Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2190 ]
�
� |
Definition of Signal Degrade in packet networks
�
� |
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
� |
Q9/15, Q14/15, Q10/15
� |
2012-08-27 |
|
[ 2189 ]
�
� |
New recommendation structure for G.9955 and G.9956
�
� |
ERDF
,
NXP Semiconductors
,
STMicroelectronics
� |
Q4C/15
� |
2012-08-27 |
|
[ 2188 ]
�
� |
Implementation Procedure of DCN Management for G.7710
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2012-08-27 |
|
[ 2187 ]
�
� |
MI Grouping Packages for G.8152
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2012-08-27 |
|
[ 2186 ]
�
� |
Mapping of G.8152 Atomic Functions and UML Model Artifacts
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2012-08-27 |
|
[ 2185 ]
�
� |
OTN Linear Protection Function Modelling for G.874.1
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2012-08-27 |
|
[ 2184 ]
�
� |
G.874.1 UML Model
�
� |
Ericsson, Inc.
� |
Q14/15
� |
2012-08-27 |
|
[ 2183 ]
�
� |
Future revision to ITU-T Recommendation G.652 (add G.652E category)
�
� |
Corning Incorporated
� |
Q5/15
� |
2012-08-27 |
|
[ 2182 ]
�
� |
Standardization of optical fibre cable networks security issues from the perspective of maintenance
�
� |
TELEKOMUNIKACJA POLSKA S.A.
� |
Q17/15
� |
2012-08-27 |
|
[ 2181 ]
�
� |
Proposal of optical connector endface visual specifications requirement for cost effective network operation of optical systems
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q7/15
� |
2012-08-27 |
|
[ 2180 ]
�
� |
Multilayer protocol stack of OTN interface
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2012-08-27 |
|
[ 2179 ]
�
(Rev.1)� |
Consideration on multiplex structure, timeslot granularity and client mapping in next ODU/OTU signals
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2012-08-27 |
|
[ 2178 ]
�
� |
Considerations on flexible OTU frame structures
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2012-08-27 |
|
[ 2177 ]
�
� |
Extension of OTN hybrid equipment
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2012-08-27 |
|
[ 2176 ]
�
� |
Living List of G.epon
�
Withdrawn: Reposted as TD817/WP1
� |
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/15
� |
2012-08-27 |
|
[ 2175 ]
�
� |
Proposal to add ring architecture in G.698.3
�
� |
LG-Ericsson
� |
Q6/15
� |
2012-08-27 |
|
[ 2174 ]
�
� |
RIN for 2.5 Gbps application in G.698.3
�
� |
LG-Ericsson
� |
Q6/15
� |
2012-08-27 |
|
[ 2173 ]
�
� |
Draft document of G.epon
�
Withdrawn: Reposted as TD817/WP1
� |
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q2/15
� |
2012-08-27 |
|
[ 2172 ]
�
� |
Time sync architecture based on multiple PTP domains
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2171 ]
�
� |
Hold-off time and interactions between frequency and phase-time planes
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2170 ]
�
� |
A possible solution for multiple GMs and operator intervention
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2169 ]
�
� |
Sync OAM architecture and requirements
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2168 ]
�
� |
Further analysis about BMCA of time profile
�
� |
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2167 ]
�
� |
The mapping between ToD and PTP
�
� |
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2166 ]
�
� |
Requirements for Signal Degrade in packet networks
�
� |
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
� |
Q9/15, Q10/15
� |
2012-08-27 |
|
[ 2165 ]
�
� |
Further results of an alternative method for measuring in-band OSNR in G.697
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2012-08-27 |
|
[ 2164 ]
�
� |
Proposal for modulation format for 100 Gbit/s applications in G.698.2
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2012-08-27 |
|
[ 2163 ]
�
� |
Considerations and suggestions on revision of draft recommendation G.rmon
�
� |
Huawei Technologies Co. Ltd.
� |
Q7/15
� |
2012-08-27 |
|
[ 2162 ]
�
� |
Clarification of UNI in G.8112
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2012-08-27 |
|
[ 2161 ]
�
� |
The Multiplexing mapping principles of MPLS-TP in G8112
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2012-08-27 |
|
[ 2160 ]
�
� |
Proposed alignment of G.8112 with latest version of G.709
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2012-08-27 |
|
[ 2159 ]
�
� |
Addition of orthogonal-band-multiplexed Orthogonal frequency-division multiplexing (OBM OFDM) as one of the line coding schemes in section 7 of G.Sup39
�
� |
FiberHome Technologies Group
� |
Q6/15
� |
2012-08-27 |
|
[ 2158 ]
�
(Rev.1)� |
To accelerate research on M-OTN equipment type in G798.1
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
� |
Q9/15
� |
2012-08-27 |
|
[ 2157 ]
�
(Rev.1)� |
Considerations on next steps beyond 100 Gbit/s applications
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q6/15, Q12/15, Q11/15
� |
2012-08-27 |
|
[ 2156 ]
�
� |
The clrification about multipoint to point transport network services in G798.1
�
� |
China Unicom
,
FiberHome Technologies Group
� |
Q9/15
� |
2012-08-27 |
|
[ 2155 ]
�
� |
Analysis of interactive mechanism between two layers
�
� |
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2154 ]
�
� |
The Clarification of EOTN in G798.1,G8012.1 and G 8021.1
�
� |
China Unicom
,
FiberHome Technologies Group
� |
Q9/15
� |
2012-08-27 |
|
[ 2153 ]
�
� |
Proposed the resolution to Editor's note and some comments on G.8012.1
�
� |
Fujitsu Limited
� |
Q10/15
� |
2012-08-27 |
|
[ 2152 ]
�
� |
Proposed terminologies for ETH PM
�
� |
Fujitsu Limited
� |
Q9/15, Q14/15, Q10/15
� |
2012-08-27 |
|
[ 2151 ]
�
� |
Consideration on aSSF input for AIS insertion in G.8121
�
� |
Fujitsu Limited
� |
Q9/15
� |
2012-08-27 |
|
[ 2150 ]
�
� |
Proposed update to G.8121 Appendix I
�
� |
Fujitsu Limited
� |
Q9/15
� |
2012-08-27 |
|
[ 2149 ]
�
� |
Comments on ODU SMP
�
� |
Fujitsu Limited
� |
Q9/15
� |
2012-08-27 |
|
[ 2148 ]
�
� |
Proposal of the architectures for MPLS-TP linear protection
�
� |
Fujitsu Limited
� |
Q9/15
� |
2012-08-27 |
|
[ 2147 ]
�
� |
Comments on G.8021.1
�
� |
Fujitsu Limited
� |
Q9/15
� |
2012-08-27 |
|
[ 2146 ]
�
(Rev.1)� |
Proposal to modify relationships between classes in class diagram for OTN Entities
�
� |
ZTE Corporation
� |
Q14/15
� |
2012-08-27 |
|
[ 2145 ]
�
� |
Proposal for updated Table 7-1 in G.806
�
� |
Fujitsu Limited
� |
Q9/15
� |
2012-08-27 |
|
[ 2144 ]
�
� |
Proposed text for the guidance to performance measurement by ETH OAM
�
� |
Fujitsu Limited
,
NEC Corporation
� |
Q9/15, Q14/15, Q10/15
� |
2012-08-27 |
|
[ 2143 ]
�
� |
G.8273: Test methodology annex/appendix
�
� |
Calnex Solutions Limited
,
Deutsche Telekom AG
� |
Q13/15
� |
2012-08-27 |
|
[ 2142 ]
�
(Rev.1)� |
Proposal to extend the index n of OPSn in the text of next revision of G.874.1
�
� |
ZTE Corporation
� |
Q14/15, Q12/15, Q11/15
� |
2012-08-27 |
|
[ 2141 ]
�
(Rev.1)� |
Proposal to add some mapping between G.798 OTN atomic functions and UML model artifacts in the table 7-1of next revision of G.874.1
�
� |
ZTE Corporation
� |
Q14/15
� |
2012-08-27 |
Results:452 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):