Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 19 ]
�
� |
Proposed preliminary draft new Recommendation [HAPS-EESS] - Methodology for the impact evaluation of uplink transmission in the fixed service using high altitude platform stations (HAPS) in the Earth exploration-satellite service (EESS)..
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 18 ]
�
� |
Proposed preliminary draft new Recommendation [HAPS-IB] - Methodology for impact evaluation and operational procedure of the fixed service using high altitude platform stations (HAPS) for frequency sharing with other co-primary ...
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 17 ]
�
� |
Proposed preliminary draft new Recommendation [HAPS-MT] - Interference mitigation techniques and their advantages for systems using high altitude platform station (HAPS) in the frequency range 18-32 GHz
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 16 ]
�
� |
Proposed preliminary draft new Recommendation [KA-HAPS] - Technical and operational characteristics for the fixed service using high-altitude platform stations in the bands 27.5-28.35 GHz and 31.0-31.3 GHz
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 15 ]
�
� |
Proposal for a Recommendation on a frequency channel arrangement for digital radio-relay systems operating in the frequency band 406.1 to 450 MHz
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 14 ]
�
� |
Consideration of deployment scenarios of IMT-2000 networks
�
� |
Germany (Federal Republic of)
� |
� |
2001-10-01 |
|
[ 13 ]
�
� |
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
�
� |
France
� |
� |
2001-10-01 |
|
[ 12 ]
�
� |
Questions identified as suitable for approval by the alternative procedure according to Resolution ITU-R 45
�
� |
Chairman, SG 9
� |
� |
2001-10-01 |
|
[ 11 ]
�
� |
Recommendations to be brought to the attention of Study Group 9 Working Parties
�
� |
Chairman, SG 9
� |
� |
2001-10-01 |
|
[ 10 ]
�
+Add.1� |
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
�
� |
Chairman, WP 9B
� |
� |
2001-10-01 |
|
[ 9 ]
�
� |
Questions to be brought to the attention of Study Group 9 Working Parties
�
� |
Chairman, SG 9
� |
� |
2001-10-01 |
|
[ 8 ]
�
� |
Updating of certain maintained Recommendations in Sections 9B and 9C
�
� |
Chairman, WP 9B
� |
� |
2001-10-01 |
|
[ 7 ]
�
� |
Liaison statement to WPs 4-9S and 9B - Interference analysis from High Altitude Platform Stations to passive sensors in the band 31.3-31.8 GHz
�
� |
WP 7C
� |
� |
2001-10-01 |
|
[ 6 ]
�
+Add.1� |
Additional report to the next Working Party 9B meeting (18-26 September 2000)
�
� |
Chairmen, WPs 4-9S, 9A, 9B, 9C and 9D
� |
� |
2001-10-01 |
|
[ 5 ]
�
� |
Liaison statement from Working Party 3M to Working Party 9B concerning propagation aspects relating to Resolutions 726 and 133 (WRC-97)
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 4 ]
�
� |
Liaison statement from WP 3M to WP 9B and WP 4-9S Concerning - Rec. ITU-R F.1500 - Preferred characteristics of systems in the fixed service using hihg altitude platform operating in the bands 47.2-47.5 GHz and 47.9-48.2 GHz
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 3 ]
�
� |
Principal Rapporteurs, JRG 8A-9B - Report of the seventh meeting (Geneva, 13-17 March 2000)
�
� |
JRG 8A-9B
� |
� |
2001-10-01 |
|
[ 2 ]
�
� |
Liaison statement to ITU-T Study Groups 4, 6, 9, 11, 12, 13 and ITU-R Study Groups 4, 8 and 9
�
� |
ITU-T SG 15 (WP 1/15)
� |
� |
2001-10-01 |
|
[ 1 ]
�
� |
Documents to be carried forward to the next study period (2000-2002)
�
� |
BR Secretariat
� |
� |
2001-10-01 |
Resultados :219 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):