Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 75 ]
�
� |
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15
�
� |
WP 5A
� |
� |
2016-11-18 |
|
[ 74 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15
�
� |
WP 5A
� |
� |
2016-11-18 |
|
[ 73 ]
�
� |
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 3J, 3K, 3M, 4A, 4C, 5B and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 72 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 4A
� |
� |
2016-11-02 |
|
[ 71 ]
�
� |
Reply liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M for information) - WRC-19 agenda item 1.13
�
� |
WP 7C
� |
AI1.13
� |
2016-11-02 |
|
[ 70 ]
�
� |
Revision of Recommendation ITU-R SM.1448 based on Recommendation ITU-R P.620
�
� |
ATDI
� |
� |
2016-10-24 |
|
[ 69 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 68 ]
�
� |
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-10-17 |
|
[ 67 ]
�
� |
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 4A
� |
� |
2016-10-06 |
|
[ 66 ]
�
� |
Information document on the updated tentative meeting schedule of Study Group 3 and its Working Parties
�
� |
Chairman, SG 3
� |
� |
2016-08-12 |
|
[ 65 ]
�
+Ann.09(Rev.1)� |
Report on the meeting of Working Party 3J (Geneva, 20-29 June 2016)
�
� |
Chairman, WP 3J
� |
� |
2016-07-04 |
|
[ 64 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-06-30 |
|
[ 63 ]
�
� |
Final list of participants - Working Party 3J (Geneva, 20-29 June 2016)
�
� |
Director, BR
� |
� |
2016-06-30 |
|
[ 62 ]
�
� |
Documents to be considered in Working Party 3J
�
� |
Chairman, WP 3J
� |
� |
2016-06-21 |
|
[ 61 ]
�
� |
Proposed revision to Recommendation ITU-R P.1812-4 - Smooth path diffraction loss
�
WP 3K agreed that Document 3K/65 should also be assigned to WP 3J.
� |
LS telcom AG
� |
� |
2016-06-20 |
|
[ 60 ]
�
(Rev.1)� |
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D
�
� |
WP 5D
� |
� |
2016-06-20 |
|
[ 59 ]
�
� |
List of documents issued (Documents 3J/1 - 3J/59)
�
� |
BR Study Groups Department
� |
� |
2016-06-17 |
|
[ 58 ]
�
� |
Rain rate distributions from stations with long-term measurements in Norway
�
� |
Telenor ASA
� |
� |
2016-06-13 |
|
[ 57 ]
�
� |
Update of Recommendation ITU-R P.452 (copy to Working Parties 3K and 3J for information)
�
� |
Intel Corporation
� |
� |
2016-06-13 |
|
[ 56 ]
�
� |
A conversion model of annual statistics to worst-month statistics for troposcatter
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 55 ]
�
� |
Draft work plan and draft liaison statement to Task Group 5/1 to support agenda item 1.13 sharing studies
�
� |
United States of America
� |
AI1.13
� |
2016-06-13 |
|
[ 54 ]
�
� |
Satellite measurement data at 20 GHz from high latitude locations in Inland and maritime climates
�
� |
Telenor ASA
� |
� |
2016-06-13 |
|
[ 53 ]
�
� |
Use of experimental drop size distributions for rain attenuation prediction
�
� |
Spain
� |
� |
2016-06-13 |
|
[ 52 ]
�
� |
Atmospheric depolarization on slant paths, modelling of ice effects, comparison with new Ka band measurements in Portugal
�
� |
Portugal
,
European Space Agency
� |
� |
2016-06-13 |
|
[ 51 ]
�
� |
Proposed revision to Recommendation ITU-R P.[BEL] - Proposed building entry loss model up to 40 GHz in urban environment
�
� |
Japan
� |
211/3
� |
2016-06-13 |
|
[ 50 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 1A
� |
� |
2016-06-13 |
|
[ 49 ]
�
� |
Proposed revision of Recommendation ITU-R P.618-12 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics: Additional test results for rain attenuation model based on the new test protocol
�
� |
Korea (Republic of)
� |
� |
2016-06-13 |
|
[ 48 ]
�
� |
Working document toward a preliminary draft revision of Report ITU-R P.2346-0
�
� |
United States of America
� |
� |
2016-06-13 |
|
[ 47 ]
�
� |
Update of Recommendation ITU-R P.1238 (copy to Working Groups 3M and 3J for information)
�
� |
Intel Corporation
� |
� |
2016-06-13 |
|
[ 46 ]
�
� |
Proposed update of Recommendation ITU-R P.676-10 - "Attenuation by atmospheric gases"
�
� |
Luxembourg
,
Italy
� |
� |
2016-06-13 |
|
[ 45 ]
�
� |
Working document toward a preliminary draft revision to Recommendation ITU-R P.2040-1
�
� |
United States of America
� |
� |
2016-06-13 |
|
[ 44 ]
�
� |
Report on activity of the Correspondence Group - Building entry loss
�
� |
CG 3J-3K-3M-8
� |
� |
2016-06-13 |
|
[ 43 ]
�
� |
Building entry loss - Measurements in a large urban office
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2016-06-13 |
|
[ 42 ]
�
� |
Contribution to ITU-R Study Group 3 databanks - Statistics of rain cell characteristics parameters derived from a meteorological radar in complex terrain
�
� |
Austria
� |
� |
2016-06-12 |
|
[ 41 ]
�
� |
Supporting document for improvement for refractivity data in Recommendation ITU-R P.453-10 - Analysis on statistical distribution of surface and elevated ducts worldwide
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 40 ]
�
� |
Proposed modification to Recommendation ITU-R P.834-6 - A modification to minimum trapping frequency
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 39 ]
�
� |
China _ 2012 model improvement and additional analysis with other rain attenuation prediction models proposed to Recommendation ITU-R P.618 and ITU-R P.530
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 38 ]
�
� |
Building entry loss measurement results for above 6 GHz frequency band
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 37 ]
�
� |
Measurements results of building entry loss in the 2 GHz to 60 GHz frequency range
�
� |
Telefon AB - LM Ericsson
� |
� |
2016-06-11 |
|
[ 36 ]
�
� |
Progressing the working document towards a preliminary draft new Recommendation ITU-R P.[BEL] "Prediction of Building Entry Loss"
�
� |
Telefon AB - LM Ericsson
� |
� |
2016-06-11 |
|
[ 35 ]
�
� |
Discussion paper: building entry loss - Statistics, modelling and MM-wave measurements
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2016-06-10 |
|
[ 34 ]
�
� |
Proposed revision to Recommendation ITU-R P.1407-5 - Multipath propagation and parametrization of its characteristics - Directional multipath parameters
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2016-06-10 |
|
[ 33 ]
�
� |
Contribution to the study of Question ITU-R 201-5/3 - Temporal rain fade trends
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
201-5/3
� |
2016-06-13 |
|
[ 32 ]
�
� |
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2016-06-13 |
|
[ 31 ]
�
� |
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2016-06-13 |
|
[ 30 ]
�
� |
Working document toward draft new Recommendation for the prediction of array combining losses due to atmospheric phase scintillation
�
� |
United States of America
� |
� |
2016-06-10 |
|
[ 29 ]
�
� |
Working document towards a draft revision to Recommendation ITU-R P.453-11
�
� |
United States of America
� |
� |
2016-06-13 |
|
[ 28 ]
�
� |
Working document toward a draft revision of Recommendation ITU-R P.527-3
�
� |
United States of America
� |
� |
2016-06-13 |
|
[ 27 ]
�
� |
Request for clarification of Recommendation ITU-R 834-7
�
� |
United States of America
� |
� |
2016-06-13 |
|
[ 26 ]
�
� |
Proposed draft revision to Recommendation ITU-R P.676-10
�
� |
United States of America
� |
� |
2016-06-13 |
Results:275 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):