Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2011-12-05�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� C�(2011-12-05)�

UIT-T�SG15

Transport network structures

P�riode d'�tudes 2009

R�union� du 2011-12-05 au 2011-12-16

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-09-102012-05-112011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultats:420 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 1738 ]
(Rev.1)
On-grid frequencies up & down proposal in Decision 2 of Decision Tree � Gemfire Europe Limited , Huawei Technologies Co. Ltd. Q6/15 2011-11-22
[ 1737 ]
(Rev.1)
Gigabit-capable Passive Optical Networks (G PON): Reach Extension; Contribution to Amendment 2: Raman amplified G-PON extender � British Telecommunications Public Ltd. Co. (BT Plc) , OFS Fitel, LLC Q2/15 2011-11-21
[ 1736 ]
(Rev.1)
USA on Continued Work to Progress a Solution on G.8113.1 � United States Q10/15 2011-11-21
[ 1735 ]
(Rev.1)
Internet Engineering Steering Group (IESG) Liaison Statement: Email Correspondence Between IETF Chair and TSB Director � Internet Society 2011-11-21
[ 1734 ]
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN � Huawei Technologies Co. Ltd. Q13/15 2011-11-21
[ 1733 ]
Rise time requirements of RS422 1PPS_OUT signal � Huawei Technologies Co. Ltd. Q13/15 2011-11-21
[ 1732 ]
(Rev.1)
Policy principles for cooperative standards development � Internet Society 2011-11-21
[ 1731 ]
Jitter/Wander Testing Related to Transport of PTPv2 Messages over OTN � Huawei Technologies Co. Ltd. 2011-11-21
[ 1730 ]
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input � France T�l�com Orange , France T�l�com Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc. Q13/15 2011-11-21
[ 1729 ]
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks � France T�l�com Orange , France T�l�com Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc. Q13/15 2011-11-21
[ 1728 ]
Detection and removal of Delay Jumps using FWPR and minMATIE � Huawei Technologies Co. Ltd. Q13/15 2011-11-21
[ 1727 ]
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands � Huawei Technologies Co. Ltd. Q13/15, Q11/15 2011-11-21
[ 1726 ]
Criterion for Minimum Detectable Floor Delay Step using minMATIE � Huawei Technologies Co. Ltd. Q13/15 2011-11-21
[ 1725 ]
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements � France T�l�com Orange , France T�l�com Orange , Huawei Technologies Co. , Iometrix, Inc. Q13/15 2011-11-21
[ 1724 ]
(Rev.1)
Comments on TD 527 � Cisco Systems, Inc. , France T�l�com Orange , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG QALL/15, Q10/15, Q1/15 2011-11-21
[ 1723 ]
(Rev.1)
Request for evaluation of OTN support for CPRI � AT&T, Inc. Q13/15 2011-11-21
[ 1722 ]
(Rev.1)
G.798 PT Interworking Smart? � AT&T, Inc. Q9/15 2011-11-21
[ 1721 ]
Request for clarification on the February closing Plenary of ITU-T SG 15 � Germany QALL/15 2011-11-21
[ 1720 ]
Germany's observations regarding IETF RFCs in the ITU-T � Germany QALL/15 2011-11-21
[ 1719 ]
Maintaining the functional model of the OTN in G.872 � Germany Q12/15 2011-11-21
[ 1718 ]
(Rev.1)
Comments on the draft text of revised L.64 � Nippon Telegraph and Telephone Corporation (NTT) Q17/15 2011-11-21
[ 1717 ]
(Rev.1)
Progressing MPLS-TP OAM, Equipment, and Management Recommendations � Alcatel-Lucent USA Inc. Q9/15, Q12/15, Q10/15 2011-11-21
[ 1716 ]
(Rev.1)
SMP Protocol Functionality � Nokia Siemens Networks GmbH & Co. KG Q9/15 2011-11-21
[ 1715 ]
(Rev.1)
Proposed study plan of Question 17/15 for next study period � Nippon Telegraph and Telephone Corporation (NTT) Q17/15 2011-11-21
[ 1714 ]
(Rev.1)
Development of G.SMP � Nokia Siemens Networks GmbH & Co. KG Q9/15 2011-11-21
[ 1713 ]
Withdrawn - Duplicate of C-1709 �
Withdrawn
Cisco Systems, Inc. , Juniper Networks , Verizon Communication Corporation 2011-11-21
[ 1712 ]
(Rev.1)
G.8131 Single Document � Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation Q9/15 2011-11-21
[ 1711 ]
(Rev.1)
G.8113.2 comments � Cisco Systems, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation QALL/15, Q10/15 2011-11-21
[ 1710 ]
(Rev.1)
Proposed changes to G.8113.1 � Cisco Systems, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation Q10/15 2011-11-21
[ 1709 ]
(Rev.1)
Updated text for G.8131/Y.1382 � Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation Q9/15 2011-11-21
[ 1708 ]
(Rev.1)
Security with Timing as a Managed Service � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1707 ]
(Rev.1)
Considerations on Packet Rate for the PEC-S-F � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1706 ]
(Rev.1)
Lack of consensus on G.8113.1 � Cisco Systems, Inc. , France T�l�com Orange , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation QALL/15, Q10/15, Q1/15 2011-11-21
[ 1705 ]
Enhanced delay measurement for OTN � Korea (Rep. of) Q11/15 2011-11-21
[ 1704 ]
Considerations for G.8031 corrigendum � Korea (Rep. of) Q9/15 2011-11-21
[ 1703 ]
(Rev.1)
PEC-S-F Output Timing Signals � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1702 ]
(Rev.1)
Noise Tolerance for the Packet Slave Clock (PEC-S-F) � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1701 ]
Synchronization Requirement in OTN � China Mobile Communications Corporation Q13/15, Q11/15 2011-11-21
[ 1700 ]
(Rev.1)
Noise Generation for the Packet Slave Clock (PEC-S-F) � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1699 ]
The OAM structure and functions requirements for Packet-based synchronization network � China Mobile Communications Corporation Q13/15 2011-11-21
[ 1698 ]
(Rev.1)
Propose to consent G.8113.1 OAM for large scale application in China Mobile � China Mobile Communications Corporation Q10/15 2011-11-21
[ 1697 ]
(Rev.1)
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc. , France T�l�com Orange , Telecom Italia S.p.A. Q4/15 2011-11-21
[ 1696 ]
(Rev.1)
Testing of Packet Slave Clocks � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1695 ]
(Rev.1)
Measuring PRTC Accuracy � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1694 ]
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results �
Withdrawn
China , China Mobile Communications Corporation Q9/15, Q14/15, Q12/15, Q10/15 2011-11-21
[ 1693 ]
(Rev.1)
Cesium Clock Wander Contribution to Grandmaster Clock Characterization � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1692 ]
(Rev.1)
Inconsistencies in G.829 following corrigendum 2007 � Nokia Siemens Networks GmbH & Co. KG Q9/15 2011-11-21
[ 1691 ]
(Rev.1-2)
Testing Packet Slave Clocks using Flicker Noise � SymmetriCom, Inc. Q13/15 2011-11-21
[ 1690 ]
(Rev.1)
Proposal to study the convergence of PON and transport network in the next study period � ZTE Corporation Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-11-21
[ 1689 ]
(Rev.1)
Proposal to study the convergence of optical and packet in the next study period � ZTE Corporation Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-11-21
Resultats:420 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-25