Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 33 ]
�
� |
List of documents issued (Documents 1/1 - 1/33)
�
� |
BR Study Groups Department
� |
� |
2016-06-09 |
|
[ 32 ]
�
� |
Executive Report of the meeting of Working Party 1B (Geneva, 2-9 June 2016)
�
� |
Acting Chairman, WP 1B
� |
� |
2016-06-09 |
|
[ 31 ]
�
� |
Executive Report of the meeting of Working Party 1A (Geneva, 2-9 June 2016)
�
� |
Acting Chairman, WP 1A
� |
� |
2016-06-09 |
|
[ 30 ]
�
(Rev.1)� |
Draft editorial modification to Report ITU-R SM.2153-5 - Technical and operating parameters and spectrum requirements for short-range devices
�
� |
WP 1B
� |
� |
2016-06-09 |
|
[ 29 ]
�
� |
Executive Report to Study Group 1
�
� |
Chairman, WP 1C
� |
� |
2016-06-09 |
|
[ 28 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site accuracy measurements of a fixed DF system
�
� |
WP 1C
� |
� |
2016-06-08 |
|
[ 27 ]
�
� |
Draft liaison statement from Study Group 1 to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO: fundamental safety principles for protection against non-ionizing radiation
�
� |
WP 1B
� |
� |
2016-06-08 |
|
[ 26 ]
�
(Rev.1)� |
Report ITU-R SM.2351-0 - Smart grid utility management systems
�
� |
WP 1A
� |
� |
2016-06-08 |
|
[ 25 ]
�
(Rev.1)� |
Draft new Report ITU-R SM.[WPT-BEAM-APPLICATIONS] - Applications of wireless power transmission via radio frequency beam - Report ITU-R SM.2392-0
�
� |
WP 1A
� |
210-3/1
� |
2016-06-08 |
|
[ 24 ]
�
(Rev.1)� |
Draft editorial modifications of Recommendation ITU-R SM.326-7, Recommendation ITU-R SM.328-11, Recommendation ITU-R SM.1446, Recommendation ITU-R SM.1879-2 and Report ITU-R SM.2158-3
�
� |
WP 1A
� |
� |
2016-06-08 |
|
[ 23 ]
�
(Rev.1)� |
Draft modification of Report ITU-R SM.2256-0 - Spectrum occupancy measurements and evaluation
�
� |
WP 1C
� |
� |
2016-06-08 |
|
[ 22 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SM.[INDOOR RADIO ENVIRONMENT] - Methods for measurements of indoor radio environment
�
� |
WP 1C
� |
� |
2016-06-08 |
|
[ 21 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SM.[DF_SENSITIVITY] - Test procedure for measuring direction finder sensitivity in the VHF/UHF frequency range
�
� |
WP 1C
� |
� |
2016-06-08 |
|
[ 20 ]
�
(Rev.1)� |
Draft new Question ITU-R [EMF MEASUREMENTS]/1 - Electromagnetic field measurements to assess human exposure
�
� |
WP 1C
� |
� |
2016-06-08 |
|
[ 19 ]
�
(Rev.1)� |
Draft new Report ITU-R SM.[WIND_FARMS] - Investigating the effects of wind turbines on fixed radio direction finders - Report ITU-R SM.2391-0
�
� |
WP 1C
� |
� |
2016-06-08 |
|
[ 18 ]
�
(Rev.1)� |
Draft revision of Report ITU-R SM.2012-4 - Economic aspects of spectrum management
�
� |
WP 1B
� |
� |
2016-06-08 |
|
[ 17 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-06-06 |
|
[ 16 ]
�
� |
Report on CISPR activities June 2015 to May 2016
�
� |
Rapporteur, SG 1 RG on Liaison with CISPR
� |
� |
2016-06-01 |
|
[ 15 ]
�
� |
Liaison statement to ITU-R Study Groups 1 and 6 - Terminology relating to the transition from analogue to digital radio technologies
�
� |
CCV and SCV
� |
� |
2016-05-31 |
|
[ 14 ]
�
� |
RF human exposure - WHO: Fundamental safety principles for protection against non-ionizing radiation
�
� |
ATDI
� |
� |
2016-05-26 |
|
[ 13 ]
�
� |
Attendance Report of CISPR meeting
�
� |
Liaison Rapporteur with CISPR on WPT
� |
� |
2016-05-12 |
|
[ 12 ]
�
� |
Liaison statement on the progress of ongoing work on WTDC Resolution 9 (Rev.Dubai, 2014) during the ITU-D study period 2014-2017
�
� |
ITU-R/ITU-D JG on WTDC Res.9
� |
� |
2016-04-25 |
|
[ 11 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties
�
� |
Chairman, CCV
� |
� |
2016-04-01 |
|
[ 10 ]
�
� |
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans
�
� |
ITU-T SG 15
� |
� |
2016-03-08 |
|
[ 9 ]
�
� |
Liaison statement on the latest versions of the Home Network Transport (HNT) - Standards overview and workplan
�
� |
ITU-T SG 15
� |
� |
2016-03-08 |
|
[ 8 ]
�
� |
Liaison statement on the latest versions of the Access Network Transport (ANT) - Standards overview and workplan
�
� |
ITU-T SG 15
� |
� |
2016-03-08 |
|
[ 7 ]
�
� |
Terminology in the field transition from analogue to digital radio technology
�
� |
Russian Federation
� |
� |
2016-02-26 |
|
[ 6 ]
�
� |
Liaison statement on ITU inter-Sector coordination [to ISCT, TDAG, ITU-D SGs, RAG, ITU-R SGs, ITU-T SGs]
�
� |
ITU-T TSAG
� |
� |
2016-02-09 |
|
[ 5 ]
�
� |
Liaison statement on new ITU-T SG 20
�
� |
ITU-T SG 20
� |
� |
2015-12-15 |
|
[ 4 ]
�
� |
Liaison statement on comments to the ICNIRP documents
�
� |
ITU-T SG 5
� |
� |
2015-12-15 |
|
[ 3 ]
�
� |
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria", Chapter 2: "Sources, measurements and exposures" and Chapter 3: "Radiofrequency Electromagnetic Fields Inside The Body"
�
� |
ITU-T SG 5
� |
� |
2015-12-15 |
|
[ 2 ]
�
� |
Documents to be carried over from the 2012-2015 study period
�
� |
SG 1
� |
� |
2015-12-11 |
|
[ 1 ]
�
(Rev.4)� |
Assignment of texts to the Study Group 1 Sub-Groups
�
� |
Chairman, SG 1
� |
� |
2015-11-26 |
Results:233 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5
� |
Multiple Document Download:�Formats and Languages to be included (when available):