International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP3M : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP3M� C�

ITU-R�WP3M

Point-to-point and Earth-space propagation

Results:257 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 57 ]
Liaison statement to Joint Task Group 4-5-6-7 - Sharing parameters for WRC-15 Agenda item 1.2 � WP 5D 2012-10-16
[ 56 ]
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1 � WP 5D 2012-10-16
[ 55 ]
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1 � WP 5D 2012-10-16
[ 54 ]
Liaison statement to Working Party 5B (copy to Working Parties 3M, 4C and 5A) - WRC-15 Agenda item 1.7 � WP 4A 2012-10-05
[ 53 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) -WRC-15 Agenda item 1.6 � WP 4A 2012-10-05
[ 52 ]
Liaison statement to Working Parties 3M, 5A, 5C, 7B - WRC-15 Agenda item 1.9.1 � WP 4A 2012-09-24
[ 51 ]
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2 � WP 4C 2012-09-14
[ 50 ]
+Ann.1-15
Report on the meeting of Working Party 3M (Geneva, 18 - 27 June 2012) � Chairman, WP 3M 2012-06-27
[ 49 ]
Final List of Participants - Working Party 3M (Geneva, 18-27 June 2012) � Director, BR 2012-06-27
[ 48 ]
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information) � WP 5B 2012-06-22
[ 47 ]
List of documents issued � BR Study Groups Department 2012-06-15
[ 46 ]
Liaison statement to Study Groups 3, 4, 5, 7 and relevant Working Parties - Active services operating above 275 GHz � SG 1 2012-06-15
[ 45 ]
Working document towards an update of Recommendation ITU-R P.618 - A new approach for the effective path-length model fot rain attenuation based on rain-cell characteristics � Korea (Republic of) 206-3/3, 201-4/3 2012-06-11
[ 44 ]
Contribution to ITU-R data bank - Statistics of rain rate and rain attenuation at 73 GHz � Korea (Republic of) 2012-06-11
[ 43 ]
Proposed modification to Question ITU-R 206-3/3 - Improvement of the prediction method for rain attenuation for fixed- and broadcasting-satellite services � Korea (Republic of) 206-3/3 2012-06-11
[ 42 ]
Draft fascicle on parameters extraction for state oriented LMS channel models � France 2012-06-11
[ 41 ]
Information document in support of revision of Recommendation ITU-R P.681 on land mobile satellite generative modeling at 1.5 GHz and 2.4 GHz � European Space Agency , Germany (Federal Republic of) 206/3 2012-06-11
[ 40 ]
Information document in support of revision of Recommendation ITU-R P.681 on Land Mobile Satellite Generative Modeling � European Space Agency , Austria , Spain 206/3 2012-06-11
[ 39 ]
Proposed additions to ITU-R Study Group 3 Databanks in Part II - Earth Space path data and in Part IV- Radiometeorological data � France 2012-06-11
[ 38 ]
Contribution to the propagation data banks - Rainfall rate measurements in Spain � Spain 2012-06-11
[ 37 ]
Contribution to the propagation data bands - Rain rate and slant-path rain attenuation measurements at 50 GHz in Madrid � Spain 2012-06-11
[ 36 ]
Information document on Doppler spectrum modelling for LMS channels � France 2012-06-11
[ 35 ]
Information document about frequency scaling in Recommendation ITU-R P.618-10 - Instantaneous frequency scaling of rain attenuation � France , European Space Agency , Italy 2012-06-11
[ 34 ]
The use of GlobCover clutter data for prediction, according to Recommendation ITU-R P.1812 � TELEKOMUNIKACJA POLSKA S.A. 203-5/3 2012-06-11
[ 33 ]
The correction of the equations for predicting rain attenuation distribution in Recommendation ITU-R P.530-14 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems � China (People's Republic of) 2012-06-11
[ 32 ]
The correction of the editorial errors in Table 1 in Recommendation ITU-R P.617-2 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems � China (People's Republic of) 2012-06-11
[ 31 ]
Modification to rainfall rate adjustment factor for Modelling and Prediction Methods of Rain Attenuation Statistics � China (People's Republic of) 2012-06-11
[ 30 ]
Liaison statement to Working Parties 4C, 5A, 7B, and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6 � WP 4A 2012-06-11
[ 29 ]
Liaison statement to Working Parties 3M and 3J - Clarification on the applicable propagation mechanisms related to interference assessment in the space-to earth direction � WP 4A 2012-06-11
[ 28 ]
Liaison statement to Working Parties 5A and 7B (copy to Working party 3M for information) - WRC-15 Agenda item 1.9.1 � WP 4A 2012-06-11
[ 27 ]
Liaison statement to Working Party 3M - Handbook on the selection and use of ITU-R radio propagation prediction methods for interference and sharing studies � WP 4A 2012-06-11
[ 26 ]
Information for developing a method of predicting the outage intensity for Recommendation ITU-R P.530 - Study on Method for Estimating Outage Intensity for Multipath Fading � Japan 204/3 2012-06-11
[ 25 ]
Contributions to ITU-R Study Group 3 Databanks - Rain rate and slant-path attenuation (Table II-1) and fade duration (Table II-3) from measurements in Ottawa � Canada 2012-06-09
[ 24 ]
New measurements data for ITU-R Study Group 3 databank Table 1-2 - Line-of-sight average worst-month multipath fading and enhancement in narrow bandwidths � Canada 2012-06-09
[ 23 ]
Discussion paper concerning Recommendation ITU-R P.530-14 � United Kingdom of Great Britain and Northern Ireland 2012-06-08
[ 22 ]
Information document on the diffraction loss models testing on terrestrial paths - Diffraction loss models testing � Czech Republic 2012-06-08
[ 21 ]
Further enhancement of the method for prediction of outage intensity due to multipath propagation � Russian Federation 2012-06-08
[ 20 ]
Adding curves of probability of attenuation exceedance versus rain attenuation, necessary to facilitate prediction of outage intensity due to rain attenuation � Russian Federation 2012-06-08
[ 19 ]
Modification to Report ITU-R P.2145 (06/2009) � Germany (Federal Republic of) 2012-06-07
[ 18 ]
Information document on a new simplified method for estimating gaseous absorption at low elevation angles for earth-space paths � United States of America 2012-06-04
[ 17 ]
Working document toward a PDNR on prediction of path attenuation on links between an airborne platform and space and between an airborne platform and the surface of the Earth � United States of America 233/3 2012-06-04
[ 16 ]
Draft new Handbook - Handbook on the selection and use of radio propagation models for interference prediction and ITU sharing studies � United States of America 2012-06-04
[ 15 ]
Preliminary draft revision to Recommendation ITU-R P.452-14 � United States of America 2012-06-04
[ 14 ]
Physical basis for frequency dependence of the adjustment factor for prediction of rain attenuation on Earth-space paths � United States of America 2012-06-04
[ 13 ]
Discussion document on Handbooks � United States of America 2012-06-04
[ 12 ] �
This document has been withdrawn � Canada 2012-06-05
[ 11 ]
Liaison statement to ITU-R WPs 3K, 3M, 4A, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and the International Maritime Organization (IMO) and International Association of Marine AIDS to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC-15) Agenda item 1.15 � WP 5B 2012-06-06
[ 10 ]
Liaison statement to ITU-R Working Party 3M - Data and statistics on propagation of Earth-to-space signals at frequencies greater than 10 GHz � WP 4B 2012-06-04
[ 9 ]
Liaison statement to Study Group 3 - Propagation models for calculation of the target detection distance of automotive radars in 77-78 GHz band � WP 5B 2012-06-01
[ 8 ]
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to Working Party 1A, Working Party 3K, Working Party 3M, Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5C, Working Party 5D and Working Party 7C for information) � WP 5B 2012-06-01
Results:257 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-11-16