Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 510 ]
�
� |
Super-Product BCH (SP-BCH) Code for 100G and Beyond Networking
�
� |
Broadcom Corporation
� |
Q11/15
� |
2014-03-07 |
|
[ 509 ]
�
� |
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation
�
� |
Metanoia Technologies, Inc.
� |
Q4/15, Q18/15
� |
2014-03-07 |
|
[ 508 ]
�
� |
G.hn: Using ACE symbols with precoding to save memory and complexity in Receiver
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 507 ]
�
� |
G.hn: Proposal to add SNR and throughput measurement tools in G.hn
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 506 ]
�
� |
G.hn: Special TXOP for IDCC / IDSW
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 505 ]
�
� |
G.hn: Comparison of the two options for Inter-Medium Bridging
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 504 ]
�
� |
Example Alternative B100G ODU Frame Format
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 503 ]
�
� |
Thoughts on FEC for 400G IrDI
�
� |
Alcatel-Lucent USA Inc.
� |
Q6/15, Q11/15
� |
2014-03-07 |
|
[ 502 ]
�
� |
Possible areas for B100G OTN Framing optimization
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 501 ]
�
� |
Possible 400G Ethernet PCS format and implications for B100G OTN framing
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 500 ]
�
� |
OTN B100G Framing Decisions
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 499 ]
�
� |
ODU SMP Lower Order 1-stage signalling
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-03-07 |
|
[ 498 ]
�
� |
Clarification of clockClass table [G.8275.1]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 497 ]
�
� |
ODU SMP Proposal Status
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-03-07 |
|
[ 496 ]
�
� |
T-TSC-P/T-BC-P/APTSC Model for partial timing support [G.8273.4]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 495 ]
�
� |
T-BC SyncE transient testing method [G.8273]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 494 ]
�
� |
T-BC SyncE Transient Requirement [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 493 ]
�
� |
T-BC Model [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 492 ]
�
� |
T-BC Applicable Interfaces [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 491 ]
�
� |
Bench Results of SyncE (for use as IEEE1588/GNSS holdover) [G.827x]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 490 ]
�
� |
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.
�
� |
Ikanos Communications
� |
Q4/15
� |
2014-03-07 |
|
[ 489 ]
�
� |
Definition of Clock Behaviour with Regards to clockClass Usage [G.8275.1]
�
� |
Ciena Canada
� |
Q13/15
� |
2014-03-07 |
|
[ 488 ]
�
� |
T-BC Clock Models [G.8273.2]
�
� |
Ciena Canada
� |
Q13/15
� |
2014-03-07 |
|
[ 487 ]
�
� |
Application code compatible with 40GBASE-ER4 in G.695
�
� |
Ciena Canada
� |
Q6/15
� |
2014-03-07 |
|
[ 486 ]
�
� |
Proposal for Update to G.977 considering 40G and 100G Coherent Systems
�
� |
Ciena Canada
� |
Q8/15
� |
2014-03-07 |
|
[ 485 ]
�
� |
Proposed changes to Recommendation G.977 for 40G and 100G systems
�
� |
Ciena Canada
� |
Q8/15
� |
2014-03-07 |
|
[ 484 ]
�
� |
Layers in Transport SDN
�
� |
Ciena Canada
� |
Q14/15, Q12/15
� |
2014-03-07 |
|
[ 483 ]
�
� |
MEF Mobile Backhaul
�
� |
Ericsson Canada, Inc.
� |
Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15
� |
2014-03-07 |
|
[ 482 ]
�
� |
Adoption of MEF technical specifications
�
� |
Canada
� |
Q10/15
� |
2014-03-07 |
|
[ 481 ]
�
� |
G9979
�
� |
Canada
� |
Q18/15
� |
2014-03-07 |
|
[ 480 ]
�
� |
G.inp: Proposed edits to help complete the VDSL LPM Amendment
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
Ikanos Communications
� |
Q4/15
� |
2014-03-07 |
|
[ 479 ]
�
� |
Protection Architectures for G.metro
�
� |
ADVA Optical Networking
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-03-07 |
|
[ 478 ]
�
(Rev.1-2)� |
Reference diagrams for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-03-07 |
|
[ 477 ]
�
� |
Proposal on Communication framework for Smart Home
�
� |
Fujitsu Limited
,
Japan Advanced Institute of Science and Technology
,
NEC Corporation
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q15/15
� |
2014-03-07 |
|
[ 476 ]
�
� |
Proposal of new Recommendation "Referenced guidance on fiber optic indoor/outdoor installation"
�
� |
Rwanda Utilities Regulatory Authority (RURA)
� |
Q16/15
� |
2014-03-07 |
|
[ 475 ]
�
� |
Comparison of B100G OTN mapping and multiplexing approaches
�
� |
Fujitsu Limited
� |
Q11/15
� |
2014-03-07 |
|
[ 474 ]
�
� |
B100G ODUflex with modular frame structure (ODUflexM)
�
� |
Fujitsu Limited
� |
Q11/15
� |
2014-03-07 |
|
[ 473 ]
�
� |
Consideration on applications requiring B100G OTN in multiple line cards
�
� |
Fujitsu Limited
� |
Q11/15
� |
2014-03-07 |
|
[ 472 ]
�
� |
Proposal on revisions of Recs. G.652& G.657
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2014-03-07 |
|
[ 471 ]
�
� |
Proposal on revision of a new G.654 Category
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2014-03-07 |
|
[ 470 ]
�
� |
Factors Affecting the Blowing Distance of Microduct Cable
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q16/15
� |
2014-03-07 |
|
[ 469 ]
�
� |
Withdrawn
�
Reposted as TD039/WP2, "G.650.2: Correspondence summary"
� |
N/A
� |
� |
2014-03-07 |
|
[ 468 ]
�
� |
The proposal on test methods of G.657fiber in G.650.1
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2014-03-07 |
|
[ 467 ]
�
(Rev.1)� |
Consideration of G.metro application for mobile fronthaul network
�
� |
SOFTBANK TELECOM Corp.
� |
Q6/15
� |
2014-03-07 |
|
[ 466 ]
�
� |
Considerations on DS/US adjustment for the VDSL2
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2014-03-07 |
|
[ 465 ]
�
� |
Network optimization based on bandwidth message signalling
�
� |
Telefon AB - LM Ericsson
� |
Q10/15
� |
2014-03-06 |
|
[ 464 ]
�
� |
Signalling bandwidth adaptation
�
� |
Telefon AB - LM Ericsson
� |
Q10/15
� |
2014-03-06 |
|
[ 463 ]
�
� |
ITU-R WP 5A, WP5C and WP 5D Liaison - Backhaul networks for IMT
�
� |
Telefon AB - LM Ericsson
� |
Q12/15
� |
2014-03-06 |
|
[ 462 ]
�
� |
Filtering for the Network Limits measurements in G.8271.1
�
� |
Calnex Solutions Limited
,
Huawei Technologies Co. Ltd.
,
Telefon AB - LM Ericsson
� |
Q13/15
� |
2014-03-06 |
|
[ 461 ]
�
� |
Hierarchical connection control in Transport SDN
�
� |
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q14/15, Q12/15
� |
2014-03-06 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):