Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2017-06-19�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2017-06-19)�

UIT-T�SG 15

Transport, access and home

Periodo de estudios 2017

Reuni�n� del 2017-06-19 al 2017-06-30

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-12-062021-04-122020-09-072020-01-272019-07-012018-10-082018-01-29

Resultados :398 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 198 ]
G.8271.2: Editor's Corrections � Calnex Solutions Limited Q13/15 2017-06-05
[ 197 ]
G.8271: Editor's Corrections � Calnex Solutions Limited Q13/15 2017-06-05
[ 196 ]
Correction to QL values for new clocks, Option II Networks - G.8264 � Nokia USA Q13/15 2017-06-05
[ 195 ]
(Rev.1)
Support of clearing counters for legacy type PM MEs � Calnex Solutions Limited (United Kingdom) Q2/15 2017-06-05
[ 194 ]
(Rev.1)
Support of Extended VLAN filtering type for upper layer protocols � Calnex Solutions Limited (United Kingdom) Q2/15 2017-06-05
[ 193 ]
(Rev.1)
G.vdsl: Proposed changes in Annex D and main body for LR-VDSL � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2017-06-05
[ 192 ]
(Rev.1)
LR-VDSL2 upstream PSD � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2017-06-05
[ 191 ]
PON PMD Calculator - OOC, OOB and IBXT � Calnex Solutions Limited (United Kingdom) Q2/15 2017-06-05
[ 190 ]
(Rev.1-3)
In-Band Crosstalk Due To Multiple ONU Reflections - Version 2 � Calnex Solutions Limited (United Kingdom) Q2/15 2017-06-05
[ 189 ]
G.fast: Triggering Criteria for RMCR � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 188 ]
G.fast: Improving RMCR � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 187 ]
G.fast: DTA and RPA � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 186 ]
G.fast: A Coordinated DTA Procedure to Avoid Unexpected NEXT � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 185 ]
G.fast: Comparison of two power control methods for precoding � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 184 ]
G.mgfast: Constellation Shaping with LDPC Coded Modulation � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 183 ]
G.fast: Simulation Results for Maximum Ration Transmission � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 182 ]
G.8273.2: Noise transfer: SyncE to PTP frequency response � Calnex Solutions Limited Q13/15 2017-06-05
[ 181 ]
(Rev.1)
Proposal on extending G.sup56 to support beyond 10G interface optimized for the transport of CPRI � China Mobile Communications Corporation , CAICT , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Intel Corporation (United States) , IP Light , Xilinx Incorporation Q11/15 2017-06-05
[ 180 ]
G.hn: Secure Admission - auto-mode mechanism � Sigma Designs Israel S.D.I Ltd. Q18/15 2017-06-05
[ 179 ]
(Rev.1)
Layer adjacency discovery based on FlexE and FlexO/OTUCn � China Unicom , FiberHome Technologies Group (China) Q14/15 2017-06-05
[ 178 ]
Relationship between G.800 topology and G.7711 FDs/Links � China Unicom , FiberHome Technologies Group (China) Q14/15, Q12/15 2017-06-05
[ 177 ]
(Rev.1)
Interaction between SDN Controller and Applications � China Unicom , FiberHome Technologies Group (China) Q14/15, Q12/15 2017-06-05
[ 176 ]
Validate resilience model of G.7711 for simple ERP � China Unicom , FiberHome Technologies Group (China) Q9/15, Q14/15 2017-06-05
[ 175 ]
Secure Admission in G.hn networks - passphrase based procedure � Sigma Designs Israel S.D.I Ltd. Q18/15 2017-06-05
[ 174 ]
Proposed 40 channels application parameters for G.metro � ADVA Optical Networking (United Kingdom) , China Unicom , Finisar Corporation , Huawei Technologies Co., Ltd. (China) , Telefon AB - LM Ericsson (Sweden) , ZTE Corporation (China) Q6/15 2017-06-05
[ 173 ]
Terrestrial deployment and 400G system test results of G.654 fibre in China Unicom � China Unicom Q6/15, Q5/15 2017-06-05
[ 172 ]
ESMC Padding bits in G.8264 � Huawei Technologies Co., Ltd. (China) , Nokia USA , Telefon AB - LM Ericsson (Sweden) Q13/15 2017-06-05
[ 171 ]
(Rev.1)
G.8271.1 Appendix V failure scenarios � Telefon AB - LM Ericsson (Sweden) Q13/15 2017-06-05
[ 170 ]
G.8273.2: Noise transfer: PTP to PTP frequency response � Calnex Solutions Limited Q13/15 2017-06-05
[ 169 ]
Architecture Requirement of 5G transport network � China Mobile Communications Corporation , FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q12/15, Q11/15, Q10/15 2017-06-05
[ 168 ]
Defects of time degradation � China Mobile Communications Corporation Q13/15 2017-06-05
[ 167 ]
Proposal on mapping table of PTP clockClass to SSM � China Mobile Communications Corporation Q13/15 2017-06-05
[ 166 ]
Frequency offset monitoring function � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) Q13/15 2017-06-05
[ 165 ]
Considerations on sync requirements and network budget for 5G � China Mobile Communications Corporation Q13/15 2017-06-05
[ 164 ]
Requirement and solutions for PON systems above 10Gbps per wavelength � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) Q2/15 2017-06-05
[ 163 ]
Proposal for revising G.697 to improve e-OTDR related contents � China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) Q6/15 2017-06-05
[ 162 ]
Analysis on PON synchronization alarms � China Mobile Communications Corporation Q2/15 2017-06-05
[ 161 ]
Analysis on PON ONU synchronization configuration � China Mobile Communications Corporation Q2/15 2017-06-05
[ 160 ]
Proposal on sync management requirements and model � China Mobile Communications Corporation Q14/15 2017-06-05
[ 159 ]
Standards Gap Analysis of FlexE � China Mobile Communications Corporation , FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q9/15, Q10/15 2017-06-05
[ 158 ]
Dual-Homing Coordination for MPLS-TP � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) Q9/15, Q14/15, Q10/15 2017-06-05
[ 157 ]
Requirements of future 5G mobile transport network � China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2017-06-05
[ 156 ]
Proposal to start the work for the revision of G.9973 � Fujitsu Limited (Japan) , Japan Advanced Institute of Science and Technology , Mitsubishi Electric Corporation Q18/15 2017-06-05
[ 155 ]
The Relationship between Management and SDN controller � China Unicom Q14/15, Q12/15 2017-06-05
[ 154 ]
Proposal to start new projects to specify 5G transport over OTN � China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q11/15 2017-06-05
[ 153 ]
Cascaded protection � China Unicom , Huawei Technologies Co., Ltd. (China) Q9/15, Q11/15 2017-06-05
[ 152 ]
Consideration on partial rate granularity of FlexE aware signal on each PHY � Fujitsu Limited (Japan) Q11/15 2017-06-05
[ 151 ]
OTN interface protection � China Unicom Q9/15, Q11/15 2017-06-05
[ 150 ]
G.mgfast: Proposing some basic agreements � Sckipio Technologies S.I. Ltd. (Israel) Q4/15 2017-06-05
[ 149 ]
Comments on draft new Recommendation L.110 (ex L.dsa) � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q16/15 2017-06-05
Resultados :398 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25