Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP3J : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP3J� C�

UIT-R�WP3J

Fundamentos de la Propagaci�n

Resultados :303 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 103 ]
Activity Report of Correspondence Group 3J-1 Gaseous attenuation � CG 3J-1 2021-06-01
[ 102 ]
Framework used to propose preliminary draft revision to Recommendations ITU-R P.676-12, ITU-R P.836-6 and ITU-R P.1510-1 � CG 3J-1 2021-06-01
[ 101 ]
Correspondence Group 3J-17 Activity Report � CG 3J-17 2021-05-21
[ 100 ]
Activity Report of Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products � CG 3M-3 2021-05-21
[ 99 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy for information to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C and 7D) - Propagation information related to studies under Resolution 731 (Rev.WRC-19) and other issues above 71 GHz � WP 7C 2021-05-07
[ 98 ]
+Ann.1-17
Report on the meeting of Working Party 3J (e-Meeting, 26-29 April 2021) � Chairman, WP 3J 2021-04-29
[ 97 ]
Final List of Participants - Working Party 3J (E-meeting, 26-29 April 2021) � Director, BR 2021-04-29
[ 96 ]
List of documents issued (Documents 3J/61 - 3J/96) � BR, Study Groups Department 2021-04-27
[ 95 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7D (copy to Working Parties 3J and 3M for information) - WRC-23 agenda item 1.14: system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz � WP 7C AI1.14 2021-04-23
[ 94 ]
Reply liaison statement to Working Party 3J - Earth surface bistatic scattering coefficient prediction � WP 7C 2021-04-23
[ 93 ]
Terrain loss measurement between non-GSO satellites and Earth stations and model proposals � China (People's Republic of) 2021-04-16
[ 92 ]
Liaison statement to Working Parties 3J, 3K and 3M - Request for review of propagation methodology in Report ITU-R RA.[RAS_IMT_COMPAT_43_GHZ] � WP 7D 2021-04-20
[ 91 ]
Correspondence Group 3J-17 Activity Report � CG 3J-17 2021-04-19
[ 90 ]
Draft reply liaison statement to ITU-R Working Party 7C - Earth surface bistatic scattering coefficient prediction � European Space Agency 2021-04-19
[ 89 ]
(Rev.1)
Report on activities during the period August 2020 to April 2021 � CG 3J-11 2021-04-19
[ 88 ]
Draft reply liaison statement to Working Party 5D - WRC-23 agenda item 1.4 � Japan AI1.4 2021-04-19
[ 87 ]
Proposed draft revision of Recommendation ITU-R P.1410-5 - Propagation data and prediction methods required for the design of terrestrial broadband radio access systems operating in a frequency range from 3 to 60 GHz � Japan 2021-04-19
[ 86 ]
Discussion documents- Measurement result (or plan) for site specific model of building entry loss - Prediction of building entry loss � Japan 2021-04-19
[ 85 ]
Proposed draft revision of Recommendation ITU-R P.833-9 - Attenuation in vegetation � Japan 2021-04-19
[ 84 ]
Proposed draft revision of Recommendation ITU-R P.2108 - Prediction of clutter loss � Japan 2021-04-19
[ 83 ]
[Working document towards a] preliminary draft revision of Recommendation ITU-R P.1409-1 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 1 GHz � Japan 2021-04-19
[ 82 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 1A, 1B and 7C) - Request for technical characteristics under Resolution 731 (Rev.WRC-19) � WP 7D 2021-04-19
[ 81 ]
Note to Chairman of Working Party 7C - Modelling of Earth surfaces bistatic scattering � Chairman, WP 3J 2021-04-19
[ 80 ]
Wind-related data products to be used in conjunction with the sea surface reflection model � Institute of Electrical and Electronics Engineers, Inc. 2021-04-18
[ 79 ]
Proposed modifications to working document towards a preliminary draft revision of Recommendation ITU-R P.1409-1 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 1 GHz � Russian Federation 2021-04-15
[ 78 ]
Activity Report of Correspondence Group 3J-1 gaseous attenuation � CG 3J-1 2021-04-15
[ 77 ]
Attenuation of atmospheric gases cosecant elevation angle dependence of slant attenuation � Russian Federation 2021-04-15
[ 76 ]
Proposed draft revision to Recommendation ITU-R P.833-9 - Attenuation in vegetation � United States of America 2021-04-12
[ 75 ]
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues Relating to the HAPS Propagation Model � Chairman, CG 3J-3K-3M-14 2021-04-12
[ 74 ]
Report on activities of the Correspondence Group - Building Entry Loss � Chairman, CG 3J-3K-3M-8 2021-03-29
[ 73 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4 � WP 5D AI1.4 2021-03-15
[ 72 ]
Proposed draft reply liaison statement to Working Party 1A regarding working document towards a preliminary draft revision of Report ITU-R SM.2352-0 (copied to working Parties 3K and 3M for information) � Chairman, WP 3J Q237/1 2021-02-15
[ 71 ]
Liaison statement to Working Parties 3J, 3K and 3M - Working document towards a preliminary draft revision of Report ITU-R SM.2352-0 � WP 1A Q237/1 2020-12-14
[ 70 ]
Liaison statement to Working Parties 3J, 3K, and 3M - Use of the 252-296 GHz frequency band by the land-mobile service applications � WP 5A Q256/5 2020-12-01
[ 69 ]
Reply liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5D, 6A, and 7D for information) - WRC-23 agenda item 9.1, topic a) � WP 5C AI9.1A) 2021-01-26
[ 68 ]
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M and 5A for information) - Mitigation techniques and specific conditions to be applied to the fixed service applications in the frequency bands 296-306 GHz, 313-318 GHz and 333-356 GHz, to ensure the protection of Earth exploration-satellite service (passive) applications in accordance with RR No. 5.564A � WP 5C 2020-11-20
[ 67 ]
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M and 5C for information) - Assessment of mitigation techniques and specific conditions to be applied to the land-mobile service applications in the frequency bands 296-306 GHz, 313-318 GHz and 333 356 GHz, to ensure the protection of Earth exploration-satellite service (passive) applications... � WP 5A 2020-11-20
[ 66 ]
Liaison statement to Working Parties 3J, 3K and 3M - WRC-23 agenda item 1.4 � WP 5D AI1.4 2020-10-27
[ 65 ]
Reply liaison statement to ITU-R Working Parties 3K and 3M (copy to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C, and 7D for information) - Preparations for WRC-23 agenda items 1.1 and 1.2 � WP 5D AI1.2, AI1.1 2020-10-21
[ 64 ]
Liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 5A, 5B, 5C, 5D and 7D) - WRC-23 agenda item 9.1, topic a) � WP 6A AI9.1A) 2021-01-26
[ 63 ]
Reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction � WP 7C 2020-10-05
[ 62 ]
Liaison statement to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7D - Work to be conducted by Working Party 7C under WRC-23 agenda item 9.1, topic a) � WP 7C AI9.1A) 2020-10-05
[ 61 ]
+Ann.1-19
Report on the meeting of Working Party 3J (e-Meeting, 10-20 August 2020) � Chairman, WP 3J 2020-08-20
[ 60 ]
Final list of participants - Working Party 3J (E-meeting, 10-20 August 2020) � Director, BR 2020-08-20
[ 59 ]
List of Documents issued (Documents 3J/1 - 3J/59) � BR, Study Groups Department 2020-08-10
[ 58 ]
Reply liaison statement to Working Party 7C (copied for information to Working Parties 3J, 3M, 4A, 4C, 5A, 5B) - WRC-23 agenda item 1.14 - System technical and operational characteristic in the frequency band 231.5-252 GHz � WP 5C AI1.14 2020-08-07
[ 57 ]
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz � WP 5C 2020-08-06
[ 56 ]
Liaison statement to ITU-R Study Group 3 - Recommendation ITU-R P.341-7 - The concept of transmission loss for radio links � CCT 2020-08-06
[ 55 ]
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz � WP 5A 2020-08-06
[ 54 ]
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Party 1A for information) - Working document towards a preliminary draft revision of Report ITU-R M.2417-0 � WP 5A 2020-08-06
Resultados :303 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2023-10-19