q15/5, Q14/5
� |
2015-09-29 |
|
[ 637 ]
�
� |
Introduction on using High technology in Agriculture
�
� |
MCIT, Egypt
� |
Q15/5
� |
2015-09-29 |
|
[ 636 ]
�
� |
Draft K.hvps2: Method for determining the impedance to earth of earthing systems
�
� |
Budapest University of Technology and Economics
� |
Q3/5
� |
2015-09-29 |
|
[ 635 ]
�
� |
Suggestion for a new work item on Extended Producers' Responsibility for Sustainable E-waste management
�
� |
MCIT, Egypt
� |
Q13/5
� |
2015-09-29 |
|
[ 634 ]
�
� |
Updated version of Draft Recommendation ITU-T L. Infrastructure
�
� |
MCIT, Egypt
,
Climate Associates Ltd.
,
Communications Authority of Kenya (CA)
,
Malaysia
,
Tanzania
,
Telecom Italia S.p.A.
� |
Q15/5
� |
2015-09-30 |
|
[ 633 ]
�
(Rev.1-2)� |
Comments on L.ene ICT serv
�
� |
Telefon AB - LM Ericsson
� |
Q18/5, Q17/5
� |
2015-09-29 |
|
[ 632 ]
�
(Rev.1)� |
Enablement effects of ICT in a 2030 perspective - findings for studies on positive effects of ICT
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2015-09-29 |
|
[ 631 ]
�
� |
Proposal how to inform about the minimum health and safety requirements regarding the
exposure of workers to the risks arising from electromagnetic fields (Directive 2013/35/EU)
�
� |
Narda Safety Test Solutions GmbH
� |
Q7/5
� |
2015-09-29 |
|
[ 630 ]
�
(Rev.1)� |
Best practices in using ICTs for adaptation in the agriculture sector
�
� |
India, MCIT, Dept. of Telecommunications
� |
Q15/5
� |
2015-09-29 |
|
[ 629 ]
�
(Rev.1)� |
Setting up a low-cost sustainable telecommunication infrastructure for rural communications in developing countries
�
� |
India, MCIT, Dept. of Telecommunications
� |
Q14/5
� |
2015-09-29 |
|
[ 628 ]
�
� |
Proposal of a new work item on Key performance indicators related to the sustainability impacts of information and communication technology in smart sustainable cities
�
� |
FiberHome Technologies Group
,
Telecom Italia S.p.A.
� |
Q20/5
� |
2015-09-29 |
|
[ 627 ]
�
� |
Proposal of a new work item on Key performance indicators related to the use of information and communication technology in smart sustainable cities
�
� |
FiberHome Technologies Group
,
Telecom Italia S.p.A.
� |
Q20/5
� |
2015-09-29 |
|
[ 626 ]
�
� |
Input to Q18 regarding standardization activities related to positive impacts
�
� |
Fujitsu Limited
� |
Q18/5
� |
2015-09-29 |
|
[ 625 ]
�
(Rev.1)� |
Q18 ID002 at rapporteurs meeting in Sophia Antipolice
�
� |
Fujitsu Limited
� |
Q18/5
� |
2015-09-29 |
|
[ 624 ]
�
(Rev.1)� |
Proposal to the draft Recommendation ITU-T L.ICT and adaptation of agriculture
�
� |
Fujitsu Limited
� |
Q15/5
� |
2015-09-29 |
|
[ 623 ]
�
(Rev.1)� |
Q15 ID003 with members 'comments at rapporteurs meeting in Sophia Antipolice
�
� |
Fujitsu Limited
� |
Q15/5
� |
2015-09-29 |
|
[ 622 ]
�
� |
Proposal for new WI on Energy Efficiency in NFV network
�
� |
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT
� |
Q17/5
� |
2015-09-29 |
|
[ 621 ]
�
(Rev.1)� |
Citizen Field Engineer: Crowdsources Maintenance of Connected Water Infrastructure - lessons learned
�
� |
Telefon AB - LM Ericsson
� |
Q20/5
� |
2015-09-29 |
|
[ 620 ]
�
(Rev.1-2)� |
The rationale of decision for the new Recommendation "Immunity requirements for telecommunication equipment in close proximity (K.prox)"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5
� |
2015-09-29 |
|
[ 619 ]
�
(Rev.1-2)� |
The 1st draft of K.prox "Immunity requirements for telecommunication equipment in close proximity"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5
� |
2015-09-29 |
|
[ 618 ]
�
(Rev.1-3)� |
Draft of Recommendation K.e_faci : EMC requirements for electrical systems in telecommunication facilities
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5
� |
2015-09-29 |
|
[ 617 ]
�
(Rev.1-2)� |
A proposal to create a new Recommendation for EMC requirements of disturbances from lighting equipment located in the telecommunication equipment room
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5
� |
2015-09-29 |
|
[ 616 ]
�
� |
Contribution to the work item on Information and communication technologies for climate change adaptation in cities
�
� |
Egypt
,
FiberHome Technologies Group
,
Telecom Italia S.p.A.
� |
Q15/5
� |
2015-09-29 |
|
[ 615 ]
�
� |
The draft of Recommendation ITU-T K.tot
�
� |
Huawei Technologies Co., Ltd.
� |
Q5/5
� |
2015-09-29 |
|
[ 614 ]
�
� |
CFSI Concerns with C-0438 'Proposal for Initial Draft of "Implementing guidance for ICT supply chains" due diligence on conflict minerals
�
� |
BlackBerry Limited
,
Motorola Mobility LLC
� |
Q13/5
� |
2015-09-29 |
|
[ 613 ]
�
(Rev.1)� |
Proposal for addition of an assessment case study of Energy Effective Data Center to ITU-T L.1410 - Case studies (resubmission)
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q18/5
� |
2015-09-29 |
|
[ 612 ]
�
� |
Suggestion about the relationship of electromagnetic interference and DSL for K.int
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q3/5
� |
2015-09-29 |
|
[ 611 ]
�
+Corr.1 (Rev.1-2)� |
Proposed study on safety of terminal equipment such as bridging by SPDs between the primary and external circuit
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5
� |
2015-09-29 |
|
[ 610 ]
�
+Corr.1 (Rev.1-2)� |
Proposed revisions for common mode lightning surge test on Ethernet port in K.44/20/21/45
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5
� |
2015-09-29 |
|
[ 609 ]
�
+Corr.1 (Rev.1-2)� |
Proposed revisions for differential mode lightning surge test on Ethernet port in K.20/21/45
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5
� |
2015-09-29 |
|
[ 608 ]
�
� |
Comments on second draft of K.env
�
� |
GSM Association
� |
Q7/5
� |
2015-09-29 |
|
[ 607 ]
�
(Rev.1)� |
Proposal to amend Summary and Introduction of draft K.maps
�
� |
GSM Association
� |
Q7/5
� |
2015-09-29 |
|
[ 606 ]
�
� |
Proposal on energy efficiency measurement methodologies of data centre/telecom centre level and system level in L. DC_assessment
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q17/5
� |
2015-09-29 |
|
[ 605 ]
�
� |
Proposal on AC and DC power feeding system solution in L.architecture
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q19/5
� |
2015-09-29 |
|
[ 604 ]
�
� |
Proposal of a new work item on Smart water management in cities
�
� |
FiberHome Technologies Group
,
Telecom Italia S.p.A.
� |
Q15/5
� |
2015-09-28 |
|
[ 603 ]
�
� |
Draft new Recommendation ITU-T K.maps (for Consent) - (pre-edited by TSB Editing Team)
�
� |
Universidad Nacional de San Luis
� |
Q7/5
� |
2015-09-28 |
|
[ 602 ]
�
� |
Proposal of a new work item on Electromagnetic field (EMF) considerations in smart sustainable cities
�
� |
ORANGE POLSKA S.A.
,
Telecom Italia S.p.A.
� |
Q7/5
� |
2015-09-28 |
|
[ 601 ]
�
� |
Proposal on ITU-T L.RBS_assesment
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2015-09-28 |
|
[ 600 ]
�
(Rev.1)� |
Third draft Recommendation of k-BTS-EMC Recommendation
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/5
� |
2015-09-28 |
|
[ 599 ]
�
� |
Proposal modification to L.1002
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/5
� |
2015-09-28 |
|
[ 598 ]
�
� |
First draft revision of K.59
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/5
� |
2015-09-28 |
|
[ 597 ]
�
� |
The third draft Recommendation ITU-T L.RBS_assesment
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2015-09-28 |
|
[ 596 ]
�
� |
Proposal of a new work item on "Danger effects and protective measurement against electromagnetic disturbances when internet data centre being co-sited with high-voltage substation"
�
� |
Huawei Technologies Co., Ltd.
� |
Q5/5, Q3/5
� |
2015-09-28 |
Resultats:845 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):