Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 216 ]
�
� |
Apportionment of aggregate interference criterion for dara relay satellite systems in 26 GHz
�
� |
Russian Federation
� |
� |
2017-10-17 |
|
[ 215 ]
�
� |
Proposals for the preliminary draft new Report ITU-R SA.[400 MHz-LIMITS]
�
� |
Russian Federation
� |
AI1.2
� |
2017-10-17 |
|
[ 214 ]
�
� |
Preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - CHARACTERISTICS] - Technical characteristics for telemetry, tracking and command in the space operation service below 1 GHz for non-GSO satellites with short duration missions
�
� |
Korea (Republic of)
� |
AI1.7
� |
2017-10-17 |
|
[ 213 ]
�
� |
Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies
�
� |
Korea (Republic of)
� |
� |
2017-10-17 |
|
[ 212 ]
�
� |
Draft liaison statement to Working Party 4C - WRC-19 agenda item 1.2
�
� |
United States of America
� |
AI1.2
� |
2017-10-11 |
|
[ 211 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 210 ]
�
� |
Reply liaison statement to Task Group 5/1 (copy to WPs 4A, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 209 ]
�
� |
Proposed new ITU-R SA Recommendation - Use of the 2 200-2 290 MHz band by SRS/EESS/SOS satellites
�
� |
European Space Agency
� |
� |
2017-10-16 |
|
[ 208 ]
�
� |
Sharing between short duration NGSO satellites and the radio astronomy service in the 150.05-153 MHz and 406.1-410 MHz frequency bands
�
� |
Netherlands (Kingdom of the)
� |
AI1.7
� |
2017-10-16 |
|
[ 207 ]
�
� |
Proposed amendments to PDNR ITU-R SA.[SHORT DURATION NGSO REQUIREMENTS]
�
� |
Netherlands (Kingdom of the)
� |
AI1.7
� |
2017-10-16 |
|
[ 206 ]
�
� |
Proposed amendments to PDNR ITU-R SA.[SHORT DURATION NGSO-CHARACTERISTICS]
�
� |
Netherlands (Kingdom of the)
� |
AI1.7
� |
2017-10-16 |
|
[ 205 ]
�
� |
Reply liaison statement to Working Party 7B - WRC-19 agenda item 1.3
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 204 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 203 ]
�
� |
Draft reply liaison statement to TG 5-1 Questions
�
� |
United States of America
� |
� |
2017-10-11 |
|
[ 202 ]
�
� |
Recommendation ITU-R SA.1164-2 - Sharing and coordination criteria for service links in data collection systems using GSO satellites in the earth exploration-satellite and meteorological-satellite services
�
� |
United States of America
� |
� |
2017-10-11 |
|
[ 201 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SA.1016 - Sharing considerations relating to deep space research
�
� |
United States of America
� |
� |
2017-10-11 |
|
[ 200 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SA.[SRS FRQ] - Preferred frequencies and bandwidths for manned and unmanned near-Earth research satellites
�
� |
United States of America
� |
� |
2017-10-11 |
|
[ 199 ]
�
� |
Preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - REQUIREMENTS] - Studies to accommodate spectrum requirements in the space operation service for non-geostationary satellites with short duration missions
�
� |
United States of America
� |
AI1.7
� |
2017-10-11 |
|
[ 198 ]
�
� |
Draft CPM text on WRC-19 agenda item 1.3 - Agenda item 1.3
�
� |
United States of America
� |
AI1.3
� |
2017-10-11 |
|
[ 197 ]
�
� |
Preliminary draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 MHz secondary allocation for METSAT to primary and addition of primary allocation to EESS
�
� |
United States of America
� |
AI1.3
� |
2017-10-11 |
|
[ 196 ]
�
� |
Preliminary draft new Report ITU-R SA.[400 MHZ-LIMITS] - To considerer establishing in-band power limits for earth stations operating in the frequency ranges 399.9-400.05 MHz and 401-403 MHz within the MSS, EESS and METSAT services
�
� |
United States of America
� |
AI1.2
� |
2017-10-11 |
|
[ 195 ]
�
� |
Draft CPM text on WRC-19 agenda item 1.2 - Agenda item 1.2
�
� |
United States of America
� |
AI1.2
� |
2017-10-11 |
|
[ 194 ]
�
� |
Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies
�
� |
United States of America
� |
� |
2017-10-11 |
|
[ 193 ]
�
� |
Recommendation ITU-R SA.1163-2 - Aggregate interference criteria for service links in data collection systems for GSO satellites in the earth exploration-satellite and meteorological-satellite
�
� |
United States of America
� |
� |
2017-10-11 |
|
[ 192 ]
�
� |
Preliminary draft new Report ITU-R SA. [SHORT DURATION NGSO - CHARACTERISTICS] - Technical characteristics for telemetry, tracking and command in the space operations service below 1 GHz for non-GSO satellites with short duration missions
�
� |
United States of America
� |
AI1.7
� |
2017-10-11 |
|
[ 191 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING STUDIES] - Studies on the suitability of existing allocations to the space operation service below 1 GHz and additional sharing studies on possible new and/or upgraded allocations
�
� |
United States of America
� |
AI1.7
� |
2017-10-11 |
|
[ 190 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
�
� |
United States of America
� |
AI1.7
� |
2017-10-11 |
|
[ 189 ]
�
� |
Proposed revisions to draft CPM text on WRC-19 agenda item 1.7
�
� |
United States of America
� |
AI1.7
� |
2017-10-11 |
|
[ 188 ]
�
� |
Cost recovery for non-GSO satellite networks
�
� |
Director, BR
� |
� |
2017-10-10 |
|
[ 187 ]
�
� |
Report of the thirteenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
�
� |
International Maritime Organization
� |
� |
2017-09-11 |
|
[ 186 ]
�
� |
Reply liaison statement to Working Party 7B regarding divergence between Recommendations
ITU-R P.2001-2 and ITU-R P.452-16
�
� |
WP 3M
� |
� |
2017-09-06 |
|
[ 185 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 7A, 7B and 7D) - WRC-23 agenda item 2.2 regarding EESS (active) around the 45 MHz frequency region
�
� |
WP 3L
� |
� |
2017-09-06 |
|
[ 184 ]
�
� |
Need for protecting the 26 GHz EESS band and EESS (passive) bands for remote sensing
�
� |
Director, BR
� |
� |
2017-08-14 |
|
[ 183 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 1A
� |
� |
2017-07-10 |
|
[ 182 ]
�
� |
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services
�
� |
WP 1A
� |
� |
2017-07-10 |
|
[ 181 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)
�
� |
WP 1A
� |
� |
2017-07-10 |
|
[ 180 ]
�
� |
Reply liaison statement to Working Party 7B (copied for information to Working Party 5C and Task Group 5/1) - Response to Working Party 7B Questions and Issues regarding PDN Recommendation ITU-R M.[AMS-CHAR 24]
�
� |
WP 5B
� |
� |
2017-06-19 |
|
[ 179 ]
�
� |
Liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3 (copied for information to Working Parties 5B and 5D)
�
� |
WP 5A
� |
AI1.3
� |
2017-06-05 |
|
[ 178 ]
�
� |
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5D, 7B,7C, 7D and Task Group 5/1 - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2017-06-05 |
|
[ 177 ]
�
� |
Reply liaison statement to Working Party 7B on WRC-19 agenda item 1.3
�
� |
WP 5C
� |
AI1.3
� |
2017-06-01 |
|
[ 176 ]
�
� |
Liaison statement to Working Party 7B (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2017-06-01 |
|
[ 175 ]
�
� |
Liaison statement to Working Party 7B - Maritime mobile service characteristic for WRC-19 agenda item 1.3
�
� |
WP 5B
� |
AI1.3
� |
2017-05-30 |
|
[ 174 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5B, 7B and 7C - Request for additional information on parameters in support of sharing and compatibility studies with IMT-2020
�
� |
TG 5/1
� |
� |
2017-05-23 |
|
[ 173 ]
�
� |
Liaison statement to Working Parties 4C, 5A and 7B - Modifications to RR Appendix 4 data elements to be provided for non-geostationary satellite networks/systems
�
� |
WP 4A
� |
� |
2017-05-19 |
|
[ 172 ]
�
� |
Liaison statement to Working Parties 4C, 5A and 7B - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters
�
� |
WP 4A
� |
� |
2017-05-19 |
|
[ 171 ]
�
� |
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations
�
� |
Chairmen, SG 3 and WPs 3J, 3K & 3M
� |
� |
2017-04-13 |
|
[ 170 ]
�
+Ann.1-21� |
Report on the April 2017 meeting of Working Party 7B with a view to its next meeting (October 2017) (Geneva, 5-11 April 2017)
�
� |
Chairman, WP 7B
� |
� |
2017-04-11 |
|
[ 169 ]
�
� |
Final list of participants: Working Party 7B (Geneva, 4-11 April 2017)
�
� |
Director, BR
� |
� |
2017-04-11 |
|
[ 168 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services
�
� |
WP 7D
� |
� |
2017-04-07 |
|
[ 167 ]
�
� |
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13
�
� |
Chairman, WP 6A
� |
AI1.13
� |
2017-04-05 |
Resultados :416 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):