Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 610 ]
�
� |
Draft New Recommendation G.8152: Protocol-neutral management information model for the MPLS-TP network element, version 0.08
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2014-03-10 |
|
[ 609 ]
�
� |
NE Phase/Time Synchronization Supply Management
�
� |
Deutsche Telekom AG
� |
Q14/15, Q13/15
� |
2014-03-10 |
|
[ 608 ]
�
� |
Comments to Recommendation G.8121 (11/2013)
�
� |
Deutsche Telekom AG
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 607 ]
�
� |
IPR statement.
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2014-03-10 |
|
[ 606 ]
�
� |
Threshold Profile Management for OTN
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2014-03-10 |
|
[ 605 ]
�
� |
Proposed corrections to the performance management functions in G.874 Amd 2
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2014-03-10 |
|
[ 604 ]
�
� |
Considerations on control plane derived from G.8080 for G.ODUSMP
�
� |
China Unicom
� |
Q9/15
� |
2014-03-10 |
|
[ 603 ]
�
� |
Proposal on fundamental visor and virtualization in soft-defined transport network
�
� |
China Unicom
� |
Q14/15, Q12/15
� |
2014-03-10 |
|
[ 602 ]
�
� |
Reusing PON-ID as TWDM channel ID
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2014-03-10 |
|
[ 601 ]
�
� |
T-BC Performance with/without SyncE [G.8273.2]
�
� |
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2014-03-10 |
|
[ 600 ]
�
� |
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2014-03-10 |
|
[ 599 ]
�
� |
G.8273.2: T-TSC Specification
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 598 ]
�
� |
G.8273.2: 1pps Performance Requirements
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 597 ]
�
� |
G.8273.2: Noise Generation
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 596 ]
�
� |
G.8273 Annex A Equations
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 595 ]
�
� |
G.8271.1: MTIE Limit for Dynamic Time Error
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 594 ]
�
� |
G.8262: Jitter for Multilane, 40G and 100G Interfaces
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 593 ]
�
� |
G.8260: Definitions of Dynamic Time Error and Maximum Time Error
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 592 ]
�
� |
T-BC Time/phase noise generation [G.8273.2, G.8271.1]
�
� |
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2014-03-10 |
|
[ 591 ]
�
� |
Proposal of a text of non-linear effects compensation in G.sup39
�
� |
Fujitsu Limited
� |
Q6/15
� |
2014-03-10 |
|
[ 590 ]
�
� |
Symbol Braided FEC for OTU4 & Beyond 100G Multi Vendor IaDI & Beyond 100G IrDI (Blacklink)
�
� |
Xilinx Incorporation
� |
Q6/15, Q11/15
� |
2014-03-10 |
|
[ 589 ]
�
� |
Proposed enhancements to G.671 and G.672 to accommodate flexible grid elements
�
� |
Finisar Corporation
� |
Q7/15
� |
2014-03-10 |
|
[ 588 ]
�
� |
G.hn: MPDU priority when including fragments of LLC frames
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-03-10 |
|
[ 587 ]
�
� |
Initial measurement data for the proposed 4L1-9D1F EML application code in G.959.1
�
� |
Finisar Corporation
� |
Q6/15
� |
2014-03-10 |
|
[ 586 ]
�
� |
Proposal for time synchronization requirements
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q2/15, Q13/15
� |
2014-03-10 |
|
[ 585 ]
�
� |
Considerations of Error decorrelator for 100G and beyond FEC
�
� |
Broadcom Corporation
,
ZTE Corporation
� |
Q11/15
� |
2014-03-10 |
|
[ 584 ]
�
� |
Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2014-03-10 |
|
[ 583 ]
�
� |
Consideration about Spectral Excursion in G.698.2
�
� |
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2014-03-10 |
|
[ 582 ]
�
� |
Proposal on B100G OTN mapping and multiplexing structure
�
� |
KDDI Corporation
� |
Q11/15
� |
2014-03-10 |
|
[ 581 ]
�
� |
Considerations about the EVM
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2014-03-10 |
|
[ 580 ]
�
� |
Consideration about a requirement for consistency of switching action in G.mdsp
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-03-10 |
|
[ 579 ]
�
� |
A proposed protection mechanism for a failure use case in G.MDSP
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-03-10 |
|
[ 578 ]
�
� |
G.fast: Comments on link-state transition
�
� |
ZTE Corporation
� |
Q4/15
� |
2014-03-10 |
|
[ 577 ]
�
� |
Proposal for the update of G.8101 Appendix II
�
� |
Hitachi, Ltd.
� |
Q3/15
� |
2014-03-10 |
|
[ 576 ]
�
� |
Proposed updates to currentProblemList in G.8152
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2014-03-10 |
|
[ 575 ]
�
� |
Proposed update MI list to On-demand and Pro-active measurement object class in G.8152
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2014-03-10 |
|
[ 574 ]
�
� |
The proposal about the allocation of OTN Sy nchronisation Message channel (OSMC)
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 573 ]
�
� |
The proposal about the value of K(OTUk) to support OSMC
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 572 ]
�
� |
The method about the frequency of PTP packet in the OSMC
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 571 ]
�
� |
Consideration on the mapping of an ODUj frame into the OPUCn payload
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2014-03-10 |
|
[ 570 ]
�
(Rev.1)� |
consideration of recovery network sinario in MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-10 |
|
[ 569 ]
�
� |
Different switching types in each domain of MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-10 |
|
[ 568 ]
�
(Rev.1)� |
Consideration of Network Objectives in the latest draft of G.mdsp
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-10 |
|
[ 567 ]
�
� |
Measurement results for spectral excursion in 100G DP-QPSK application
�
� |
FiberHome Technologies Group
� |
Q6/15
� |
2014-03-10 |
|
[ 566 ]
�
+Add.1� |
Proposal to start a new work item on optical distribution networks and related system based on ultra dense wavelength division multiplexing
�
Addendum 1 to C-0566 is provided by TSB to correct contact information.
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-03-10 |
|
[ 565 ]
�
� |
Analysis of relationship of NM/Controllerand Application Scenario
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
� |
Q14/15, Q12/15
� |
2014-03-10 |
|
[ 564 ]
�
� |
Multiplexed CPRI over ODUflex efficient mapping
�
� |
China Mobile Communications Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Orange
� |
Q11/15
� |
2014-03-10 |
|
[ 563 ]
�
� |
Proposal for discussion on the revision of Rec. G.975.1
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q8/15
� |
2014-03-10 |
|
[ 562 ]
�
� |
Comments on the title and scope of G.657
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2014-03-10 |
|
[ 561 ]
�
� |
Comments and proposal for the revision of G.650.2
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2014-03-10 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):