International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A.AR : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A.AR� C�

ITU-R�WP4A.AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:911 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 711 ]
Workplan for WRC-27 agenda item 1.2 � Ghana , Nigeria (Federal Republic of) AI1.2 2024-04-18
[ 710 ]
Proposed liaison statement to contributing Working Parties OF WRC-27 agenda item 1.2 � Ghana , Nigeria (Federal Republic of) 2024-04-18
[ 709 ]
Prioritization of work related to non-WRC-27 agenda item � Indonesia (Republic of) 2024-04-18
[ 708 ]
Information document on U.S. Domestic Regulations and Policies regarding the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services � United States of America 2024-04-18
[ 707 ]
Additional issue to address in the next revision of Recommendation ITU-R S.1503-4 � United States of America 2024-04-18
[ 706 ]
Proposed draft reply liaison statement to Working Party 7D regarding WRC-27 agenda item 1.16 � United States of America AI1.16 2024-04-18
[ 705 ]
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � United States of America 2024-04-18
[ 704 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies � United States of America 2024-04-18
[ 703 ]
Draft liaison statement to Working Parties 5A, 5C, 7C and 7D (copy to Working Party 3M) -WRC-27 agenda item 1.3 � United States of America AI1.3 2024-04-18
[ 702 ]
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space) � United States of America AI1.3 2024-04-18
[ 701 ]
Proposed draft reply liaison statement to Working Party 7C - Relevant technical information for sharing studies under WRC-27 agenda item 1.19 � United States of America AI1.19 2024-04-18
[ 700 ]
Proposed draft reply liaison statement to Working Party 5D - Relevant technical information for sharing studies under WRC-27 agenda item 1.7 � United States of America AI1.7 2024-04-18
[ 699 ]
Potential Handbook outline on best practices for sustainable use of radio frequency spectrum and associated orbits [HANDBOOK SPACE SUSTAINABILITY] � United States of America 2024-04-18
[ 698 ]
Update to Report ITU-R S.2515-0 � United States of America 2024-04-18
[ 697 ]
Further work to study the alpha-table methodology and its use in Recommendation ITU-R S.1503 � United Kingdom of Great Britain and Northern Ireland 2024-04-17
[ 696 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to enhance protection and sustainable development of Broadcasting Satellite Service in Regions 1 and 3 Plan band by addressing the significant discrepancies between service area and coverage area of networks operating as Region 2 Fixed Satellite Service in the frequency band 11.7-12.2 GHz � Iran (Islamic Republic of) AI7 2024-04-17
[ 695 ]
Proposed input on elements of the reply liaison statement to Working Party 7D on WRC-27 agenda item 1.16 � South Africa (Republic of) AI1.16 2024-04-17
[ 694 ]
Proposed structure for the draft Report on RR Article 22 epfd limits � Luxembourg 2024-04-17
[ 693 ]
Proposed liaison statement and Working Party 4A workplan regarding WRC-27 agenda item 1.1 � Luxembourg AI1.1 2024-04-17
[ 692 ]
Proposed parameters regarding ESIMS to be used for studies under WRC-27 agenda item 1.1 � Luxembourg AI1.1 2024-04-17
[ 691 ]
Comparison of current GSO links in Ku band with links used for the epfd derivation � Luxembourg 2024-04-17
[ 690 ]
Proposed annex to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] � China (People's Republic of) 2024-04-17
[ 689 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] � China (People's Republic of) 2024-04-17
[ 688 ]
Proposed studies on Resolution 35 (Rev.WRC-23) � China (People's Republic of) 2024-04-17
[ 687 ]
Proposed topic to be considered under WRC-23 agenda item 7 - To develop possible regulatory measures to implement RR No. 4.4 � China (People's Republic of) AI7 2024-04-17
[ 686 ]
A proposed questionnaire on the current status and future plan of FSS satellite networks/systems in the Q/V band for WRC-27 agenda item 1.6 � China (People's Republic of) AI1.6 2024-04-17
[ 685 ]
Consideration on the preparations for WRC-27 agenda item 1.5 � China (People's Republic of) AI1.5 2024-04-17
[ 684 ]
Proposal on working document towards a preliminary draft new Report ITU-R S.[SHARING AND COMPATIBILITY STUDIES ON FSS/BSS IN 17.3-17.7/17.8 GHZ FOR R3] - WRC-27 agenda item 1.4 � China (People's Republic of) AI1.4 2024-04-17
[ 683 ]
Considerations on preparations for WRC-27 agenda item 1.3 � China (People's Republic of) AI1.3 2024-04-17
[ 682 ]
Proposal on the studies under WRC-27 agenda item 1.2 � China (People's Republic of) AI1.2 2024-04-17
[ 681 ]
Proposed draft liaison statements to contributing Working Parties regarding WRC-27 agenda item 1.1 � China (People's Republic of) AI1.1 2024-04-17
[ 680 ]
Working document towards a preliminary draft new Report [STUDIES OF ARTICLE 22 MECHANISM] � Burundi (Republic of) , Cameroon (Republic of) , Central African Republic , Chad (Republic of) , Congo (Republic of) , Equatorial Guinea (Republic of) , Gabonese Republic , Sao Tome and Principe (Democratic Republic of) 2024-04-17
[ 679 ]
MEO earth station parameters for studies to be conducted under WRC-27 agenda item 1.3 � SES AI1.3 2024-04-16
[ 678 ]
Amendments to working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] � Samoa (Independent State of) 2024-04-12
[ 677 ]
Workplan for WRC-27 agenda item 1.1 � Germany (Federal Republic of) AI1.1 2024-04-12
[ 676 ]
Proposed Working document on WRC-27 agenda item 1.1 � Germany (Federal Republic of) AI1.1 2024-04-12
[ 675 ]
Proposed liaison statement to contributing Working Parties of WRC-27 agenda item 1.1 � Germany (Federal Republic of) AI1.1 2024-04-12
[ 674 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � Russian Federation 2024-04-11
[ 673 ]
Preliminary materials to support the study under WRC-27 agenda item 1.5 � Kazakhstan (Republic of) , Russian Federation AI1.5 2024-04-11
[ 672 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time � Korea (Republic of) AI7 2024-04-11
[ 671 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to limit the practice of introducing a completely different orbital plane for non-geostationary-satellite systems that is not foreseen to be required for operation of the constellation � Korea (Republic of) AI7 2024-04-11
[ 670 ]
Working document towards preliminary draft revision to Report ITU-R BO.2029 � Japan 2024-04-10
[ 669 ]
Provisions to be possibly reviewed under WRC-27 agenda item 1.4 � Japan AI1.4 2024-04-10
[ 668 ]
Preliminary position on WRC-27 agenda � WMO 2024-03-06
[ 667 ]
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] � OneWeb 2023-06-20
[ 666 ]
Working document towards a draft new Report on Article 22 epfd limits issues [EPFD_LIMITS_ISSUES] - Analysis of the issues related to Article 22 epfd limits � Tonga (Kingdom of) , Ecuador 2023-06-20
[ 665 ]
Working document towards a preliminary draft new Report on WRC-23 agenda item 7, Topic A � Tonga (Kingdom of) , Lithuania (Republic of) AI7A 2023-06-20
[ 664 ]
Working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] - Studies on the pfd scaling factor to be applied to non-GSO FSS constellations with 1 000 or more space stations operating in the 17.7-19.3 GHz band � Tonga (Kingdom of) 2023-06-20
[ 663 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Focus on Worst-Case Geometry - Reasons why there is no need to modify S.1503 to introduce testing at geometries other than the Worst-Case Geometry � Tonga (Kingdom of) 2023-06-20
[ 662 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Focus on Alpha Tables - Analysis of the ability of the current Alpha Tables algorithm to closely match typical satellite selection strategies and maximize efficient use of spectrum � Tonga (Kingdom of) 2023-06-20
Results:911 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-19