Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2013 ]
�
� |
Draft Supplement to ITU-T G-series Recommendations 25 Gb/s per wavelength transmission technologies over PON
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/15
� |
2016-09-05 |
|
[ 2012 ]
�
� |
The suggestion about YANG module of MPLS-TP OAM based on G.8113.1
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q10/15
� |
2016-09-05 |
|
[ 2011 ]
�
� |
G.hn Coax Base band: Long cable multipath analysis
�
� |
Sigma Designs Israel S.D.I Ltd.
� |
Q18/15
� |
2016-09-05 |
|
[ 2010 ]
�
� |
Protection switching performance
�
� |
Intel Corporation
� |
Q9/15, Q11/15
� |
2016-09-05 |
|
[ 2009 ]
�
� |
Removal of ODUkP-X virtual concatenation functions
�
� |
Intel Corporation
� |
Q11/15, Q10/15
� |
2016-09-05 |
|
[ 2008 ]
�
� |
Motivation for support of Reach Extenders (incl. Dual rate) in XGS-PON
�
� |
Orange
� |
Q2/15
� |
2016-09-05 |
|
[ 2007 ]
�
� |
G.hn: Secure Admission (Editor's Note)
�
� |
Sigma Designs Israel S.D.I Ltd.
� |
Q18/15
� |
2016-09-05 |
|
[ 2006 ]
�
� |
G.fast: removing INP_min_shine in G.9701 Corrigendum 3
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-05 |
|
[ 2005 ]
�
� |
G.hs, G.fast: text proposal for adding codepoints for G.9701 Annex X related items
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-05 |
|
[ 2004 ]
�
(Rev.1)� |
Topics of interest for Q17/15 during next study period
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2016-09-05 |
|
[ 2003 ]
�
(Rev.1)� |
Proposed new appendix for L.wdc
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2016-09-05 |
|
[ 2002 ]
�
(Rev.1)� |
Proposed modifications to draft L.wdc
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2016-09-05 |
|
[ 2001 ]
�
(Rev.1)� |
G.fast: Text updates of Annex X sections (in G.9701 & G.9700) on profiles, termination impedance and transmit power for coax cables
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-05 |
|
[ 2000 ]
�
� |
Wavelength Plan Proposal for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2016-09-05 |
|
[ 1999 ]
�
� |
PDV Templates for Testing Partial Timing Support
�
� |
Qulsar, Inc.
� |
Q13/15
� |
2016-09-05 |
|
[ 1998 ]
�
� |
Proposed improvements on draft L.nrr-frm
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2016-09-05 |
|
[ 1997 ]
�
� |
Proposals for draft revision of recommendation L.60
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q16/15
� |
2016-09-05 |
|
[ 1996 ]
�
� |
Proposals on revision of Rec. G.652 & G.657
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2016-09-05 |
|
[ 1995 ]
�
� |
The suggestion about YANG module based on MPLS-TP
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q10/15
� |
2016-09-05 |
|
[ 1994 ]
�
� |
Proposed text of Cooperative DBA for G.989.3 Am1
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
,
Verizon Communication Corporation
� |
Q2/15
� |
2016-09-05 |
|
[ 1993 ]
�
(Rev.1)� |
Draft revised Recommendation G.972
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2016-09-05 |
|
[ 1992 ]
�
� |
A proposal to change a maximum number of burst allocation series for improving upstream latency for G.989.3 Am1
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/15
� |
2016-09-05 |
|
[ 1991 ]
�
� |
Proposal to the "Test methods for the macrobend loss" of G.650.1
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2016-09-05 |
|
[ 1990 ]
�
(Rev.1)� |
Proposal on adding appendix of cabinet structure illustration to draft L.oxcon
�
C1990 Revision 1 corrects the sources. There is no change to the content of the Contribution
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile
,
Commscope Connectivity Belgium
,
FiberHome Technologies
� |
Q16/15
� |
2016-09-05 |
|
[ 1989 ]
�
(Rev.1)� |
Proposals on rounding rules in G.65x series Recommendations
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2016-09-05 |
|
[ 1988 ]
�
� |
Proposal to create a new Recommendation "Requirements for Passive Optical Nodes: Fiber Distribution Box"
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q16/15
� |
2016-09-05 |
|
[ 1987 ]
�
� |
G.vlc: considerations of G.vlc Data link layer specification
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q18/15
� |
2016-09-05 |
|
[ 1986 ]
�
� |
G.vlc: considerations of OFDM parameter design
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q18/15
� |
2016-09-05 |
|
[ 1985 ]
�
� |
Considerations on metro 100Gb/s interoperability
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q11/15
� |
2016-09-05 |
|
[ 1984 ]
�
� |
Proposal for revising G.672 to include flexible grid technology
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q7/15
� |
2016-09-05 |
|
[ 1983 ]
�
� |
EVM test of commercial transponders and impairment simulation setup
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2016-09-05 |
|
[ 1982 ]
�
(Rev.1)� |
The modulation style of transparent AMCC
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2016-09-05 |
|
[ 1981 ]
�
� |
Proposed augmentation of protection switching function in G.7710 EMF
�
� |
NEC Corporation
� |
Q14/15
� |
2016-09-05 |
|
[ 1980 ]
�
� |
Proposed description of practices for re-establishing optical infrastructures with elastic optical network technologies
�
� |
NEC Corporation
� |
Q17/15
� |
2016-09-05 |
|
[ 1979 ]
�
� |
Band Gap and Wavelength Plan Proposal for G.metro
�
� |
Finisar Corporation
� |
Q6/15
� |
2016-09-04 |
|
[ 1978 ]
�
(Rev.1)� |
G.fast: a corrigendum item for correcting a mistake in clause 8.3.1 "PTM-TC DTU format" of G.9701
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-04 |
|
[ 1977 ]
�
� |
TC Noise Model Analysis
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2016-09-04 |
|
[ 1976 ]
�
+Corr.1� |
Removing Unnecessary Sections in G.8273.3
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2016-09-04 |
|
[ 1975 ]
�
+Corr.1� |
G.8261 Editorial Comments
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2016-09-04 |
|
[ 1974 ]
�
� |
Testing G.8261 Scenarios against G.8271.2 Network Limits
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2016-09-04 |
|
[ 1973 ]
�
� |
5G IEEE 1914 presentation and OTN impact
�
� |
IP Light
� |
Q11/15
� |
2016-09-04 |
|
[ 1972 ]
�
� |
Revised 6.1 in the draft G.RoF
�
� |
National Institute of Information and Communications Technology
� |
Q2/15
� |
2016-09-04 |
|
[ 1971 ]
�
� |
Reference switching and eEEC specification (Part 2)
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2016-09-03 |
|
[ 1970 ]
�
� |
Proposed updates to G.8052 "Protocol-neutral management information model for the Ethernet transport capable network element"
�
� |
Alcatel-Lucent USA Inc.
� |
Q14/15
� |
2016-09-03 |
|
[ 1969 ]
�
� |
Proposed updates to G.874.1 "OTN: Protocol neutral management information model for the network element view"
�
� |
Alcatel-Lucent USA Inc.
� |
Q14/15
� |
2016-09-03 |
|
[ 1968 ]
�
� |
Proposed documentation structure of G.7711 Revision
�
� |
Alcatel-Lucent USA Inc.
,
FiberHome Technologies Group
� |
Q14/15
� |
2016-09-03 |
|
[ 1967 ]
�
� |
Proposal for Multiservice G.RoF optical architecture and configuration
�
� |
Georgia Institute of Technology
,
Telekom Malaysia Berhad
� |
Q2/15
� |
2016-09-03 |
|
[ 1966 ]
�
� |
Proposed modifications to draft G.709.1 for PTP over FlexO OSMC
�
� |
Microsemi Corporation
� |
Q13/15, Q11/15
� |
2016-09-03 |
|
[ 1965 ]
�
� |
Considerations for 200G and 400G FlexO PHYs
�
� |
Microsemi Corporation
� |
Q11/15
� |
2016-09-03 |
|
[ 1964 ]
�
� |
Layer considerations with FlexO
�
� |
Microsemi Corporation
� |
Q12/15, Q11/15
� |
2016-09-03 |
Resultados :2210 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):