Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP-6A : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP-6A� C�

UIT-R�WP-6A

Distribution de la Radiodiffusion de Terre

Resultats:485 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 335 ]
Report of activities of Correspondence Group on guidance for the introduction of new DTTB systems, technologies and applications in the broadcasting service � CG.IntroNewtech 2022-09-07
[ 334 ]
Working document towards a preliminary draft revision of Recommendation ITU-R BT.2036-4 - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems � China (People's Republic of) 2022-09-07
[ 333 ]
Working document towards a draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - Introduction of 5G NR MBS in ITU-R Study Group 6 documents � China (People's Republic of) 2022-09-07
[ 332 ]
Proposal for modification of the [preliminary] draft revision to Report ITU-R BT.2049-7 - Broadcasting of multimedia and data applications for mobile reception � China (People's Republic of) 2022-09-07
[ 331 ]
Proposal for modification of the [preliminary] draft revision to Recommendation ITU-R BT.2016-2 - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands � China (People's Republic of) 2022-09-07
[ 330 ]
Proposal for modification of the [preliminary] draft revision of Report ITU-R BT.2295-3 - Digital terrestrial broadcasting systems � China (People's Republic of) 2022-09-07
[ 329 ] �
Document withdrawn and incorporated into Doc. 6A/326 � N/A � 2022-09-07
[ 328 ] �
Document withdrawn and incorporated into Doc. 6A/326 � N/A � 2022-09-07
[ 327 ] �
Document withdrawn and incorporated into Doc. 6A/326 � N/A � 2022-09-07
[ 326 ]
Preliminary draft revision to Report ITU-R BT.2343-8 - Collection of field trials of UHDTV over DTT networks � Korea (Republic of) , United States of America Q133/6 2022-09-07
[ 325 ]
Report of the Correspondence Group on the CISPR radio services database � Chairman, CG on CISPR on radio services database 2022-09-05
[ 324 ]
Update to Working Party 6A (September 2022) � Chairman, RG on RF Hazard 2022-08-30
[ 323 ]
[Working document towards a] [preliminary] draft revision of Recommendation ITU-R BS.1698-0 - Evaluating fields from terrestrial broadcasting transmitting systems operating in any frequency band for assessing exposure to non-ionizing radiation � RG on RF Hazard 2022-08-31
[ 322 ]
Continuation of Rapporteur Group to undertake WRC-23 related studies called for by CPM23-1 � RG for WRC-23 related AIs 2022-08-24
[ 321 ]
Proposed draft reply liaison statement to Working Party 5D (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda item 1.4 � RG for WRC-23 related AIs AI1.4 2022-08-24
[ 320 ]
Progress Report - WRC-23 agenda items 1.4, 1.9, 1.12, and 9.1, topics a) and c) � RG for WRC-23 related AIs AI9.1C), AI9.1A), AI1.9, AI1.4, AI1.12 2022-08-24
[ 319 ]
Report of activities in the Rapporteur Group � RG on WRC-23 AI 1.5 AI 1.5 2022-08-22
[ 318 ]
Preliminary draft revision of Recommendation ITU-R BS.2107-0 - Use of International Radio for Disaster Relief (IRDR) frequencies for emergency broadcasts in the high frequency (HF) bands � HFCC 2022-08-18
[ 317 ]
Proposal for modifications of Report ITU-R BT.2140 � Brazil (Federative Republic of) 2022-08-05
[ 316 ]
Brazilian next-generation digital terrestrial television (Information Document) � Brazil (Federative Republic of) 2022-08-05
[ 315 ]
Liaison statement on ITU testing laboratories recognition procedure � ITU-T SG11 2022-07-19
[ 314 ]
Liaison statement to ITU-T Study Group 5 Question 3/5, ITU-D Study Group 2 Question 7/2 and ITU-R Working Party 6A - Electromagnetic field measurements to assess human exposure � WP 1C 2022-07-18
[ 313 ]
Liaison statement to Working Parties 5A, 5B, 5C and 7A (copy to Working Party 6A for information) - Preliminary draft revision of Report ITU-R SM.2449-0 � WP 1A 2022-07-11
[ 312 ]
Liaison statement on collaboration matters related to EMF for ITU-D Q7/2 and to ITU-R Working Parties � ITU-T SG5 2022-07-08
[ 311 ]
Reply liaison statement on draft revision of Report ITU-R BT.2385 � ITU-T SG5 2022-07-08
[ 310 ]
Reply liaison statement on the revision Recommendation ITU-R BS.1698-0 � ITU-T SG5 2022-07-08
[ 309 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4 � WP 5D AI1.4 2022-07-01
[ 308 ]
Reply liaison statement to ITU-R Study Group 6 - Information on the progress of ITU-R Study Group 6 Rapporteur Group on a Vision for the Future of Broadcasting (RG-FOB) � WP 5D 2022-06-30
[ 307 ]
Liaison statement to ITU-R Study Groups - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � CCT 2022-06-30
[ 306 ]
Liaison statement on call for use cases on testbeds federation � ITU-T (FG-TBFxG) 2022-06-24
[ 305 ]
Vocabulary activities of interest to ITU-R Study Group 6 � Rapporteur to CCV 2022-06-21
[ 304 ]
Reply liaison statement on the activities of Rapporteur Group on a vision for the future of broadcasting � ITU-T SG12 2022-06-20
[ 303 ]
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Software integral to Recommendation ITU-R P.368-9 � WP 3L 2022-06-14
[ 302 ]
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future development of P-series recommendations to address frequencies above 100 GHz � WP 3M 2022-06-14
[ 301 ]
Liaison statement to Working Party 6A - Building entry loss in Band I (47-68 MHz) � WPs 3J, 3K & 3M 2022-06-13
[ 300 ]
Reply liaison statement to Working Party 7C (copy to Working Parties 5A, 5B, 6A, 7B for information) - WRC-23 agenda item 1.12 activities � WP 5C AI1.12 2022-06-13
[ 299 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 5D and 6A) - Resolution ITU-R 59-2 � WP 5A 2022-06-10
[ 298 ]
Liaison statement to Working Parties 7C, 5B, 5C, 6A and 7B (copy to Working Parties 3K, 3L and 3M for information) - Comments on Working Party 7C activities relating to WRC-23 agenda item 1.12 � WP 5A AI1.12 2022-06-06
[ 297 ]
(Rev.1)
Liaison statement to Working Parties 5A, 5B, 5C, 6A and 7B (copy to Working Parties 3K, 3L and 3M for information) - Progress report on the activities relating to WRC-23 agenda item 1.12 � WP 7C AI1.12 2022-05-06
[ 296 ]
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 6A, and 7D - Preliminary draft CPM text on WRC-23 agenda item 9.1, topic a) � WP 7C AI9.1A) 2022-05-06
[ 295 ]
Liaison statement on the outcomes of the first meeting of the ITU-T Focus Group on Testbed Federations for IMT-2020 and beyond (FG-TBFXG) � ITU-T (FG-TBFxG) 2022-04-14
[ 294 ]
+Ch.2-5
Report of the meeting of Working Party 6A (E-meeting, 7-16 March 2022) � Chairman, WP 6A 2022-03-16
[ 293 ]
Final List of Participants - Working Party 6A (E-meeting, 7-16 March 2022) � Director, BR 2022-03-16
[ 292 ]
Liaison statement to Working Party 6B (copy to Working Party 6A) - Proposed communications to other organizations on the work of RG-FOB � WP 6C (RG-FOB) 2022-03-11
[ 291 ]
Liaison statement to Working Parties 6A and 6B drawing attention to the revision of audio related ITU-R Texts � WP 6C 2022-03-11
[ 290 ]
Liaison statement to inform Working Parties 6A and 6B about a webinar on energy aware broadcasting � WP 6C 2022-03-09
[ 289 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 5A and 6A) - Resolution ITU-R 59-2 � WP 5D 2022-03-07
[ 288 ]
List of documents issued (Documents 6A/239; 6A/241 - 6A/288) � BR, Study Groups Department 2022-03-04
[ 287 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4 � WP 5D AI1.4 2022-03-04
[ 286 ]
Preliminary draft revision of Report ITU-R BT.2344-2 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting � RG on SAB/SAP Issues 2022-03-01
Resultats:485 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2024-03-13