Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 660 ]
�
� |
G.8275.1: Frequency based ClockClasses for Option II and III networks
�
� |
Alcatel-Lucent USA Inc.
� |
Q13/15
� |
2014-03-10 |
|
[ 659 ]
�
� |
Proposal to incorporate link design attenuation into ITU-T G.65X Recommendations
�
� |
Corning Incorporated
,
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2014-03-10 |
|
[ 658 ]
�
� |
Recommendation regarding micro-ducts and associated mini cable technology and their application in the access network
�
� |
Corning Incorporated
� |
Q16/15
� |
2014-03-10 |
|
[ 657 ]
�
� |
Updated revision proposal for G.652.E
�
� |
Corning Incorporated
� |
Q6/15, Q5/15, Q2/15
� |
2014-03-10 |
|
[ 656 ]
�
(Rev.1)� |
Comments on G.654.E fibre category proposal
�
� |
Corning Incorporated
� |
Q6/15, Q5/15
� |
2014-03-10 |
|
[ 655 ]
�
� |
Proposal to consent a revision to Recommendation G.8131
�
� |
SK Telecom
� |
Q9/15
� |
2014-03-10 |
|
[ 654 ]
�
� |
IrDI and MV-IaDI FEC format options for "Beyond 100G" OTUCn signals
�
� |
Cortina Systems, Inc.
� |
Q11/15
� |
2014-03-10 |
|
[ 653 ]
�
� |
Performance Metrics of Stair-Case FEC Code proposed for OTU4 and B100G Multi-Vendor IaDI
�
� |
Cortina Systems, Inc.
� |
Q11/15
� |
2014-03-10 |
|
[ 652 ]
�
� |
1588 and SSM messages over native OTN
�
� |
Deutsche Telekom AG
� |
Q11/15
� |
2014-03-10 |
|
[ 651 ]
�
� |
Flexible use of hardware resources to create OTUCn interfaces
�
� |
Deutsche Telekom AG
� |
Q11/15
� |
2014-03-10 |
|
[ 650 ]
�
� |
Consideration on LRM in Transport SDN Controller
�
� |
FiberHome Technologies Group
� |
Q14/15, Q12/15
� |
2014-03-10 |
|
[ 649 ]
�
� |
The future of management and SDN controller
�
� |
FiberHome Technologies Group
� |
Q14/15, Q12/15
� |
2014-03-10 |
|
[ 648 ]
�
� |
Consideration for CCN function model in SDN network
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2014-03-10 |
|
[ 647 ]
�
� |
PDV Templates for testing Partial-Timing Support
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 646 ]
�
� |
Key Performance Indices for APTSC
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 645 ]
�
� |
Explanations regarding Time-Stability Metrics
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 644 ]
�
� |
Use of MATIE on Time Error
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 643 ]
�
� |
G.8273.2: Measurement Appendix
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 642 ]
�
� |
Time Error Deviation (TEDEV)
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 641 ]
�
� |
G.8273.2: Holdover
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 640 ]
�
� |
Maximum Absolute Average Time Error (MAATE)
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 639 ]
�
(Rev.1)� |
Synchronization over OTN network
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-10 |
|
[ 638 ]
�
� |
Test error of PRTC of G.8272
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2014-03-10 |
|
[ 637 ]
�
� |
Proposals for G.8275.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2014-03-10 |
|
[ 636 ]
�
(Rev.1)� |
Effect of lower network limit on PTP slave clock
�
� |
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 635 ]
�
� |
SyncE transient measurement method for G.8273.2
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 634 ]
�
� |
Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 633 ]
�
� |
Physical layer frequency to PTP noise transfer gain peaking in G.8273.2
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 632 ]
�
� |
Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 631 ]
�
� |
Proposal on 21 hops of G.8271.1
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2014-03-10 |
|
[ 630 ]
�
� |
Proposal for Revision of Rec. L.53
�
� |
Huawei Technologies Co. Ltd.
� |
Q17/15
� |
2014-03-10 |
|
[ 629 ]
�
� |
Proposal for Appendix I of L.53
�
� |
Huawei Technologies Co. Ltd.
� |
Q17/15
� |
2014-03-10 |
|
[ 628 ]
�
� |
Proposal for studying intelligent node elements in optical fibre networks
�
� |
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q16/15
� |
2014-03-10 |
|
[ 627 ]
�
� |
G.8263 Appendix I - Flicker/gamma equation formatting fixes
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 626 ]
�
� |
G8263 Appendix I - TDEV illustrating flicker load
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 625 ]
�
� |
Two-way metric Offset Max
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 624 ]
�
� |
Framework for Temperature Performance
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 623 ]
�
(Rev.1)� |
1-stage and 2-stage Re-definition in ODU SMP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 622 ]
�
� |
Message Encoding Set Update for ODU SMP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 621 ]
�
� |
1-stage ODU SMP Protocol
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 620 ]
�
(Rev.1)� |
APS Mechanisms in ODU SMP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 619 ]
�
� |
Proposed functional models in MDSP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 618 ]
�
� |
Interconnection solution for Ethernet linear protection in MDSP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 617 ]
�
� |
Discussion on the scope of potential G.metro Recommendation
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-03-10 |
|
[ 616 ]
�
� |
Discussion on the minimum SMSR for 100G applications in G.698.2
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-03-10 |
|
[ 615 ]
�
� |
Proposal of power budget update in G.973
�
� |
Huawei Technologies Co. Ltd.
� |
Q8/15
� |
2014-03-10 |
|
[ 614 ]
�
� |
G.hn: Proposal for seamless domain merging procedure
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2014-03-10 |
|
[ 613 ]
�
� |
G.hn: Proposal for handover procedure of SC function
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2014-03-10 |
|
[ 612 ]
�
� |
G.hn: Text proposal for SC re-establishment procedure in G.hn
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2014-03-10 |
|
[ 611 ]
�
� |
Spectral excursion for 100Gb/s DP-QPSK modulation format in G.698.2
�
� |
Alcatel-Lucent France
� |
Q6/15
� |
2014-03-10 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):