Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 147 ]
�
� |
Proposed changes of P.NAMS ToR for the IPTV Application Area
�
� |
Deutsche Telekom AG
� |
Q14/12
� |
2010-09-06 |
|
[ 146 ]
�
� |
Ericsson participation in P.OLQA characterization
�
� |
Ericsson AB
� |
Q9/12
� |
2010-09-06 |
|
[ 145 ]
�
� |
P.OLQA validation cross check results
�
� |
Ericsson AB
� |
Q9/12
� |
2010-09-06 |
|
[ 144 ]
�
� |
Comments and Proposal on P.OLQA Standardization
�
� |
Qualcomm Inc.
� |
Q9/12
� |
2010-09-06 |
|
[ 143 ]
�
� |
Draft Requirement Specification for P.AMD (Perceptual Approaches for Multi-Dimensional Analysis)
�
� |
Deutsche Telekom AG
� |
Q9/12
� |
2010-09-06 |
|
[ 142 ]
�
� |
Proposed study items for the POLQA characterization phase
�
� |
Ascom (Switzerland) Ltd.
� |
Q9/12
� |
2010-09-03 |
|
[ 141 ]
�
� |
Stable Draft of New Recommendation P.863
�
� |
OPTICOM
,
SwissQual
,
TNO
� |
Q9/12
� |
2010-09-02 |
|
[ 140 ]
�
� |
Playout buffer events as performance parameters
�
� |
France Telecom Orange
� |
Q17/12, Q13/12
� |
2010-05-10 |
|
[ 139 ]
�
� |
Comments on Recommendation Y.1221
�
� |
France Telecom Orange
� |
Q11/12
� |
2010-05-10 |
|
[ 138 ]
�
� |
Bitrate measurement and traffic characterisation
�
� |
France Telecom Orange
� |
Q17/12, Q11/12
� |
2010-05-10 |
|
[ 137 ]
�
� |
Updated Draft Terms of Reference (ToR) for P.NBAMS
�
� |
Ericsson
� |
Q14/12
� |
2010-05-10 |
|
[ 136 ]
�
� |
Comments on P.OLQA cross-check results
�
� |
Psytechnics Ltd
� |
Q9/12
� |
2010-05-10 |
|
[ 135 ]
�
� |
Subjective Databases Required for P.NAMS Standardisation
�
� |
Deutsche Telekom Labs
,
Ericsson Research
,
Psytechnics Ltd
� |
Q14/12
� |
2010-05-10 |
|
[ 134 ]
�
� |
Proposal on update text for G.RQAM - Reference guide to QoE assessment methodologies
�
� |
Brazil
� |
Q13/12
� |
2010-05-07 |
|
[ 133 ]
�
� |
Proposed performance criteria for P.OLQA model re-calibration
�
� |
OPTICOM
,
SwissQual
,
TNO
� |
Q9/12
� |
2010-05-07 |
|
[ 132 ]
�
� |
Phase 4 modelling with Y.1540 Appendix VII: Performance parameters for stream repair techniques
�
� |
AT&T
� |
Q17/12, Q14/12, Q13/12
� |
2010-05-07 |
|
[ 131 ]
�
� |
QoS mapping and interworking between Ethernet, IP and MPLS
�
� |
Deutsche Telekom
� |
Q17/12
� |
2010-05-07 |
|
[ 130 ]
�
� |
Y.1541 Class 0 IPDV Requirements and G.114 Appendix III
�
� |
Telekom Austria
� |
Q17/12, Q11/12, Q10/12
� |
2010-05-07 |
|
[ 129 ]
�
� |
Proposal for clarifying the scope of Y.1542
�
� |
KDDI, Japan
� |
Q11/12
� |
2010-05-07 |
|
[ 128 ]
�
� |
P.OLQA technologies
�
� |
Psytechnics Ltd
� |
Q9/12
� |
2010-05-07 |
|
[ 127 ]
�
� |
Progress update on Psytechnics' P.OLQA model
�
� |
Psytechnics Ltd
� |
Q9/12
� |
2010-05-07 |
|
[ 126 ]
�
� |
Proposal for initial Q.16 work item
�
� |
Psytechnics Ltd
� |
Q16/12
� |
2010-05-07 |
|
[ 125 ]
�
� |
Proposed new Question on conferencing and telemeeting assessment
�
� |
Germany
,
Sweden
� |
Q1/12
� |
2010-05-07 |
|
[ 124 ]
�
� |
Extending the E-model to better capture terminal effects
�
� |
Deutsche Telekom AG
,
Head Acoustics GmbH
� |
Q8/12
� |
2010-05-07 |
|
[ 123 ]
�
� |
Consideration of send-side ambient noise in the E-model
�
� |
Deutsche Telekom AG
� |
Q8/12
� |
2010-05-07 |
|
[ 122 ]
�
� |
Extending Suppl. 24 to P-Series towards multimodal systems and services
�
� |
Deutsche Telekom AG
� |
Q7/12, Q1/12
� |
2010-05-07 |
|
[ 121 ]
�
� |
Position towards a perceptual dimension analysis
�
� |
Detusche Telekom AG
,
France Telecom Orange
� |
Q9/12, Q16/12
� |
2010-05-07 |
|
[ 120 ]
�
+Add.1� |
First draft listening WB E-model
�
� |
Deutsche Telekom AG
� |
Q8/12
� |
2010-05-07 |
|
[ 119 ]
�
� |
Towards a Super-wideband E-model
�
� |
Deutsche Telekom AG
� |
Q8/12
� |
2010-05-07 |
|
[ 118 ]
�
� |
Subjective quality evaluation of audio streaming applications: ACR vs. MUSHRA
�
� |
Deutsche Telekom AG
� |
Q14/12, Q13/12
� |
2010-05-07 |
|
[ 117 ]
�
� |
Announcement of OPTICOM, SwissQual and TNO to submit a joint P.OLQA model
�
� |
OPTICOM
,
SwissQual
,
TNO
� |
Q9/12
� |
2010-05-07 |
|
[ 116 ]
�
� |
Corrigendum: SwissQual's P.OLQA Candidate Model
�
� |
SwissQual AG
� |
Q9/12
� |
2010-05-07 |
|
[ 115 ]
�
� |
Clarification of process to incorporate new applications in Y.1541
�
� |
AT&T
,
NTT Corporation
� |
Q17/12
� |
2010-05-07 |
|
[ 114 ]
�
� |
Typical example of PC-based delay measurement inaccuracy
�
� |
NTT Corporation
� |
Q17/12
� |
2010-05-07 |
|
[ 113 ]
�
� |
Correction for Y.1221
�
� |
NTT Corporation
� |
Q11/12
� |
2010-05-07 |
|
[ 112 ]
�
� |
Some aspects related to P.OLQA standard
�
� |
Ascom Network Testing
� |
Q9/12
� |
2010-05-07 |
|
[ 111 ]
�
� |
Universal Headset/Headphone Interface Solution for Wireless Digital Terminals
�
� |
MIIT China
� |
Q4/12, Q3/12
� |
2010-05-07 |
|
[ 110 ]
�
� |
Revision of ITU-T P.341
�
� |
MIIT China
� |
Q3/12
� |
2010-05-07 |
|
[ 109 ]
�
� |
Revision of ITU-T P.311
�
� |
MIIT China
� |
Q3/12
� |
2010-05-07 |
|
[ 108 ]
�
� |
Why SG12 must standardize only one model for the future P.OLQA standard
�
� |
France Telecom Orange
,
AT&T
,
Deutsche Telekom
,
Huawei Technologies
� |
Q9/12
� |
2010-05-07 |
|
[ 107 ]
�
� |
Automated double talk analysis procedure
�
� |
HEAD Acoustics GmbH
� |
Q6/12, Q4/12
� |
2010-05-04 |
|
[ 106 ]
�
� |
Specification of Acoustical Interfaces (Artificial Ears, Artificial Mouths) for Super-Wideband Testing
�
� |
Deutsche Telekom Labs
,
HEAD Acoustics GmbH
� |
Q7/12, Q5/12
� |
2010-05-04 |
|
[ 105 ]
�
� |
Proposal to launch the study of the end-user requirements for quality assurance and assessment for video streaming services
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/12
� |
2010-05-04 |
|
[ 104 ]
�
� |
Universal German speech sample for use in objective and subjective test applications
�
� |
Deutsche Telekom AG
,
SwissQual AG
� |
Q9/12, Q7/12, Q6/12
� |
2010-05-04 |
|
[ 103 ]
�
� |
Requirements for wideband terminals
�
� |
France Telecom Orange
� |
Q3/12
� |
2010-04-30 |
|
[ 102 ]
�
� |
Performance comparisons of subjective quality assessment methods
�
� |
NTT, Japan
� |
Q14/12
� |
2010-04-30 |
|
[ 101 ]
�
� |
Investigation of IPTV services
�
� |
NTT, Japan
� |
Q14/12
� |
2010-04-30 |
|
[ 100 ]
�
� |
Handling of error recovery schemes in P.NAMS and P.NBAMS projects
�
� |
NTT, Japan
� |
Q14/12
� |
2010-04-30 |
|
[ 99 ]
�
� |
Packet loss and coding impact on quality of synthesized speech predicted by PESQ and P.563 models
�
� |
Ministry PTT, Slovakia
� |
Q9/12
� |
2010-04-30 |
|
[ 98 ]
�
� |
Updates to P.862.3 on the Usage Scenarios for EVRC Family Codecs
�
� |
Qualcomm Inc.
� |
Q9/12, Q7/12
� |
2009-10-26 |
Results:347 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):