Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 560 ]
�
� |
Proposal to define and describe wavelength management and control channel in G.multi
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 559 ]
�
� |
Proposal on G.989.2 Amendment for dual-rate PMD implementation
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 558 ]
�
� |
Proposal for revision of cable documents L.10, L. 26, L.43
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q16/15
� |
2014-03-10 |
|
[ 557 ]
�
� |
The possibility of CPRI signal transmission over TWDM-PON system in G.989.3
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 556 ]
�
� |
Thermal Profiles for Telecom Equipment
�
� |
Sprint Corporation
,
Rakon, UK
� |
Q13/15
� |
2014-03-10 |
|
[ 555 ]
�
� |
Proposal for revision of L.53
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2014-03-10 |
|
[ 554 ]
�
� |
G.8271.2: SOAM Assisted Partial Timing Support
�
� |
Sprint Corporation
,
ADVA, Israel
� |
Q13/15
� |
2014-03-10 |
|
[ 553 ]
�
� |
Proposal for new test methods of Hydrogen Aging
�
� |
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
� |
Q5/15
� |
2014-03-10 |
|
[ 552 ]
�
� |
G.8271.2: Budget proposal for Assisted Partial Timing Support
�
� |
Sprint Corporation
,
Calnex, UK
� |
Q13/15
� |
2014-03-10 |
|
[ 551 ]
�
� |
Proposal of draft revised L.25
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2014-03-10 |
|
[ 550 ]
�
� |
Drafting proposal of new recommendation L.91
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2014-03-10 |
|
[ 549 ]
�
� |
Assisted Partial Timing Support Clock
�
� |
Sprint Corporation
� |
Q13/15
� |
2014-03-10 |
|
[ 548 ]
�
� |
Proposal of Appendix for L.omtl
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2014-03-10 |
|
[ 547 ]
�
� |
Proposed Supplement for the guidance to performance measurement by ETH OAM
�
� |
Fujitsu Limited
,
NEC Corporation
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 546 ]
�
� |
Draft guidance to performance measurement by ETH OAM
�
� |
Fujitsu Limited
,
NEC Corporation
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 545 ]
�
� |
Proposed corrections to G.8121 series and G.8151 for alignment
�
� |
Fujitsu Limited
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 544 ]
�
� |
Proposed update items to G.8121 series in align with G.8151 and G.8152
�
� |
Fujitsu Limited
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 543 ]
�
� |
Proposed architecture for MPLS-TP linear protection
�
� |
Fujitsu Limited
� |
Q9/15
� |
2014-03-10 |
|
[ 542 ]
�
� |
2-stage ODU SMP protocol operation in beyond 100G networks
�
� |
Coriant GmbH & Co. KG
� |
Q9/15
� |
2014-03-09 |
|
[ 541 ]
�
� |
Performance analysis of OTUC4 and OTLC4.16 frame alignment
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 540 ]
�
� |
Logical lane format of OTUCn without FEC
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 539 ]
�
� |
FEC options of OTUCn
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 538 ]
�
� |
Proposed mapping for new FC and IB client signals
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 537 ]
�
� |
Proposal for OTUCn, ODUCn and OPUCn Payload bit rates
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 536 ]
�
� |
B100G FEC and logical lane considerations
�
� |
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 535 ]
�
� |
B100G extension of G.709 and G.798
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 534 ]
�
� |
Proposed text for optical layer overhead clauses 15, 15.1, 15.4 and 15.5
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 533 ]
�
� |
Optical layer overhead considerations and proposal for OTN B100G
�
� |
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q6/15, Q11/15
� |
2014-03-09 |
|
[ 532 ]
�
� |
Proposal to add multi-vendor IaDI section layer overhead
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 531 ]
�
� |
Include support for OTM-1 mvIaDI in G.709
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 530 ]
�
� |
Modifications to the text in clause 15.5.4 "OCh OH transport over OTM-1 multi-vendor IaDI"
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-03-09 |
|
[ 529 ]
�
� |
Proposal of Multi-failure processing for ODUsmp
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2014-03-09 |
|
[ 528 ]
�
� |
Proposal of APS signalling transmitting pattern for ODUsmp
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-03-09 |
|
[ 527 ]
�
� |
Number of categories in Rec. ITU-T G.652
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2014-03-09 |
|
[ 526 ]
�
� |
Information and comment on zero-dispersion wavelength of G.652 fibre
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q5/15
� |
2014-03-09 |
|
[ 525 ]
�
� |
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2014-03-08 |
|
[ 524 ]
�
� |
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2014-03-08 |
|
[ 523 ]
�
� |
Withdrawn by submitter
�
Reposted as TD193/PLEN, "Draft revised Recommendation ITU-T G.976 (for Consent, 4 April 2014)"
� |
N/A (no se aplica)
� |
� |
2014-03-08 |
|
[ 522 ]
�
� |
Proposal to discuss optical cables for low-cost sustainable telecommunication infrastructure for remote areas in developing countries
�
� |
The ITU Association of Japan
� |
Q16/15
� |
2014-03-08 |
|
[ 521 ]
�
� |
G.8152 v0.05 Data Dictionary clauses 1.7 - 1.11
�
� |
Alcatel-Lucent USA Inc.
� |
Q14/15
� |
2014-03-08 |
|
[ 520 ]
�
� |
Proposal Work Areas for updating G.8052
�
� |
Alcatel-Lucent USA Inc.
� |
Q14/15
� |
2014-03-08 |
|
[ 519 ]
�
� |
Updates in the G.8271.1
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2014-03-08 |
|
[ 518 ]
�
(Rev.1)� |
Proposal for the Multiplexing of ODU clients into OTUCn
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 517 ]
�
� |
Cyclically Interleaved BCH "Swizzle" FEC for B100G IrDI or MV-IaDI
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 516 ]
�
� |
Timing Distribution with PTP-over-OTN Overhead Proposal
�
� |
PMC-Sierra, Inc.
� |
Q13/15, Q11/15
� |
2014-03-08 |
|
[ 515 ]
�
� |
OTUCn Overhead Byte proposal
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 514 ]
�
� |
Proposal for a scalable OTUCn frame structure
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 513 ]
�
� |
Overview summary of B100G frame format and 400GE client mapping proposals
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 512 ]
�
� |
400GbE client mapping proposals
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 511 ]
�
� |
G.inp: Comparison of L2.1 power reduction methods
�
� |
TQ DELTA. LLC
� |
Q4/15
� |
2014-03-07 |
Resultados :2210 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):