Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 577 ]
�
� |
Proposal for the update of G.8101 Appendix II
�
� |
Hitachi, Ltd.
� |
Q3/15
� |
2014-03-10 |
|
[ 576 ]
�
� |
Proposed updates to currentProblemList in G.8152
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2014-03-10 |
|
[ 575 ]
�
� |
Proposed update MI list to On-demand and Pro-active measurement object class in G.8152
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2014-03-10 |
|
[ 574 ]
�
� |
The proposal about the allocation of OTN Sy nchronisation Message channel (OSMC)
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 573 ]
�
� |
The proposal about the value of K(OTUk) to support OSMC
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 572 ]
�
� |
The method about the frequency of PTP packet in the OSMC
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 571 ]
�
� |
Consideration on the mapping of an ODUj frame into the OPUCn payload
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 570 ]
�
(Rev.1)� |
consideration of recovery network sinario in MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-10 |
|
[ 569 ]
�
� |
Different switching types in each domain of MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-10 |
|
[ 568 ]
�
(Rev.1)� |
Consideration of Network Objectives in the latest draft of G.mdsp
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-10 |
|
[ 567 ]
�
� |
Measurement results for spectral excursion in 100G DP-QPSK application
�
� |
FiberHome Technologies Group
� |
Q6/15
� |
2014-03-10 |
|
[ 566 ]
�
+Add.1� |
Proposal to start a new work item on optical distribution networks and related system based on ultra dense wavelength division multiplexing
�
Addendum 1 to C-0566 is provided by TSB to correct contact information.
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 565 ]
�
� |
Analysis of relationship of NM/Controllerand Application Scenario
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
� |
Q14/15, Q12/15
� |
2014-03-10 |
|
[ 564 ]
�
� |
Multiplexed CPRI over ODUflex efficient mapping
�
� |
China Mobile Communications Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Orange
� |
Q11/15
� |
2014-03-10 |
|
[ 563 ]
�
� |
Proposal for discussion on the revision of Rec. G.975.1
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q8/15
� |
2014-03-10 |
|
[ 562 ]
�
� |
Comments on the title and scope of G.657
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2014-03-10 |
|
[ 561 ]
�
� |
Comments and proposal for the revision of G.650.2
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2014-03-10 |
|
[ 560 ]
�
� |
Proposal to define and describe wavelength management and control channel in G.multi
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 559 ]
�
� |
Proposal on G.989.2 Amendment for dual-rate PMD implementation
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 558 ]
�
� |
Proposal for revision of cable documents L.10, L. 26, L.43
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q16/15
� |
2014-03-10 |
|
[ 557 ]
�
� |
The possibility of CPRI signal transmission over TWDM-PON system in G.989.3
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 556 ]
�
� |
Thermal Profiles for Telecom Equipment
�
� |
Sprint Corporation
,
Rakon, UK
� |
Q13/15
� |
2014-03-10 |
|
[ 555 ]
�
� |
Proposal for revision of L.53
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2014-03-10 |
|
[ 554 ]
�
� |
G.8271.2: SOAM Assisted Partial Timing Support
�
� |
Sprint Corporation
,
ADVA, Israel
� |
Q13/15
� |
2014-03-10 |
|
[ 553 ]
�
� |
Proposal for new test methods of Hydrogen Aging
�
� |
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2014-03-10 |
|
[ 552 ]
�
� |
G.8271.2: Budget proposal for Assisted Partial Timing Support
�
� |
Sprint Corporation
,
Calnex, UK
� |
Q13/15
� |
2014-03-10 |
|
[ 551 ]
�
� |
Proposal of draft revised L.25
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2014-03-10 |
|
[ 550 ]
�
� |
Drafting proposal of new recommendation L.91
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2014-03-10 |
|
[ 549 ]
�
� |
Assisted Partial Timing Support Clock
�
� |
Sprint Corporation
� |
Q13/15
� |
2014-03-10 |
|
[ 548 ]
�
� |
Proposal of Appendix for L.omtl
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2014-03-10 |
|
[ 547 ]
�
� |
Proposed Supplement for the guidance to performance measurement by ETH OAM
�
� |
Fujitsu Limited
,
NEC Corporation
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 546 ]
�
� |
Draft guidance to performance measurement by ETH OAM
�
� |
Fujitsu Limited
,
NEC Corporation
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 545 ]
�
� |
Proposed corrections to G.8121 series and G.8151 for alignment
�
� |
Fujitsu Limited
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 544 ]
�
� |
Proposed update items to G.8121 series in align with G.8151 and G.8152
�
� |
Fujitsu Limited
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 543 ]
�
� |
Proposed architecture for MPLS-TP linear protection
�
� |
Fujitsu Limited
� |
Q9/15
� |
2014-03-10 |
|
[ 542 ]
�
� |
2-stage ODU SMP protocol operation in beyond 100G networks
�
� |
Coriant GmbH & Co. KG
� |
Q9/15
� |
2014-03-09 |
|
[ 541 ]
�
� |
Performance analysis of OTUC4 and OTLC4.16 frame alignment
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 540 ]
�
� |
Logical lane format of OTUCn without FEC
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 539 ]
�
� |
FEC options of OTUCn
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 538 ]
�
� |
Proposed mapping for new FC and IB client signals
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 537 ]
�
� |
Proposal for OTUCn, ODUCn and OPUCn Payload bit rates
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 536 ]
�
� |
B100G FEC and logical lane considerations
�
� |
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 535 ]
�
� |
B100G extension of G.709 and G.798
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 534 ]
�
� |
Proposed text for optical layer overhead clauses 15, 15.1, 15.4 and 15.5
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 533 ]
�
� |
Optical layer overhead considerations and proposal for OTN B100G
�
� |
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q6/15, Q11/15
� |
2014-03-09 |
|
[ 532 ]
�
� |
Proposal to add multi-vendor IaDI section layer overhead
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 531 ]
�
� |
Include support for OTM-1 mvIaDI in G.709
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 530 ]
�
� |
Modifications to the text in clause 15.5.4 "OCh OH transport over OTM-1 multi-vendor IaDI"
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 529 ]
�
� |
Proposal of Multi-failure processing for ODUsmp
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2014-03-09 |
|
[ 528 ]
�
� |
Proposal of APS signalling transmitting pattern for ODUsmp
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-03-09 |
Resultados :337 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):