International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 481 ]
Liaison statement to Working Party 4A - Additional studies for WRC-15 agenda item 1.9.1 � WP 7B 2014-05-14
[ 480 ]
Liaison statement to Working Party 4A - Draft CPM text for agenda items 1.6.1 and 1.6.2 � WP 7B 2014-05-14
[ 479 ]
Liaison statement to Working Party 4A - Clarification of the definition of space research service (deep space) in Radio Regulations � WP 7B 2014-05-14
[ 478 ]
Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and other antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz � SG 5 2014-04-30
[ 477 ]
Report ITU-R BT.2049-6 - Broadcasting of multimedia and data applications for mobile reception � SG 6 2014-04-30
[ 476 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D, ITU-T Study Group 15 Question 1 and ITU-T Study Group 13 Question 15 - Access technology for broadband telecommunications including IMT, for developing countries � ITU-D SG 2 2014-04-29
[ 475 ]
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D) � World Meteorological Organization 2014-04-28
[ 474 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worldwide broadcasting roaming � WP 6A 2014-04-11
[ 473 ]
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10 � WP 4C 2014-03-24
[ 472 ]
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2 � WP 4C 2014-03-24
[ 471 ]
Liaison statement to Working Party 1B (copy to Working Party 4A for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities � WP 4C 2014-03-10
[ 470 ]
Liaison statement to Working Party 1B (copy to Working Party 4A for information) - WRC-15 agenda item 9.1, issue 9.1.6 � WP 4C 2014-03-10
[ 469 ]
Liaison statement to Working Party 5B (copy to Working Party 4A) - Summary of generic unwanted emission characteristics found in (1) Recommendation ITU-R M.1580/81 (IMT-2000) and (2) preliminary draft new Recommendation ITU-R M.[IMT.OOBE X] (IMT-Advanced) � WP 5D 2014-02-28
[ 468 ]
+Ann.1-39
Report on the meeting of Working Party 4A (Geneva, 5-13 February 2014) � Chairman, WP 4A 2014-02-19
[ 467 ]
(Rev.1)
Final List of Participants - Working Party 4A (Geneva, 5-13 February 2014) � Director, BR 2014-02-13
[ 466 ]
List of documents issued (Documents 4A/343 - 4A/466) � BR Study Groups Department 2014-02-04
[ 465 ]
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3 � United States of America 2014-01-29
[ 464 ]
Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1 � United States of America 2014-01-29
[ 463 ]
Draft CPM text for WRC-15 agenda item 1.6 � United States of America 2014-01-29
[ 462 ]
Revision of preliminary draft new Report ITU-R S.[R2R3.FSS] � United States of America 2014-01-29
[ 461 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station � WP 1B 2014-01-30
[ 460 ]
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5D, 7B, 7C, 7D and CCV - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities � WP 1B 2014-01-30
[ 459 ]
Preliminary draft new Recommendation ITU-R S.[GSO FSS E/S 29.5-30.0/19.7-20.2 GHz] - Technical and operational guidelines for earth stations on mobile platforms communicating with geostationary space stations in the fixed-satellite service in the bands 19.7-20.2 GHz and 29.5-30.0 GHz � United Kingdom of Great Britain and Northern Ireland 2014-01-29
[ 458 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B � Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , United Kingdom of Great Britain and Northern Ireland 2014-01-29
[ 457 ]
Revisions to draft CPM text for agenda items 1.6.1 and 1.6.2 � Luxembourg 2014-01-29
[ 456 ]
Preliminary draft new Recommendation ITU-R BO.[ALT_BSS_ANT_DIAG] - Alternative BSS earth station antenna radiation pattern for 12 GHz band � Luxembourg 280/4 2014-01-29
[ 455 ]
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Compatibility studies related to the band 13.25-13.75 GHz between EESS (active) / SRS and FSS (E-s) � Luxembourg 2014-01-29
[ 454 ]
Preliminary draft new Recommendation ITU-R BO.[ALT_BSS_ANT_DIAG] - Alternative BSS earth station antenna radiation pattern for 12 GHz band � France 280/4 2014-01-29
[ 453 ]
Proposed modifications to draft CPM text on WRC-15 agenda item 9.1, issue 9.1.5 � France 2014-01-29
[ 452 ]
Proposed modifications to the draft CPM text on WRC-15 agenda item 7 - Possible cancellation of advance publication mechanism for satellite networks subject to coordination under Section II of Article 9 of the Radio Regulations (Issue [E]) � France 2014-01-29
[ 451 ]
Working document - Draft CPM text on WRC-15 agenda item 1.9.1 � France 2014-01-29
[ 450 ]
Consideration on earth station antenna sizes in the 8 400-8 500 MHz band � France 2014-01-29
[ 449 ]
Compatibility between proposed FSS emissions and SRS in the band 7 150-7 235 MHz � France 2014-01-29
[ 448 ]
Proposed revisions to draft CPM text on WRC-15 agenda item 1.8 � France 2014-01-29
[ 447 ]
Proposed modifications to draft CPM text on WRC-15 agenda item 1.7 � France 2014-01-29
[ 446 ]
Revision to Annex 10 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1 � France 2014-01-29
[ 445 ]
Proposed modifications to the draft CPM text on WRC-15 agenda item 9.1, issue 9.1.5 � Germany (Federal Republic of) 2014-01-29
[ 444 ]
Proposed changes to the draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2 � Telenor ASA 2014-01-29
[ 443 ]
WRC-15 agenda item 1.6.1/1.6.2 - Consideration of the band 14.5 - 14.8 GHz � Eutelsat S.A. 2014-01-29
[ 442 ]
Working document - Draft CPM text on WRC-15 agenda item 7 � European Space Agency 2014-01-29
[ 441 ]
Proposals toward draft CPM text on WRC-15 agenda item 7 (issue B) � Russian Federation 2014-01-29
[ 440 ]
Proposals towards draft CPM Report under WRC-15 agenda item 1.6.1 � Russian Federation 2014-01-29
[ 439 ]
Working document - [Some elements of a] working document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations � Russian Federation 2014-01-29
[ 438 ]
Working document - Draft CPM text on WRC-15 agenda item 1.8 � Russian Federation 2014-01-29
[ 437 ]
Proposals toward draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2 � Russian Federation 2014-01-29
[ 436 ]
Sharing studies of the fixed satellite service (space-to-Earth) with the radiodetermination service in the frequency band 13.4-13.75 GHz � Russian Federation 2014-01-29
[ 435 ]
Estimation of sharing feasibility of the fixed-satellite (space-to-Earth) and fixed services in the 7 GHz band � Russian Federation 2014-01-29
[ 434 ]
Sharing studies of the fixed satellite service (space-Earth) with the fixed service in the frequency band 13.4-13.75 GHz � Russian Federation 2014-01-29
[ 433 ]
Sharing studies of the fixed service with the fixed satellite service (space-to-Earth) in the frequency range 7 GHz � Russian Federation 2014-01-29
[ 432 ]
Off-shore distance for earth stations on board vessels (ESVS) in the 6 GHz band on WRC-15 agenda item 1.8 � Iran (Islamic Republic of) 2014-01-29
Results:681 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-11-16