International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 240 ]
Explanation of Time Selector Block in G.8273.2 Functional Model � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 239 ]
Network limit and HRM hops of G.8271.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 238 ]
HRM2 SyncE transients of G.8271.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 237 ]
Clock Classes for G.8275.1 and T-BC/T-TSC Models � Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 236 ]
Proposed text in G.MDSP � China Unicom , Huawei Technologies Co. Ltd. Q9/15 2013-06-17
[ 235 ]
APS Behavior in 1-stage ODU SMP Proposal � Huawei Technologies Co. Ltd. , Infinera Corporation Q9/15 2013-06-17
[ 234 ]
Discussion about Single Failure and its Potential Affect in ODU SMP � Huawei Technologies Co. Ltd. , Infinera Corporation Q9/15 2013-06-17
[ 233 ]
Proposed description for the alternative OSNR measurement method in G.697 � Huawei Technologies Co. Ltd. Q6/15 2013-06-17
[ 232 ]
Proposal on adding bandwidth degradation message in Y.1731 � Huawei Technologies Co. Ltd. Q10/15 2013-06-17
[ 231 ]
Measurement results of spectral excursion for 100G applications in G.698.2 � Huawei Technologies Co. Ltd. Q6/15 2013-06-17
[ 230 ]
Consideration on the service protection of an MD-ROADM in G.672 � Huawei Technologies Co. Ltd. Q7/15 2013-06-17
[ 229 ]
Analysis of Supporting External Commands in ODU SMP � Huawei Technologies Co. Ltd. Q9/15 2013-06-17
[ 228 ]
Extension of OTN hybrid equipment � China Mobile Communications Corporation , China Unicom , Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 227 ]
Enhancements of OTN hybrid equipment � China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. Q11/15, Q10/15 2013-06-17
[ 226 ]
Multilayer protocol stack of OTN interface � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 225 ]
Comparison of OTU4Cn vs OTUCn � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 224 ]
Beyond 100G use case and design considerations � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 223 ]
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN) � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q9/15, Q6/15, Q14/15, Q12/15, Q11/15 2013-06-17
[ 222 ]
Multi-carrier OCh signal and connection behaviour under optical layer faults � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 221 ]
Improving Power Saving Efficiency � China Telecommunications Corporation , Sigma Designs Israel S.D.I Ltd. , ZTE Corporation Q18/15 2013-06-17
[ 220 ]
OTM-1 multi vendor IaDI management capability requirements � Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 219 ]
Proposal to add a description of a multi-carrier OCh for the transport of an OTUk � Huawei Technologies Co. Ltd. Q14/15, Q11/15 2013-06-17
[ 218 ]
The APS command exercise is not optional � Huawei Technologies Co. Ltd. Q3/15 2013-06-17
[ 217 ]
Use of BIP monitors behind a HD or SD FEC process � Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 216 ]
Block diagram example of n x OTU4 and OTUCn framer � Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 215 ]
Beyond 100G tributary slot structure considerations � Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 214 ]
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function � Huawei Technologies Co. Ltd. Q11/15, Q10/15 2013-06-17
[ 213 ]
Status update for ODU SMP � ZTE Corporation Q9/15 2013-06-17
[ 212 ]
The Coordination and Transformation of Time and Frequency Information of G.8273.2 T-BC Network Element � China Unicom Q13/15 2013-06-17
[ 211 ]
Relationship between networks PDV cumulative thresholds and 1pps performance in ITU-T Rec. G.8271.1 � China Unicom Q13/15 2013-06-17
[ 210 ]
Propose about messaging behaviour of boundary clock in Multicast/Unicast network � China Unicom Q13/15 2013-06-17
[ 209 ]
Further clarification about application scenarios of new Metro DWDM � China Unicom , China Telecom , Ericsson , Fiberhome , Nokia Siemens Networks Q6/15 2013-06-17
[ 208 ]
Consideration on optical layer protection � China Unicom , Fiberhome , Nokia Siemens Networks Q9/15 2013-06-17
[ 207 ]
Proposal to add time related EVM parameters in G.698.2 � China Unicom , Fiberhome Q6/15 2013-06-17
[ 206 ]
Proposal for adding skew parameters for 100Gbit/s DP-QPSK modulation format in G.698.2 � China Unicom , Calnex Q6/15 2013-06-17
[ 205 ]
Architecture and APS communication for per-leaf protection in MECP � Korea (Rep. of) Q9/15 2013-06-17
[ 204 ]
Proposal to modify clause 7.1.2 for an Amendment to G.8113.1 � Korea (Rep. of) Q10/15 2013-06-17
[ 203 ]
Proposal to start a new recommendation G.cwdm-msch (Multichannel CWDM applications with multi sub-channel optical interfaces) � Korea (Rep. of) Q6/15 2013-06-17
[ 202 ]
MECP per-tree protection - root node initiated protection � Korea (Rep. of) Q9/15 2013-06-17
[ 201 ]
Proposal for a study item of automatic discovery for multi-layer/multi-technology converged transport networks and SDN � Korea (Rep. of) Q12/15 2013-06-17
[ 200 ]
Prysmian Group proposals for revision of Recommendation G.652 � Prysmian SpA Q5/15 2013-06-17
[ 199 ]
(Rev.1)
G.fast: Initialization � Broadcom Corporation , Futurewei Technologies US R&D Center Q4/15 2013-06-17
[ 198 ]
G.hs,G.fast::Additional carrier sets for G.fast � ZTE Corporation Q4/15 2013-06-17
[ 197 ]
(Rev.1)
G.fast: Fast OLR proposal. � Broadcom Corporation Q4/15 2013-06-17
[ 196 ]
(Rev.1)
G.fast:. Improved On Line Reconfiguration for precoder update � Broadcom Corporation Q4/15 2013-06-17
[ 195 ]
(Rev.1)
G.fast: RMC framing and impact on OLR. � Broadcom Corporation Q4/15 2013-06-17
[ 194 ]
(Rev.1)
G.vdsl: Low power mode. � Broadcom Corporation Q4/15 2013-06-17
[ 193 ]
Working document towards a draft Supplement on Radio-over-Fiber (RoF) technologies and their applications � National Institute of Information and Communications Technology Q2/15 2013-06-17
[ 192 ]
L.oxcon "outdoor optical cross connect cabinet � Ministry of Industry and Information Technology (MIIT) Q16/15 2013-06-17
[ 191 ]
More information about "Field Mountable optical fibre Connector" � Ministry of Industry and Information Technology (MIIT) Q7/15 2013-06-17
Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26