International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum Management Methodologies and Economic Strategies

Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 183 ]
Revised draft final Report for WTDC Resolution 9 (Rev. Dubai, 2014) � United States of America 2017-06-06
[ 182 ]
(Rev.1)Corr.1
Report on WTDC-14 Resolution 9 (Rev. DUBAI, 2014) - Proposed revised text for the Report � Germany (Federal Republic of) , Argentine Republic , Armenia (Republic of) , Burkina Faso , Cambodia (Kingdom of) , China (People's Republic of) , C�te d'Ivoire (Republic of) , Djibouti (Republic of) , Dominican Republic , Egypt (Arab Republic of) , France , Kenya (Republic of) , Kuwait (State of) , Lebanon , Morocco (Kingdom of) , New Zealand , Oman (Sultanate of) , Papua New Guinea , Paraguay (Republic of) , Russian Federation , Rwanda (Republic of) , Samoa (Independent State of) , Saudi Arabia (Kingdom of) , Senegal (Republic of) , South Africa (Republic of) , Sudan (Republic of the) , United Arab Emirates , Uruguay (Eastern Republic of) , Viet Nam (Socialist Republic of) , Zimbabwe (Republic of) 2017-06-06
[ 181 ]
Preliminary draft revision of Report ITU-R SM.2303-1 - Wireless power transmission using technologies other than radio frequency beam � European Broadcasting Union 2017-06-06
[ 180 ]
Work in standards developing organizations relating to Wireless Power Transfer (WPT) under issue 9.1.6 of WRC-19 - Comments to ETSI/ERM on draft standard EN 303 147 � European Broadcasting Union 2017-06-06
[ 179 ]
Work in standards developing organizations relating to Wireless Power Transfer (WPT) under issue 9.1.6 of WRC-19 - Comments to CISPR/B on CISPR/B/673/DC � European Broadcasting Union 2017-06-06
[ 178 ]
Proposal for ITU-R to write to CISPR on wireless power transmission activities � Netherlands (Kingdom of the) , United Kingdom of Great Britain and Northern Ireland 2017-06-06
[ 177 ]
Information may be inferred from submitted respond to Working Party 1B questionnaire in the context of the studies for agenda item 9.1 issue 9.1.7 � Egypt (Arab Republic of) AI9.1 2017-06-06
[ 176 ]
Proposed modification of preliminary draft revision of Report ITU-R SM.2303-1 � Korea (Republic of) Q210/1 2017-06-06
[ 175 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] � Colombia (Republic of) 2017-06-06
[ 174 ]
Revision proposal of Report ITU-R SM.2303 to update information regarding the studies on the impact of wireless power transmission for electric vehicles � Japan Q210/1 2017-06-05
[ 173 ]
Proposed draft CPM text for WRC-19 agenda item 9.1, issue 9.1.7 � United States of America AI9.1 2017-06-05
[ 172 ]
Proposed modification to the text for the working document towards a PDNR for WRC-19 agenda item 9.1, issue 9.1.7 � United States of America AI9.1 2017-06-05
[ 171 ]
Liaison statement to Working Parties 1B and 5D - Working document towards a preliminary draft new Report ITU-R M.[IOT/M2M_USAGE] - Technical and operational aspects of Internet of Things and Machine-to-Machine applications by systems in the Mobile Service (excluding IMT) - WRC-19 agenda item 9.1, issue 9.1.8 � WP 5A AI9.1 2017-06-05
[ 170 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 5A 2017-06-05
[ 169 ]
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B and 5B) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 5A 2017-06-05
[ 168 ]
Reply liaison statement to ITU-R Working Party 1B - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 5A 2017-06-05
[ 167 ]
Reply liaison statement to Working Party 1A and 1B (copied for information to Working Parties 5A and 5C) - Wireless power transmission � WP 5B 2017-06-05
[ 166 ]
Low power wide area networks for the internet of things in shared spectrum � France 2017-06-02
[ 165 ]
The research of IOT spectrum demand in terahertz frequency band � China (People's Republic of) 2017-06-02
[ 164 ]
Suggestions for revision of ITU-R Report SM.2015 methods for determining national long-terms strategies for spectrum utilization � Russian Federation Q205/1 2017-06-02
[ 163 ]
Proposals to working document towards a preliminary draft new Report on studies for WRC-19 agenda item 9.1, issue 9.1.7 � Russian Federation AI9.1 2017-06-02
[ 162 ]
Liaison statement to ITU-R Working Party 1A - Proposal of a new Report ITU-R SM.[WPT.WIDE-BEAM-IMPACTS] "Impact study and human hazard issues for wireless power transmission via radio frequency wide-beam" � Director, BR 2017-06-02
[ 161 ]
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)] � China (People's Republic of) 2017-06-02
[ 160 ]
Annex 16 to Working Party 1B Chairman's Report - Working document towards a preliminary draft revision of Recommendation ITU-R SM.1046-2 - Definition of spectrum use and efficiency of a radio system � China (People's Republic of) 2017-06-02
[ 159 ]
Draft proposal for a new ITU-R Question - Evaluation Method of Spectrum Utilization � China (People's Republic of) 2017-06-02
[ 158 ]
The draft proposal on the revision of "Working document towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS]" � China (People's Republic of) Q208/1 2017-06-02
[ 157 ]
Modification of preliminary draft revision of Recommendation ITU-R SM.1046-2 � China (People's Republic of) 2017-06-02
[ 156 ]
Proposed modification of the working document towards a preliminary draft modification of Report ITU-R SM.2153-5 � Korea (Republic of) 2017-06-02
[ 155 ]
Proposed modification of the working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] � Korea (Republic of) 2017-06-02
[ 154 ]
Revision of working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � ATDI 2017-06-01
[ 153 ]
Report to Working Party 1B of the Correspondence Group - Questionnaire relating to the operation of earth station terminals in the context of studies under WRC-19 agenda item 9.1, issue 9.1.7 (Res. 958 (WRC-15) Annex item 2) � Chairman, WP 1B CG on Questionnaire on 9.1.7 AI9.1 2017-05-31
[ 152 ]
Liaison statement to Working Party 1A on WPT activities � International Electrotechnical Commission 2017-05-30
[ 151 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy for information to Working Parties 4C, 5A, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 4A 2017-05-19
[ 150 ]
Liaison Statement from ITU-D Study Group 1 and the ITU-D/ITU-R Joint Group on WTDC Resolution 9 to ITU-R Working Parties 1B, 1C, 5A and 5D on the Report on WTDC Resolution 9 � ITU-D SG 1, ITU-R/ITU-T JG on WTDC Res.9 2017-05-18
[ 149 ]
Liaison statement from TDAG to RAG and ITU-R Study Groups 1 and 5 on cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014) � TDAG 2017-05-18
[ 148 ]
Correspondence received- Questionnaire relating to the operation of ubiquitously deployed earth station terminals in the context of studies under WRC-19 agenda item 9.1, issue 9.1.7 � Director, BR 2017-05-17
[ 147 ]
Information on requests of application of RR No.18.1 with respect to any unauthorized uplink from Earth stations terminals in the context of studies under WRC-19 agenda item 9.1, issue 9.1.7 � Director, BR AI9.1 2017-05-16
[ 146 ]
Clarification of some terms used for WPT studies under WRC-19 agenda item 9.1, issue 9.1.6 � Netherlands (Kingdom of the) AI9.1 2017-05-15
[ 145 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (Copy to Working Parties 4A, 5A, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 4C 2017-05-04
[ 144 ]
Liaison statement to TDAG (copy to ITU-R Study Group 1 and to ITU-R Working Parties 5A and 5D for information) - Cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014) � Radiocommunication Advisory Group (RAG) 2017-05-01
[ 143 ]
Liaison statement to ITU-R Working Parties 1A and 1B (copy to RG-WPT) - AWG Study on Question ITU-R 210-3/1 "Wireless power transmission" � Asia-Pacific Telecommunity 2017-04-20
[ 142 ]
Liaison statement to ITU-R Working Party 1B - AWG Studies related to CRS � Asia-Pacific Telecommunity 2017-04-20
[ 141 ]
Liaison statement to ITU-R Working Party 1B - AWG activities related to Short-Range Devices � Asia-Pacific Telecommunity 2017-04-20
[ 140 ]
Liaison statement on principles of transparency, non discrimination, cost-orientation and efficient development of international networks � ITU-T-T SG 3 2017-04-21
[ 139 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A and Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 � WP 7B 2017-04-07
[ 138 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services � WP 7D 2017-04-07
[ 137 ]
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7A for information) - Studies on "Wireless power transmission (WPT)" � WP 7D AI9.1 2017-04-07
[ 136 ]
+Ann.1
Additional information on the preparation of text for the draft CPM Report to WRC-19 � Director, BR 2017-04-04
[ 135 ]
Liaison statement to Working Parties 1A and 1B, and to their Rapporteur Group on WPT issues, to Working Party 5B, and to the Study Group 1 Rapporteur Group on liaison with CISPR and Rapporteur to CISPR on WPT issues (copy for information to Working Parties 5A, 5C, 7A & 7D) - Liaison between ITU-R and CISPR � WP 6A 2017-04-03
[ 134 ]
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19 � WP 6A Q210/1 2017-04-03
Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16