Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP6A : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP6A� C�

UIT-R�WP6A

Prestaci�n de Servicios de Radiodifusi�n Terrenal

Resultados :589 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 389 ]
Reply liaison statement to ITU-R Working Party 5D on revision of Report ITU-R M.2373 (copy to Working Parties 6A and 6C) - Audio-visual capabilities and applications supported by terrestrial IMT systems � WP 6B 2018-05-04
[ 388 ]
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding broadcasting systems � WP 6B 2018-05-04
[ 387 ]
+Ann.1-13
Report of the meeting of Working Party 6A (Geneva, 17-25 April 2018) � Chairman, WP 6A 2018-04-26
[ 386 ]
Final list of participants Working Party 6A (Geneva, 17-25 April 2018) � Director, BR 2018-04-25
[ 385 ]
Liaison statement to ITU-R Working Parties 6B and 6A - Use of Artificial Intelligence (AI) for Broadcasting � WP 6C 2018-04-23
[ 384 ]
Liaison statement to ITU-R Working Party 6B (and Working Party 6A for information) - An element of reply liaison statement to ITU-R Working Party 5D � WP 6C 2018-04-23
[ 383 ]
Liaison statement on ITU Inter-Sector coordination on lead SG activities � ITU-T SG 15 2018-04-17
[ 382 ]
List of documents issued (Document 6A/316 (carried over from the last WP 6A meeting) and Documents 6A/318 - 6A/382) � BR Study Groups Department 2018-04-16
[ 381 ]
Measurements of IMT base station activity � Broadcast Networks Europe 2018-04-10
[ 380 ]
Calculating the probability of interference to DTTB services when Monte-Carlo simulations do not include time � Broadcast Networks Europe 2018-04-10
[ 379 ]
Report on recent developments concerning PLT systems and general EMC-related interference issues (Question ITU-R 221/1) � Rapp. on PLT and general EMC-related Q221/1 2018-04-10
[ 378 ]
Activity Report and draft liaison statement to Working Party 3K � Chairman, CG on MER 2018-04-09
[ 377 ]
Working document towards a new Report ITU-R BT.[BEYOND1stGEN] - Guidance for implementing beyond 1st generation DTTB systems and methods for evaluation of their quality of service performance requirements � Free TV Australia Ltd. Q132/6 2018-04-10
[ 376 ]
Proposed revision to the working document towards a preliminary draft new Report ITU-R BT.[B3BCPARAM] - Characteristics of digital terrestrial broadcasting systems in the frequency band [174-230] MHz for frequency sharing/interference analyses � Brazil (Federative Republic of) 2018-04-09
[ 375 ]
Proposed revision to the working document towards a preliminary draft new Report ITU-R BT.[DTTPLANNINGCAC] - Technical criteria for DTT planning in Central American and Caribbean Region � Brazil (Federative Republic of) 2018-04-09
[ 374 ]
Revisions to the working document towards a preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting � Digital Radio Mondiale 2018-04-09
[ 373 ]
Laboratory test for RF synchronization based DTMB SFN � China (People's Republic of) Q136/6 2018-04-09
[ 372 ]
Preliminary draft revision of Report ITU-R BT.2140-10 - Transition from analogue to digital terrestrial broadcasting � China (People's Republic of) Q136/6 2018-04-09
[ 371 ]
Report to Working Party 6A - Guidance for implementing beyond 1st generation DTTB systems and methods for their quality of service performance requirements and evaluation � CG [BEYOND1stGEN] 2018-04-09
[ 370 ]
(Rev.1)
Use of MER to assess impact of anomalous propagation on co-channel interference � Free TV Australia Ltd. 2018-04-09
[ 369 ]
Rapporteur's Report on new terms and definitions � Rapporteur on Terminology, SG 6 2018-04-09
[ 368 ]
(Rev.1)
Progress Report WRC-19 agenda items 1.1, 1.3, 1.6, 1.7, 1.10, 1.11, 1.12, 1.13, 1.15 and 9.1, issues 9.1.2 and 9.1.6 � RG for WRC-19 related studies AI9.1, AI1.7, AI1.6, AI1.3, AI1.15, AI1.13, AI1.12, AI1.11, AI1.10, AI1.1 2018-04-09
[ 367 ]
Request for new Rapporteur Group - Modifications and additions to the 2016 edition of the "Handbook on digital television broadcasting networks and system implementation" � United States of America 2018-04-06
[ 366 ]
Proposed revision of Recommendation ITU-R BS.1660 - Technical basis for planning of terrestrial digital sound broadcasting in the VHF band � United States of America 2018-04-06
[ 365 ]
Proposed revision of Report ITU-R BS.2214 - Planning parameters for terrestrial digital sound broadcasting systems in VHF bands � United States of America 2018-04-06
[ 364 ]
For information - The ATSC 3.0 digital transmission standard � United States of America 2018-04-06
[ 363 ]
Studies in response to Resolution ITU-R 59-1 on frequency bands and tuning ranges for ENG use � United States of America 2018-04-06
[ 362 ]
Information on LF and MF broadcasting transmitters subject to impact for WPT � European Broadcasting Union 2018-04-06
[ 361 ]
Proposed reply liaison statement to Working Party 1A on consideration of working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � European Broadcasting Union 2018-04-06
[ 360 ]
Proposed reply liaison statement to ITU-R Working Party 5D on revision of Report ITU-R M.2373 - Audio-visual capabilities and applications supported by terrestrial IMT systems � Japan 2018-04-05
[ 359 ]
Proposed draft new Question ITU-R [AI4BC]/6 - Use of Artificial Intelligence (AI) for Broadcasting � Iran (Islamic Republic of) , Japan , United Kingdom of Great Britain and Northern Ireland 2018-04-05
[ 358 ]
Proposed revision of working document towards a preliminary draft new Report ITU-R BT.[ADVBROADCAST] � Japan Q133/6 2018-04-05
[ 357 ]
Proposed revision of Report ITU-R BT.2344-1 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting � Japan 2018-04-05
[ 356 ]
Field tests of digital terrestrial sound and multimedia broadcasting system RAVIS � Russian Federation Q56/6, Q45/6 2018-04-05
[ 355 ]
+Add.1
Report on recent developments on WPT under issue 9.1.6 of WRC-19 - Urgent considerations regarding development of the CPM text on issue 9.1.6 of WRC-19 � Rapp. on WPT Issues AI9.1 2018-04-05
[ 354 ]
Proposed revision of Report ITU-R BT.2343-2 - Collection of field trials of UHDTV over DTT networks � Korea (Republic of) Q133/6 2018-04-04
[ 353 ]
Revision of Resolution 641 (Rev.HFBC-87) and Resolution 647(Rev.WRC-15) proposed by Study Group 6 � Director, BR 2018-04-04
[ 352 ]
Use of MER to assess impact of anomalous propagations on co-channel interferences � Rai Way S.p.A. 2018-03-27
[ 351 ]
Liaison statement on request for information on ITU-D and ITU-R activities on deployment of digital (terrestrial) television in developing countries � ITU-T SG 9 2018-03-23
[ 350 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 4A AI1.10 2018-03-21
[ 349 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2 � WP 4A AI9.1 2018-03-21
[ 348 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15) � WP 4A AI1.6 2018-03-21
[ 347 ]
Report of the eighth meeting of IR-IBB (Geneva, 26 January 2018) � Co-Chair, IRG-IBB 2018-03-13
[ 346 ]
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz � SG 5 2018-03-06
[ 345 ]
Liaison statement on ITU inter-Sector coordination � ITU-T (TSAG) 2018-03-05
[ 344 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS � WP 4B 2018-02-23
[ 343 ]
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS � WP 4A 2018-02-20
[ 342 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems � WP 4C 2018-02-20
[ 341 ]
Liaison statement to Working Parties 6A, 6B, 6C - Draft revision of Report ITU-R M.2373 � WP 5D 2018-02-13
[ 340 ]
Reply liaison statement to Working Party 4A (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2 � WP 5D AI9.1 2018-02-13
Resultados :589 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2021-01-19