Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2007-06-04�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2007-06-04)�

UIT-T�SG15

Infraestructuras de las redes �pticas y de otras redes de transporte

Periodo de estudios 2005

Reuni�n� del 2007-06-04 al 2007-06-15

Lugar : Suiza [Ginebra]

Otras reuniones : 2008-12-012008-02-112006-10-302006-02-062005-05-162004-11-29

Resultados :332 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 424 ]
Comparing the extended linear protection mechanisms with the wrapping and steering in the T-MPLS ring � ZTE Corporation Q9/15 2007-05-24
[ 423 ]
Applying the extended linear protection switching mechanisms in the T-MPLS ring � ZTE Corporation Q9/15 2007-05-24
[ 422 ]
An extension of the bit rate agnostic mapping method for constant bit rate signals � ZTE Q11/15 2007-05-24
[ 421 ]
Correcting the binding relationship between different control plane components in G.7716 � ZTE Corporation Q14/15 2007-05-24
[ 420 ]
A proposed description of Ethernet Virtual Private Rooted Multipoint (EVP-RMP) service � Alcatel Shanghai Bell, LSI Corp Q11/15 2007-05-24
[ 419 ]
(Rev.1)
Definition of rooted multipoint service � Alcatell Shanghai Bell, LSI Corp Q11/15 2007-05-24
[ 418 ]
Proposed modification of accounting management to G.7718 � China, Telecom Q14/15 2007-05-24
[ 417 ]
Proposals for control plane performance monitoring parameters � China Academy of Telecommunications Research (MII) Q14/15, Q12/15 2007-05-24
[ 416 ]
Timing Requirements for packet-based methods � Semtech Q13/15 2007-05-24
[ 415 ]
Metrics related to QoS and QoE related to timing � Semtech Q13/15 2007-05-24
[ 414 ]
Traffic Models in G.8261 - Part 2 � Semtech Q13/15 2007-05-24
[ 413 ]
Traffic Models in G.8261 - Part 1 � Semtech Q13/15 2007-05-24
[ 412 ]
Support of manageable multicast in G.984.4 � Ministry of Information Industry of P.R. China Q2/15 2007-05-24
[ 411 ]
Proposed text for section 6, 9.3 and 11.2.1 of G.7716 v0.7 draft � Ministry of Information Industry of P.R. China Q14/15 2007-05-24
[ 410 ]
Proposed text for section 5 of G.7716 v0.7 draft � Ministry of Information Industry of P.R. China Q14/15 2007-05-24
[ 409 ]
Proposals of new interface to LRM component in G.8080 � Ministry of Information Industry of P.R. China Q12/15 2007-05-24
[ 408 ]
Explanations to ASON directly support VCAT and LCAS (For Information) � Ministry of Information Industry of P.R. China Q12/15 2007-05-24
[ 407 ]
Support point to multi point connection in G.8080 � Ministry of Information Industry of P.R. China Q12/15 2007-05-24
[ 406 ]
Proposed new section 14 in G.7716 v0.7 draft � Ministry of Information Industry of P.R. China Q14/15 2007-05-24
[ 405 ]
Proposed text for section 10.3 of G.7716 v0.7 draft � Ministry of Information Industry of P.R. China Q14/15 2007-05-24
[ 404 ]
Proposal to table 1 of section 8.1 of G.7716 v0.7 draft � Ministry of Information Industry of P.R. China Q14/15 2007-05-24
[ 403 ]
WITHDRAWN - See C476 � N/A (no se aplica) � N/A
[ 402 ]
G.paclock Synchronisation Selection � BT plc Q13/15 2007-05-24
[ 401 ]
Synchronous Ethernet - Synchronisation Status Message (SSM) Transport Requirements � BT plc Q13/15 2007-05-24
[ 400 ]
Framework for Extracting Timing Metrics from a Packet-Based Network � Symmetricom Q13/15 2007-05-22
[ 399 ]
IEEE-1588v2 Telecom Profile for Constrained Networks � Semtech , Symmetricom Q13/15 2007-05-22
[ 398 ]
Proposals for Clause 8.2, Reference Timing Signal over Packet Networks in G.8261 � Ericsson , Symmetricom Q13/15 2007-05-22
[ 397 ]
Synchronous Ethernet Equipment - External Synchronisation (non Traffic carrying) Interface Requirements � BT Q13/15 2007-05-24
[ 396 ]
Accessible Regions of ARQ and Interleaved RS � BT plc Q4/15 2007-05-24
[ 395 ]
Component and protocol for Management of Control Channels in G.8080 � ETRI Q14/15, Q12/15 2007-05-24
[ 394 ]
Configuration, Liveliness Check and Resilience of Control Channels in ASON � ETRI Q14/15, Q12/15 2007-05-24
[ 393 ]
Completion of jitter specifications in G.783 and G.825 for 10 Gb/s and 40 Gb/s � Lucent Technologies Germany Q9/15, Q13/15 2007-05-24
[ 392 ]
Continuation of jitter specifications in G.783 and G.825 for and 40 Gb/s rates � Alcatel-Lucent Germany Q6/15, Q9/15, Q13/15 2007-05-24
[ 391 ]
Frame Delay Measurement Considerations for G.8021 � Nortel Networks (Europe) Q9/15 2007-05-24
[ 390 ]
A proposal for EXER operation in G.8031v2 � Korea (Republic of) Q9/15 2007-05-24
[ 389 ]
A proposed modification to criteria for dFOP in G.8021v2 and G.8031v2 � Korea (Republic of) Q9/15 2007-05-24
[ 388 ]
(Rev.1)
OTU4/ODU4 rates spreadsheet for proposed OTU4/ODU4 frame format in G.709 � Korea (Republic of) Q11/15 2007-05-24
[ 387 ]
(Rev.1)
Proposal for new OTU4/ODU4 frame format in G.709 � Korea (Republic of) Q11/15 2007-05-24
[ 386 ]
G.hn: Proposed modifications to "Draft text for G.hn - version 1.0" � CopperGate Communications Q4/15 2007-05-24
[ 385 ]
G.hn: Powerline communications channel characterization up to 100 MHz � France Telecom Q4/15 2007-05-24
[ 384 ]
G.8261 - Clarification of the two main aspects CES / PNT in the document � Ericsson , France Telecom Q13/15 2007-05-24
[ 383 ]
Proposal to include additional text for characterization of various PXC output power change patterns and configurations in G.otf � Nippon Telegraph and Telephone Corporation (NTT) Q6/15 2007-05-24
[ 382 ]
Specification of an ODU4 in Recommendation G.709 and consequences for optical interface Recommendations � Nokia Siemens Networks , Deutsche Telekom Q11/15, Q6/15 2007-05-23
[ 381 ]
Information on relationship of terms between submarine system and the other recommendations � NTT Q8/15 2007-05-23
[ 380 ]
Proposal on new definitions and terms for Rec. G.972 � NTT Q8/15 2007-05-23
[ 379 ]
Proposal on additional measurement technique in Rec. G.976 � NTT Q8/15 2007-05-23
[ 378 ]
Proposal on a new Supplement regarding with the general characteristics of an optical fibre under actual use conditions � NTT Q5/15 2007-05-23
[ 377 ]
Proposed update to G.Sup42 and its agreement � NTT , Mitsubishi Electric Q1/15 2007-05-23
[ 376 ]
Mapping of 100 GBE into ODU2-11v and ODU3-3v � Deutsche Telekom Q11/15 2007-05-23
[ 375 ]
OTN and 40 GbE � Deutsche Telekom Q11/15 2007-05-23
Resultados :332 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-9