Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 640 ]
�
� |
G.inp: Modifications to G.inp Annex A management plane commands
�
� |
Infineon Technologies
� |
Q4/15
� |
2009-09-20 |
|
[ 639 ]
�
� |
G.inp: Topics missing in Retransmission Return Channel text of G.inp
�
� |
Infineon Technologies
� |
Q4/15
� |
2009-09-20 |
|
[ 638 ]
�
� |
G.inp: Changes related to ReTX "Capability" and "Mode Select" in G.994.1 sections A.2.1-2,
�
� |
Infineon Technologies
� |
Q4/15
� |
2009-09-20 |
|
[ 637 ]
�
� |
G.inp: On ETR and Retransmission Overhead
�
� |
Infineon Technologies
� |
Q4/15
� |
2009-09-20 |
|
[ 636 ]
�
� |
G.inp: Test to estimate the MTBE for G.inp
�
� |
Infineon Technologies
� |
Q4/15
� |
2009-09-20 |
|
[ 635 ]
�
� |
PEC Functional Model
�
� |
RAD Data Communications Ltd.
� |
Q13/15
� |
2009-09-20 |
|
[ 634 ]
�
� |
G.gen: G.vector: G.vdsl: G.hs: Operation of a legacy G.993.2 VTU-R in a vectoring group
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 633 ]
�
� |
G.vector: VLAN identifier for L2 backchannel
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 632 ]
�
� |
G.inp: On defining the BER / MTBE working point in retransmission
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 631 ]
�
� |
G.vector: Periodicity for frequency dependent pilot sequences
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 630 ]
�
� |
G.vector: Unification and simplification of error block schemes.
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 629 ]
�
� |
G.inp: Receiver Delay Equalisation and Timestamps
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 628 ]
�
� |
G.inp: Working Text Update of Annex D (Support of G.inp in G.997.1)
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 627 ]
�
� |
G.ploam: LATN and SATN corrigendum
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 626 ]
�
� |
G.ADSL : Channel Policies
�
� |
France Telecom Orange
� |
Q4/15
� |
2009-09-20 |
|
[ 625 ]
�
� |
OTU4 FEC for metro distance
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2009-09-20 |
|
[ 624 ]
�
� |
Naming of OTN interfaces in G.709
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2009-09-20 |
|
[ 623 ]
�
� |
Network requirement of G.709 interfaces used for Black Link applications.
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2009-09-20 |
|
[ 622 ]
�
� |
Experimental demonstration of black-link applications
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2009-09-20 |
|
[ 621 ]
�
� |
Consideration on ODUflex resizing
�
� |
Deutsche Telekom
� |
Q11/15
� |
2009-09-20 |
|
[ 620 ]
�
� |
Proposed of 3R regeneration in G.872
�
� |
Deutsche Telekom
� |
Q12/15
� |
2009-09-20 |
|
[ 619 ]
�
� |
OCh definitions in G.872
�
� |
Deutsche Telekom
� |
Q12/15
� |
2009-09-20 |
|
[ 618 ]
�
� |
Proposal for mapping of client signals over LO OPU4
�
� |
ETRI
� |
Q11/15
� |
2009-09-20 |
|
[ 617 ]
�
� |
Comments on OTM-0.mvn in draft revised G.709 v3.4
�
� |
ETRI
� |
Q11/15
� |
2009-09-20 |
|
[ 616 ]
�
� |
BMCA algorithm for IEEE 1588 telecom profile
�
� |
Nokia Siemens Networks
� |
Q13/15
� |
2009-09-20 |
|
[ 615 ]
�
� |
Transport of SSM over GPON
�
� |
BT
� |
Q13/15
� |
2009-09-20 |
|
[ 614 ]
�
� |
Correction to Test Case ITU-T G.8261 Test Case 17
�
� |
BT
� |
Q13/15
� |
2009-09-20 |
|
[ 613 ]
�
� |
G.680: modelling amplitude and phase in single and cascaded ONEs
�
� |
Ericsson
� |
Q6/15
� |
2009-09-20 |
|
[ 612 ]
�
� |
GEN: VDSL: ADSL: 09XC-065 - New Generalised Transmitter Referred Virtual noise
�
� |
BT plc
� |
Q4/15
� |
2009-09-19 |
|
[ 611 ]
�
� |
G.hs: G.vdsl: Handshake tones for HPE band plans.
�
� |
BT plc
� |
Q4/15
� |
2009-09-19 |
|
[ 610 ]
�
� |
Aspects of INP management
�
� |
BT plc
� |
Q4/15
� |
2009-09-19 |
|
[ 609 ]
�
� |
ADSL: VDSL: Proposal for development of 'black box' recorder functionality for VDSL2 and ADSL2/ADSL2plus transceivers.
�
� |
BT plc
� |
Q4/15
� |
2009-09-19 |
|
[ 608 ]
�
� |
G.gen: VDSL2: ADSL: Mitigating multiple noise sources with one VN profile
�
� |
BT plc
� |
Q4/15
� |
2009-09-19 |
|
[ 607 ]
�
� |
GEN: VDSL: ADSL: 09XC-065 - New receiver referred virtual noise
�
� |
BT plc
� |
Q4/15
� |
2009-09-19 |
|
[ 606 ]
�
� |
Problems with the VN agreements of Xian
�
� |
BT
� |
Q4/15
� |
2009-09-18 |
|
[ 605 ]
�
� |
VDSL2: Improvements to KL0 estimation
�
� |
BT
� |
Q4/15
� |
2009-09-18 |
|
[ 604 ]
�
� |
Comment on Traffic Models in G.8261
�
� |
Ericsson
� |
Q13/15
� |
2009-09-18 |
|
[ 603 ]
�
� |
G.hn: CISPR Compliant Annex - Alignment of key parameters to ensure compliance with EMC requirements and CISPR update.
�
� |
BT
� |
Q4/15
� |
2009-09-18 |
|
[ 602 ]
�
� |
G.vdsl: Reverse Powering for VDSL2
�
� |
BT
� |
Q4/15
� |
2009-09-18 |
|
[ 601 ]
�
� |
Time distribution model using 1588v2 for performance indication
�
� |
CMCC
,
ZTE Corporation
� |
Q13/15
� |
2009-09-18 |
|
[ 600 ]
�
� |
Proposal on time interface specification
�
� |
CMCC
,
ZTE Corporation
� |
Q13/15
� |
2009-09-18 |
|
[ 599 ]
�
� |
Test and analysis of time synchronization using 1588v2 for transport network
�
� |
CMCC
,
ZTE Corporation
� |
Q13/15
� |
2009-09-18 |
|
[ 598 ]
�
� |
Document withdrawn
�
� |
N/A
� |
Q5/15
� |
2009-09-18 |
|
[ 597 ]
�
� |
G.hn: CBTXOP with same attributes
�
� |
SPiDCOM Technologies
� |
Q4/15
� |
2009-09-18 |
|
[ 596 ]
�
� |
FDB flush scheme for G.8032 Ethernet ring protection
�
� |
ETRI
� |
Q9/15
� |
2009-09-18 |
|
[ 595 ]
�
� |
Proposed update of OTNT work plan
�
� |
NTT
� |
Q3/15
� |
2009-09-18 |
|
[ 594 ]
�
� |
Proposal of modification of MPLS-TP OAM requirements
�
� |
NTT
� |
Q10/15
� |
2009-09-18 |
|
[ 593 ]
�
� |
Proposal of additional MPLS-TP OAM requirements
�
� |
NTT
� |
Q10/15
� |
2009-09-18 |
|
[ 592 ]
�
� |
Proposal of definition of maintenance points (MEP and MIP)
�
� |
NTT
� |
Q12/15, Q10/15
� |
2009-09-18 |
|
[ 591 ]
�
� |
G.VDSL: VDSL2 resynchronisation stability needs to be improved
�
� |
TNO
,
Swisscom
� |
Q4/15
� |
2009-09-18 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):