Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 58 ]
�
� |
Proposed amendment to preliminary draft new Recommendation ITU-R F.[9B/AOEP] - Analysis and optimization of ther error performance of digital fixed wireless systems for the purpose of bringing into service and maintenance
�
� |
Australia
� |
235/9
� |
2004-09-06 |
|
[ 57 ]
�
� |
Proposed amendments to working document towards PDNR ITU-R F.[9B/BWA] - Recommended standards for broadband wireless access
�
� |
IEEE
� |
� |
2004-08-31 |
|
[ 56 ]
�
� |
ETSI BRAN project on broadband wireless access
�
� |
Director, Radiocommunication Bureau
� |
� |
2004-06-22 |
|
[ 55 ]
�
� |
Liaison statement - Reply to WP 9B on fixed wireless systems
�
� |
ITU-T Study Group 9
� |
� |
2004-05-19 |
|
[ 54 ]
�
� |
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
�
� |
ITU-T SG 15
� |
� |
2004-05-12 |
|
[ 53 ]
�
� |
Liaison statement - Reply to the liaison statement describing PDNR for Broadband Wireless Access and amendments to the ANT Standards Overview
�
� |
ITU-T SG 15
� |
A11/15
� |
2004-05-11 |
|
[ 52 ]
�
� |
Liaison statement to Working Parties 4A, 6S, 7C, 8B, 9B and 9D - Computer simulation of unwanted emission spectra for use in compatibility studies between active and passive services
�
� |
TG 1/9
� |
� |
2004-05-06 |
|
[ 51 ]
�
� |
Liaison statement to WP 8B (Copy to WP's 9B and 9D for information) - WRC-07 Agenda item 1.3, Resolution 747 (WRC-03): Possible extension of the existing primary allocations to the Earth exploration-satellite service (active) and the space research service (active)
�
� |
WP 7C
� |
� |
2004-03-31 |
|
[ 50 ]
�
� |
Liaison statement to Working Party 6P - (Copy for information Working Parties 8A, 8D, 8F, 9B and 9D) - Consideration of sharing between BSS or BSS (sound) and terrestrial electronic news gathering applications
�
� |
JTG 6-8-9
� |
� |
2004-03-30 |
|
[ 49 ]
�
+Ann.1-11� |
Chairman's report of Working Party 9B, Geneva, 19-26 February 2004
�
� |
Chairman, WP 9B
� |
� |
2004-03-01 |
|
[ 48 ]
�
� |
Liaison statement on the ITU-T IP project
�
� |
ITU-T SG 13
� |
� |
2004-02-25 |
|
[ 47 ]
�
� |
Liaison statement on NGN studies
�
� |
ITU-T SG 13
� |
� |
2004-02-25 |
|
[ 46 ]
�
� |
Final List of Participants - Working Party 9B
�
� |
Director, BR
� |
� |
2004-02-25 |
|
[ 45 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2004-02-18 |
|
[ 44 ]
�
� |
ETSI BRAN project on broadband wireless access
�
� |
Director, Radiocommunication Bureau
� |
� |
2004-02-18 |
|
[ 43 ]
�
� |
Liaison statement to Working Parties 9B and 9D - Request for information concerning fixed service characteristics in the band 17.7-19.7 GHz with regard to sharing with FSS systems using highly inclined orbits (HIO)
�
� |
WP 4-9S
� |
� |
2004-02-18 |
|
[ 42 ]
�
� |
Guidelines for the work of the February 2004 meeting
�
� |
Chairman, WP 9B
� |
� |
2004-02-17 |
|
[ 41 ]
�
� |
ITU-T Study Group 9 studies on broadband wireless access
�
� |
Director, BR
� |
� |
2004-02-17 |
|
[ 40 ]
�
� |
Proposed Revision of Preliminary Draft New Recommendation on Spectrum Vision for the Fixed Service
�
� |
Brazil (Federative Republic of)
� |
� |
2004-02-13 |
|
[ 39 ]
�
� |
Liaison statement to Working Party 9B - Examination of access technologies for broadband communications
�
� |
ITU-D Study Group 2
� |
� |
2004-02-12 |
|
[ 38 ]
�
� |
Consideration on category of the Questions
�
� |
Chairman, WP 9B
� |
� |
2004-02-12 |
|
[ 37 ]
�
� |
Proposed revision of PDNR on spectrum vision for the fixed service
�
� |
Canada
� |
221/9
� |
2004-02-11 |
|
[ 36 ]
�
� |
Work for CPM-06-2
�
� |
Chairman, WP 9B
� |
� |
2004-02-11 |
|
[ 35 ]
�
� |
Draft modification of Recommendation ITU-R F.385-7 - Radio-frequency channel arrangements for fixed wireless systems operating in the 7 GHz band
�
� |
Russian Federation
� |
136/9
� |
2004-02-10 |
|
[ 34 ]
�
� |
Contribution to working document towards PDNR "Analysis and optimisation of the error performance of digital fixed wireless systems for the purpose of bringing into service and maintenance"
�
� |
Australia
� |
235/9
� |
2004-02-09 |
|
[ 33 ]
�
� |
Contribution to PDNR "Future trend of technology and applications for the Fixed Service"
�
� |
Australia
� |
221/9
� |
2004-02-09 |
|
[ 32 ]
�
� |
Preferred antenna radiation characteristics of point-to-point fixed wireless systems
�
� |
Australia
� |
110/9
� |
2004-02-09 |
|
[ 31 ]
�
� |
IEEE 802.16 Working Group on broadband wireless access
�
� |
Director, Radiocommunication Bureau
� |
� |
2004-02-04 |
|
[ 30 ]
�
� |
Comments on Japanese contribution in Document 9B/25 concerning technical characteristics of broadband fixed wireless access (FWA) systems conveying Internet Protocol (IP) packets
�
� |
Alvarion and NTT
� |
220/9
� |
2004-02-03 |
|
[ 29 ]
�
� |
Proposed revision of working document toward a preliminary draft new Recommendation ITU-R F.[9B/AOEP] - Analysis and optimization of the error performance of digital fixed wireless systems for the purpose of bringing into service and maintenance
�
� |
Japan
� |
235/9
� |
2004-02-02 |
|
[ 28 ]
�
� |
Use of the fixed service in the deployment of IMT-2000 infrastructure networks
�
� |
Japan
� |
221/9
� |
2004-01-30 |
|
[ 27 ]
�
� |
Preliminary consideration on applications of fixed wireless systems operating in bands above 57 GHz and proposed revision of Recommendation ITU-R F.1102-1
�
� |
Japan
� |
234/9, 107/9
� |
2004-01-30 |
|
[ 26 ]
�
� |
Characteristics of fixed wireless multipoint-to-multipoint (MP-MP) systems with mesh network topology operating in frequency bands above about 17 GHz
�
� |
Japan
� |
� |
2004-01-30 |
|
[ 25 ]
�
� |
Technical characteristics of broadband wireless access (FWA) systems conveying Internet protocol (IP) packets
�
� |
Japan
� |
� |
2004-01-30 |
|
[ 24 ]
�
� |
Proposed revision of PDNR on Spectrum vision for the fixed service
�
� |
Japan
� |
221/9
� |
2004-01-30 |
|
[ 23 ]
�
� |
Use of the fixed service in the deployment of IMT-2000 infrastructure networks
�
� |
Switzerland, Germany
� |
221/9
� |
2004-01-30 |
|
[ 22 ]
�
� |
Report of the seventh meeting - (Geneva, 24-28 November 2003)
�
� |
Principal Rapporteurs, JRG 8A-9B
� |
� |
2004-01-06 |
|
[ 21 ]
�
� |
Liaison to WP 9B on the status of JRG 8A-9B
�
� |
WP 8A
� |
� |
2003-12-15 |
|
[ 20 ]
�
� |
Liaison statement to Working Party 9B - Technical characteristics of broadband fixed wireless access systems conveying IP packets or ATM cells
�
� |
JRG 8A-9B
� |
� |
2003-11-27 |
|
[ 19 ]
�
� |
Consideration on the future status of JRG 8A-9B
�
� |
Principal Rapporteurs, JRG 8A-9B
� |
� |
2003-11-27 |
|
[ 18 ]
�
� |
Wireless broadband and convergence studies in ITU-R
�
� |
Brazil (Federative Republic of)
� |
140/9
� |
2003-11-20 |
|
[ 17 ]
�
� |
Broadband fixed wireless standards - IEEE 802.16 and ETSI HiperMAN
�
� |
Alvarion
� |
� |
2003-11-20 |
|
[ 16 ]
�
� |
Proposal to suppress JRG 8A-9B and to reorganise the work within parent Working Parties 8A and 9B
�
� |
France
� |
� |
2003-11-18 |
|
[ 15 ]
�
� |
Liaison statement Study Groups 3, 4, 7, 8 and 9 - Bands above 3 000 GHz
�
� |
WG 1A
� |
� |
2003-11-13 |
|
[ 14 ]
�
� |
Liaison statement to Working Parties 3J, 3M, 4A, 7C, 7D, 8A, 8D, 8F and 9B
�
� |
WP 1A
� |
� |
2003-11-13 |
|
[ 13 ]
�
� |
Preparation of CPM06 Report
�
� |
Chairman, SG 7
� |
� |
2003-11-11 |
|
[ 12 ]
�
� |
Liaison statement to Working Parties 4B, 8A, 8F and 9B - New versions of the Access Network Transport (ANT) Standards overview and work plan
�
� |
ITU-T SG 15
� |
� |
2003-11-11 |
|
[ 11 ]
�
� |
Liaison statement to ITU-R Working Parties 8A and 9B and to Joint Working Party 8A-9B - Reply to letter from Mr. Marks, Chair IEEE 802.16 of 21 October 2003 on co-operation request
�
� |
ITU-T SG 15
� |
� |
2003-11-11 |
|
[ 10 ]
�
� |
Liaison statement to ITU-R WP 8A, WP 9B and JRG 8A-9B - Reply to letter from Mr. Marks, Chair IEEE 802.16 of 21 October 2003 on co-operation request: ANT Standardization Plan and Work Plan
�
� |
ITU-T SG 15
� |
� |
2003-11-11 |
|
[ 9 ]
�
� |
Liaison statement to Working Party 9B - Reply to comments on the new versions of the ANT standardization plan and workplan
�
� |
ITU-T SG 15
� |
� |
2003-11-11 |
Results:258 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):