Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 899 ]
�
� |
Updated Telecom Slave Model
�
� |
Huawei
,
France T�l�com
� |
Q13/15
� |
2010-05-18 |
|
[ 898 ]
�
� |
Flag Fields
�
� |
Huawei
� |
Q13/15
� |
2010-05-18 |
|
[ 897 ]
�
� |
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks
�
� |
Huawei
,
China Mobile Communications Corporation
� |
Q13/15
� |
2010-05-18 |
|
[ 896 ]
�
� |
The use of SyncE and IEEE1588v2 for Time Distribution
�
� |
Huawei
,
China Mobile Communications Corporation
� |
Q13/15
� |
2010-05-18 |
|
[ 895 ]
�
� |
ESMC Transport over GPON
�
� |
Huawei
,
BT
� |
Q2/15, Q13/15
� |
2010-05-18 |
|
[ 894 ]
�
� |
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context
�
� |
Huawei
,
France T�l�com
� |
Q13/15
� |
2010-05-18 |
|
[ 893 ]
�
� |
Usage of PTP domain number for the time-profile
�
� |
Huawei
� |
Q13/15
� |
2010-05-18 |
|
[ 892 ]
�
� |
Proposed text modifications to the delay measurement process in G.8021
�
� |
NEC Corporation
� |
Q9/15
� |
2010-05-18 |
|
[ 891 ]
�
� |
Proposed text for ETH group functions in G.8021
�
� |
NEC Corporation
� |
Q9/15
� |
2010-05-18 |
|
[ 890 ]
�
� |
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731
�
� |
NEC Corporation
� |
Q9/15, Q14/15, Q10/15
� |
2010-05-18 |
|
[ 889 ]
�
� |
Consideration of the enhancement of performance monitoring in G.8021/Y.1731
�
� |
NEC Corporation
� |
Q9/15, Q14/15, Q10/15
� |
2010-05-18 |
|
[ 888 ]
�
� |
Proposal for OMCI transport in Ethernet PON
�
� |
Mitsubishi
,
Ericsson
,
HItachi
,
NTT
� |
Q2/15
� |
2010-05-18 |
|
[ 887 ]
�
� |
Black-hole problem due to address mis-learning in G.8032
�
� |
Korea (Republic of)
� |
Q9/15
� |
2010-05-18 |
|
[ 886 ]
�
� |
Proposal to modify failure of protocol conditions in G.8031 and G.873.1
�
� |
Korea (Republic of)
� |
Q9/15
� |
2010-05-18 |
|
[ 885 ]
�
� |
MS-W (Manual Switch to Working) in revertive operation in G.8031
�
� |
Korea (Republic of)
� |
Q9/15
� |
2010-05-18 |
|
[ 884 ]
�
� |
Proposal to comprehensively classify modulation/demodulation and multiplex/demultiplex schemes used in optical transmission systems
�
� |
NTT
� |
Q6/15
� |
2010-05-18 |
|
[ 883 ]
�
� |
Applications of G.9960, G.9961 Transceivers for Smart Grid applications: Advanced Metering infrastructure, Energy Management in the home, and Electric Vehicles
�
� |
Lantiq Beteiligungs
,
DS2
� |
Q4/15
� |
2010-05-18 |
|
[ 882 ]
�
� |
Consideration of jitter performance measurement method for XG-PON optical interfaces
�
� |
CIAJ
� |
Q2/15, Q15/15
� |
2010-05-18 |
|
[ 881 ]
�
� |
Proposal for definition of COTDR
�
� |
CIAJ
� |
Q8/15, Q15/15
� |
2010-05-18 |
|
[ 880 ]
�
� |
Proposal for correction of table1 parameters in O.174
�
� |
CIAJ
� |
Q15/15
� |
2010-05-18 |
|
[ 879 ]
�
� |
Proposal for addition of jitter test parameters and text in O.174
�
� |
CIAJ
� |
Q15/15
� |
2010-05-18 |
|
[ 878 ]
�
� |
Proposal for Title, Summary and Scope of O.xgponjitter
�
� |
CIAJ
� |
Q2/15, Q15/15
� |
2010-05-18 |
|
[ 877 ]
�
� |
Comments on the protocol specifications in Y.1731
�
� |
NEC Corporation
� |
Q10/15
� |
2010-05-18 |
|
[ 876 ]
�
� |
Issues with the Transparent Clock concept of PTPv2 in a telecom environment
�
� |
France T�l�com
� |
Q4/15, Q2/15, Q13/15
� |
2010-05-18 |
|
[ 875 ]
�
� |
Architecture for phase and time distribution
�
� |
France T�l�com
� |
Q4/15, Q2/15, Q13/15
� |
2010-05-18 |
|
[ 874 ]
�
� |
G.hn: 802.1Qat support in G.hn
�
� |
Intel Corp.
� |
Q4/15
� |
2010-05-18 |
|
[ 873 ]
�
� |
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics
�
� |
France T�l�comq
� |
Q13/15
� |
2010-05-18 |
|
[ 872 ]
�
� |
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting
�
� |
France T�l�com
,
Tellabs
� |
Q13/15
� |
2010-05-18 |
|
[ 871 ]
�
� |
G.8260: definition of floor delay, delay steps, and comments on Appendix I
�
� |
France T�l�com
� |
Q13/15
� |
2010-05-18 |
|
[ 870 ]
�
� |
G.8260: list of requirements for PDV metrics
�
� |
France T�l�com
� |
Q13/15
� |
2010-05-18 |
|
[ 869 ]
�
� |
G.cx: A concern regarding operation with non-standardized systems
�
� |
CopperGate Communications
� |
Q4/15
� |
2010-05-18 |
|
[ 868 ]
�
� |
G.hn: IPR Statement of CopperGate Communications
�
� |
CopperGate Communications
� |
Q4/15
� |
2010-05-18 |
|
[ 867 ]
�
� |
G3 Low Frequency Narrow Band OFDM PLC Proposal
�
� |
Maxim Integrated Products, Inc.
� |
Q4/15
� |
2010-05-18 |
|
[ 866 ]
�
� |
Rogue ONU draft supplement
�
� |
Verizon
� |
Q2/15
� |
2010-05-18 |
|
[ 865 ]
�
� |
G.8260: methodology to perform a PDV measurement
�
� |
France T�l�com, Ericsson
� |
Q13/15
� |
2010-05-18 |
|
[ 864 ]
�
� |
G.hnem: Report on informal ad-hoc - Performance of the FEC for G.hnem
�
� |
Lantiq
,
DS2
,
Yitran
� |
Q4/15
� |
2010-05-18 |
|
[ 863 ]
�
� |
G.hnem: Proposal to specify immediate acknowledgement
�
� |
Lantiq
� |
Q4/15
� |
2010-05-18 |
|
[ 862 ]
�
(Rev.1)� |
The removal of Floor Delay steps in Network PDV metrics
�
� |
Calnex Solutions
� |
Q13/15
� |
2010-05-18 |
|
[ 861 ]
�
� |
Development of a Wander requirement for 1588v2 Boundary Clocks
�
� |
Calnex Solutions
� |
Q13/15
� |
2010-05-18 |
|
[ 860 ]
�
� |
Proposed addition of 'No APS Message Received' defect to G.8021
�
� |
Tellabs
� |
Q9/15
� |
2010-05-18 |
|
[ 859 ]
�
� |
Further considerations for ODUk delay measurement processes
�
� |
Tellabs
� |
Q9/15
� |
2010-05-18 |
|
[ 858 ]
�
� |
Adding administrative state to ODU multiplexing adaptation functions
�
� |
Tellabs
� |
Q9/15
� |
2010-05-18 |
|
[ 857 ]
�
� |
G.hnem: Proposal for G.hnem encryption scheme
�
� |
Lantiq
� |
Q4/15
� |
2010-05-18 |
|
[ 856 ]
�
� |
G.INP: SRA Proposal for G.998.4
�
� |
Broadcom
� |
Q4/15
� |
2010-05-18 |
|
[ 855 ]
�
� |
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links
�
� |
Broadcom
� |
Q4/15
� |
2010-05-18 |
|
[ 854 ]
�
� |
G.vdsl: G.adsl: Comments and way forward on INM accuracy
�
� |
Broadcom
� |
Q4/15
� |
2010-05-18 |
|
[ 853 ]
�
� |
Proposed description of optical source for optical phase sensitive modulation/demodulation schemes used for high-speed large-capacity WDM transmission
�
� |
NTT
� |
Q7/15
� |
2010-05-17 |
|
[ 852 ]
�
� |
Proposal for adding a new category, A3, to ITU-T Recommendation G.657 (Full Texts)
�
� |
Corning
� |
Q5/15
� |
2010-05-17 |
|
[ 851 ]
�
� |
Number not used
�
� |
SoftBank Telecom
� |
Q5/15
� |
2010-05-17 |
|
[ 850 ]
�
� |
VDSL2 issues for discussion at dedicated DSL meetings
�
� |
Swisscom Ltd
� |
Q4/15
� |
2010-05-17 |
Resultats:352 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):