International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP3J : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP3J� C�

ITU-R�WP3J

Propagation Fundamentals

Results:275 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 75 ]
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15 � WP 5A 2016-11-18
[ 74 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15 � WP 5A 2016-11-18
[ 73 ]
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 3J, 3K, 3M, 4A, 4C, 5B and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16 � WP 5C 2016-11-16
[ 72 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 4A 2016-11-02
[ 71 ]
Reply liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M for information) - WRC-19 agenda item 1.13 � WP 7C AI1.13 2016-11-02
[ 70 ]
Revision of Recommendation ITU-R SM.1448 based on Recommendation ITU-R P.620 � ATDI 2016-10-24
[ 69 ]
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration � ITU-D SG 2 2016-10-24
[ 68 ]
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-10-17
[ 67 ]
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 4A 2016-10-06
[ 66 ]
Information document on the updated tentative meeting schedule of Study Group 3 and its Working Parties � Chairman, SG 3 2016-08-12
[ 65 ]
+Ann.09(Rev.1)
Report on the meeting of Working Party 3J (Geneva, 20-29 June 2016) � Chairman, WP 3J 2016-07-04
[ 64 ]
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-06-30
[ 63 ]
Final list of participants - Working Party 3J (Geneva, 20-29 June 2016) � Director, BR 2016-06-30
[ 62 ]
Documents to be considered in Working Party 3J � Chairman, WP 3J 2016-06-21
[ 61 ]
Proposed revision to Recommendation ITU-R P.1812-4 - Smooth path diffraction loss �
WP 3K agreed that Document 3K/65 should also be assigned to WP 3J.
LS telcom AG 2016-06-20
[ 60 ]
(Rev.1)
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D � WP 5D 2016-06-20
[ 59 ]
List of documents issued (Documents 3J/1 - 3J/59) � BR Study Groups Department 2016-06-17
[ 58 ]
Rain rate distributions from stations with long-term measurements in Norway � Telenor ASA 2016-06-13
[ 57 ]
Update of Recommendation ITU-R P.452 (copy to Working Parties 3K and 3J for information) � Intel Corporation 2016-06-13
[ 56 ]
A conversion model of annual statistics to worst-month statistics for troposcatter � China (People's Republic of) 2016-06-12
[ 55 ]
Draft work plan and draft liaison statement to Task Group 5/1 to support agenda item 1.13 sharing studies � United States of America AI1.13 2016-06-13
[ 54 ]
Satellite measurement data at 20 GHz from high latitude locations in Inland and maritime climates � Telenor ASA 2016-06-13
[ 53 ]
Use of experimental drop size distributions for rain attenuation prediction � Spain 2016-06-13
[ 52 ]
Atmospheric depolarization on slant paths, modelling of ice effects, comparison with new Ka band measurements in Portugal � Portugal , European Space Agency 2016-06-13
[ 51 ]
Proposed revision to Recommendation ITU-R P.[BEL] - Proposed building entry loss model up to 40 GHz in urban environment � Japan 211/3 2016-06-13
[ 50 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 1A 2016-06-13
[ 49 ]
Proposed revision of Recommendation ITU-R P.618-12 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics: Additional test results for rain attenuation model based on the new test protocol � Korea (Republic of) 2016-06-13
[ 48 ]
Working document toward a preliminary draft revision of Report ITU-R P.2346-0 � United States of America 2016-06-13
[ 47 ]
Update of Recommendation ITU-R P.1238 (copy to Working Groups 3M and 3J for information) � Intel Corporation 2016-06-13
[ 46 ]
Proposed update of Recommendation ITU-R P.676-10 - "Attenuation by atmospheric gases" � Luxembourg , Italy 2016-06-13
[ 45 ]
Working document toward a preliminary draft revision to Recommendation ITU-R P.2040-1 � United States of America 2016-06-13
[ 44 ]
Report on activity of the Correspondence Group - Building entry loss � CG 3J-3K-3M-8 2016-06-13
[ 43 ]
Building entry loss - Measurements in a large urban office � United Kingdom of Great Britain and Northern Ireland 2016-06-13
[ 42 ]
Contribution to ITU-R Study Group 3 databanks - Statistics of rain cell characteristics parameters derived from a meteorological radar in complex terrain � Austria 2016-06-12
[ 41 ]
Supporting document for improvement for refractivity data in Recommendation ITU-R P.453-10 - Analysis on statistical distribution of surface and elevated ducts worldwide � China (People's Republic of) 2016-06-12
[ 40 ]
Proposed modification to Recommendation ITU-R P.834-6 - A modification to minimum trapping frequency � China (People's Republic of) 2016-06-12
[ 39 ]
China _ 2012 model improvement and additional analysis with other rain attenuation prediction models proposed to Recommendation ITU-R P.618 and ITU-R P.530 � China (People's Republic of) 2016-06-12
[ 38 ]
Building entry loss measurement results for above 6 GHz frequency band � China (People's Republic of) 2016-06-12
[ 37 ]
Measurements results of building entry loss in the 2 GHz to 60 GHz frequency range � Telefon AB - LM Ericsson 2016-06-11
[ 36 ]
Progressing the working document towards a preliminary draft new Recommendation ITU-R P.[BEL] "Prediction of Building Entry Loss" � Telefon AB - LM Ericsson 2016-06-11
[ 35 ]
Discussion paper: building entry loss - Statistics, modelling and MM-wave measurements � United Kingdom of Great Britain and Northern Ireland 2016-06-10
[ 34 ]
Proposed revision to Recommendation ITU-R P.1407-5 - Multipath propagation and parametrization of its characteristics - Directional multipath parameters � United Kingdom of Great Britain and Northern Ireland 2016-06-10
[ 33 ]
Contribution to the study of Question ITU-R 201-5/3 - Temporal rain fade trends � United Kingdom of Great Britain and Northern Ireland 201-5/3 2016-06-13
[ 32 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-13
[ 31 ]
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-13
[ 30 ]
Working document toward draft new Recommendation for the prediction of array combining losses due to atmospheric phase scintillation � United States of America 2016-06-10
[ 29 ]
Working document towards a draft revision to Recommendation ITU-R P.453-11 � United States of America 2016-06-13
[ 28 ]
Working document toward a draft revision of Recommendation ITU-R P.527-3 � United States of America 2016-06-13
[ 27 ]
Request for clarification of Recommendation ITU-R 834-7 � United States of America 2016-06-13
[ 26 ]
Proposed draft revision to Recommendation ITU-R P.676-10 � United States of America 2016-06-13
Results:275 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-04