Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 440 ]
�
� |
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access
�
� |
Huawei Technologies
� |
Q9/15
� |
2009-09-16 |
|
[ 439 ]
�
� |
Text proposal for clause 8/G.798.1
�
� |
Huawei Technologies
� |
Q9/15
� |
2009-09-16 |
|
[ 438 ]
�
� |
Proposal to specify OCh/OTUkV_A with OTUk_CP
�
� |
Huawei Technologies
� |
Q9/15, Q11/15
� |
2009-09-16 |
|
[ 437 ]
�
� |
Multi-vendor demarcation in the OTN
�
� |
Huawei Technologies
� |
Q9/15, Q11/15
� |
2009-09-16 |
|
[ 436 ]
�
� |
LO and HO ODU view points and NNIs
�
� |
Huawei Technologies
� |
Q9/15, Q11/15
� |
2009-09-16 |
|
[ 435 ]
�
� |
Document withdrawn
�
See C533
� |
N/A
� |
� |
2009-09-16 |
|
[ 434 ]
�
� |
First models of OTN equipment proposal
�
� |
Huawei Technologies
� |
Q9/15
� |
2009-09-16 |
|
[ 433 ]
�
� |
Multi-lane STM-256
�
� |
AT&T
� |
Q11/15
� |
2009-09-16 |
|
[ 432 ]
�
� |
Optical Monitoring
�
� |
AT&T
� |
Q7/15, Q6/15
� |
2009-09-16 |
|
[ 431 ]
�
� |
G.709 "Black Link" OTM-1r.m Interface as IrDI
�
� |
AT&T
� |
Q6/15, Q12/15, Q11/15
� |
2009-09-16 |
|
[ 430 ]
�
� |
G.709 OTN domains
�
� |
AT&T
� |
Q11/15
� |
2009-09-16 |
|
[ 429 ]
�
� |
G.8032 (Comments on Draft)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2009-09-16 |
|
[ 428 ]
�
� |
Additional requirements for G.7718
�
� |
Alcatel-Lucent
,
NTT
� |
Q14/15
� |
2009-09-16 |
|
[ 427 ]
�
� |
G.8032 (Access Protection)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2009-09-16 |
|
[ 426 ]
�
� |
Eye Mask for 10G G.695
�
� |
Nortel Networks (Canada)
� |
Q6/15
� |
2009-09-16 |
|
[ 425 ]
�
� |
Support for the approval of G.9960 and consent of G.hn Recommendations
�
� |
Portugal Telecom
� |
Q4/15
� |
2009-09-15 |
|
[ 424 ]
�
� |
Proposal of fibre macrobending identification method
�
� |
SoftBank Telecom
� |
Q5/15
� |
2009-09-15 |
|
[ 423 ]
�
� |
Considerations of Y.1731 Performance Monitoring
�
� |
NEC Corporation
� |
Q10/15
� |
2009-09-15 |
|
[ 422 ]
�
� |
Configuration principle of interconnected rings in G.8032v2
�
� |
NEC Corporation
� |
Q9/15
� |
2009-09-15 |
|
[ 421 ]
�
� |
Considerations of guard timer in G.8032v2
�
� |
NEC Corporation
� |
Q9/15
� |
2009-09-15 |
|
[ 420 ]
�
� |
Considerations of FS state in G.8032v2
�
� |
NEC Corporation
� |
Q9/15
� |
2009-09-15 |
|
[ 419 ]
�
� |
Considerations of initial state in G.8032v2
�
� |
NEC Corporation
� |
Q9/15
� |
2009-09-15 |
|
[ 418 ]
�
� |
Proposed text for equal priority requests in G.8031
�
� |
NEC Corporation
� |
Q9/15
� |
2009-09-15 |
|
[ 417 ]
�
� |
Proposed modification for loss measurement process in G.8021
�
� |
NEC Corporation
� |
Q9/15
� |
2009-09-15 |
|
[ 416 ]
�
� |
Draft new Recommendation L.limt "Low impact mini-trench installation technique"
�
� |
Sirti SpA
� |
Q16/15
� |
2009-09-15 |
|
[ 415 ]
�
� |
Considerations about physical layer configurations for WSON
�
� |
Ericsson
� |
Q6/15
� |
2009-09-15 |
|
[ 414 ]
�
� |
Proposal of architecture of G.omci
�
� |
NTT
� |
Q2/15
� |
2009-09-15 |
|
[ 413 ]
�
� |
Proposal of home network remote management requirements on G.hntreq
�
� |
NTT
� |
Q1/15
� |
2009-09-15 |
|
[ 412 ]
�
(Rev.1)� |
Latency Measurements in the Optical Transport Network Using G.709 Overhead
�
� |
Verizon
,
AT&T
,
BT
,
Nokia Siemens Networks
� |
Q9/15, Q11/15
� |
2009-09-15 |
|
[ 411 ]
�
� |
Sublayers and WSON in G.872
�
� |
Ciena Corp
� |
Q12/15
� |
2009-09-15 |
|
[ 410 ]
�
� |
An updated Topology model for WSON
�
� |
Ciena Corp
� |
Q12/15
� |
2009-09-15 |
|
[ 409 ]
�
� |
Some thoughts on Transport Entities
�
� |
Ciena Corp
� |
Q12/15
� |
2009-09-15 |
|
[ 408 ]
�
� |
Characteristic Information, Sublayers and Media
�
� |
Ciena Corp
� |
Q12/15
� |
2009-09-15 |
|
[ 407 ]
�
� |
Mapping of 100GBASE-R into OPU4
�
� |
Alcatel-Lucent
� |
Q11/15
� |
2009-09-15 |
|
[ 406 ]
�
� |
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4
�
� |
Alcatel-Lucent
� |
Q9/15, Q11/15
� |
2009-09-15 |
|
[ 405 ]
�
� |
Adaptation of STM-256 over multichannel parallel interfaces
�
� |
Alcatel-Lucent
,
Cisco
,
Finisar
,
Juniper
� |
Q9/15, Q11/15
� |
2009-09-15 |
|
[ 404 ]
�
� |
Propose to add Link discover Process based on OAM in G.8051
�
� |
ZTE Corporation
� |
Q14/15
� |
2009-09-15 |
|
[ 403 ]
�
� |
Propose to add requirement of MAC topology management
�
� |
ZTE Corporation
� |
Q14/15
� |
2009-09-15 |
|
[ 402 ]
�
� |
Propose to add MAC Link discover support in G.8051
�
� |
ZTE Corporation
� |
Q14/15
� |
2009-09-15 |
|
[ 401 ]
�
� |
Propose to add requirement of discovery support on MPLS-TP OAM Requirement
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2009-09-15 |
|
[ 400 ]
�
� |
Propose to add requirement of discovery support on MPLS-TP NM Requirement
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2009-09-15 |
|
[ 399 ]
�
� |
CSF Indication for Y.1731 (Ethernet OAM)
�
� |
Alcatel-Lucent
� |
Q9/15, Q10/15
� |
2009-09-15 |
|
[ 398 ]
�
� |
Correct power budget modelling of indoor access installations
�
� |
Draka Communications
� |
Q5/15, Q16/15
� |
2009-09-15 |
|
[ 397 ]
�
� |
Proposal for revision of ITU-T Recommendation G.657 (Explanation)
�
� |
Draka Communications
� |
Q5/15, Q16/15
� |
2009-09-15 |
|
[ 396 ]
�
� |
Proposal for revision of ITU-T Recommendation G.657 (Full text)
�
� |
Draka Communications
� |
Q5/15, Q16/15
� |
2009-09-15 |
|
[ 395 ]
�
� |
Further thoughts on the GMP CnD encoding
�
� |
PMC-Sierra
� |
Q11/15
� |
2009-09-14 |
|
[ 394 ]
�
� |
Rooted mp FDFr
�
� |
Alcatel Shanghai Bell
,
CATR
,
MII
� |
Q12/15
� |
2009-09-14 |
|
[ 393 ]
�
� |
G.vector: Minimum requirements for frequency-dependent modulation of probe tones
�
� |
Ikanos Communications
� |
Q4/15
� |
2009-09-14 |
|
[ 392 ]
�
� |
G.hn: Alternate Probe Transmission for Channel Estimation
�
� |
Aware
� |
Q4/15
� |
2009-09-15 |
|
[ 391 ]
�
� |
G.vector: Sub-sampling of reported error samples
�
� |
Ikanos Communications
� |
Q4/15
� |
2009-09-14 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):