Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 83 ]
�
� |
Proposal for a new Recommendation on test procedure for measuring geolocation accuracy based on TDOA - Test procedure for measuring geolocation accuracy based on TDOA
�
� |
China (People's Republic of)
� |
� |
2017-06-02 |
|
[ 82 ]
�
� |
Satellite interferer search with unmanned aerial vehicle
�
� |
China (People's Republic of)
� |
� |
2017-06-02 |
|
[ 81 ]
�
� |
Proposal for a new ITU-R Recommendation on the reporting harmful interference in support of Appendix 10 of the Radio Regulations
�
� |
China (People's Republic of)
� |
Q232/1
� |
2017-06-02 |
|
[ 80 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[SAT-MON] - Measurement techniques and new technologies for satellite monitoring
�
� |
China (People's Republic of)
� |
Q232/1
� |
2017-06-02 |
|
[ 79 ]
�
� |
Proposal for a new Recommendation on test procedure for measuring monitoring system field strength accuracy - Test procedure for measuring monitoring system field strength accuracy
�
� |
China (People's Republic of)
� |
� |
2017-06-02 |
|
[ 78 ]
�
� |
Proposed modification of Report ITU-R SM.2355-0 - Spectrum monitoring evolution
�
� |
Korea (Republic of)
� |
� |
2017-06-02 |
|
[ 77 ]
�
� |
Proposed working document towards a new draft Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure
�
� |
ATDI
,
Rohde & Schwarz GmbH & Co. KG
� |
Q239
� |
2017-05-31 |
|
[ 76 ]
�
� |
Proposed revision to the Annexes of Report ITU-R SM.2257-3 - Spectrum management and monitoring during major events
�
� |
Brazil (Federative Republic of)
� |
� |
2017-05-30 |
|
[ 75 ]
�
� |
Proposed draft revision of Report ITU-R SM.2130 - Inspection of radio stations
�
� |
Brazil (Federative Republic of)
� |
� |
2017-05-30 |
|
[ 74 ]
�
� |
Inclusion of the Brazilian satellite radio monitoring station in the scope of Report ITU-R SM.2182
�
� |
Brazil (Federative Republic of)
� |
� |
2017-05-22 |
|
[ 73 ]
�
� |
Liaison Statement from ITU-D Study Group 1 and the ITU-D/ITU-R Joint Group on WTDC Resolution 9 to ITU-R Working Parties 1B, 1C, 5A and 5D on the Report on WTDC Resolution 9
�
� |
ITU-D SG 1, ITU-R/ITU-D JG on WTDC Res.9
� |
� |
2017-05-18 |
|
[ 72 ]
�
� |
Liaison statement from TDAG to RAG and ITU-R Study Groups 1 and 5 on cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014)
�
� |
TDAG
� |
� |
2017-05-18 |
|
[ 71 ]
�
� |
Liaison statement to TDAG (copy to ITU-R Study Group 1 and to ITU-R Working Parties 5A and 5D for information) - Cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014)
�
� |
Radiocommunication Advisory Group (RAG)
� |
� |
2017-05-01 |
|
[ 70 ]
�
� |
Liaison statement to ITU-R Working Party 1C - Progress on relevant studies on spectrum monitoring evolution in AWG
�
� |
Asia-Pacific Telecommunity
� |
� |
2017-04-20 |
|
[ 69 ]
�
� |
Proposed draft revision of Recommendation ITU-R SM.1268 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations
�
� |
Germany (Federal Republic of)
� |
� |
2017-04-21 |
|
[ 68 ]
�
� |
Liaison statement to Working Party 1C - Remarks and questions concerning the revision of Recommendation ITU-R SM.1875-2
�
� |
WP 6A
� |
� |
2017-04-03 |
|
[ 67 ]
�
� |
Reply to the Note from Working Party 7C (copy to Working Party 1C) - Detection, reporting and resolution of radiofrequency interference to earth exploration-satellite service (passive) sensors
�
� |
Director, BR
� |
� |
2017-03-27 |
|
[ 66 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Study Group 1 Working Party 1A on collaboration - ITU-D Study Group 2 Question 4/2: Assistance to developing countries for implementing conformance and interoperability programmes
�
� |
ITU-D SG 2
� |
� |
2017-03-07 |
|
[ 65 ]
�
� |
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...
�
� |
WP 5D
� |
� |
2017-02-24 |
|
[ 64 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...
�
� |
WP 1B
� |
� |
2016-12-14 |
|
[ 63 ]
�
� |
Reply liaison statement from ITU-R Working Party 1B to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on Resolution 9 draft output Report (copy to ITU-D Study Group 1, ITU-R Working Parties 1C and 5A)
�
� |
WP 1B
� |
� |
2016-12-14 |
|
[ 62 ]
�
� |
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT)
�
� |
WP 1A
� |
Q210/1
� |
2016-12-13 |
|
[ 61 ]
�
� |
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1)
�
� |
WP 1A
� |
Q236/1, Q221/1
� |
2016-12-13 |
|
[ 60 ]
�
� |
Reply liaison statement from ITU-R Working Parties 1A and 1B to ITU-D Study Group 2 Question 9/2 on ongoing collaboration (copy to ITU-R Study Group 1 and Working Party 1C, and copy to ITU-D Study Group 1)
�
� |
WPs 1A and 1B
� |
� |
2016-12-13 |
|
[ 59 ]
�
� |
Reply liaison statement from ITU-R Working Party 1A to ITU-D Study Group 2 Question 4/2 on collaboration (copy for information to ITU-R Study Group 1 and Working Parties 1B and 1C)
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 58 ]
�
� |
Liaison statement from ITU-R /ITU-D Joint Group on WTDC Resolution 9 to ITU-R Study Group 1, Working Parties 1B, 1C and 5A on Resolution 9 Draft Output Report
�
� |
ITU-D SG 1
� |
� |
2016-11-21 |
|
[ 57 ]
�
� |
Reply liaison statement to ITU-D Study Group 2 (copy to Working Parties 1B, 1C, 3L, 4A, 5A, 5C, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields
�
� |
WP 5B
� |
� |
2016-11-18 |
|
[ 56 ]
�
� |
Reply liaison statement to ITU-D Study Group 2, Working Party 1C (copy to Working Parties 1B, 3L, 4A, 5A, 5B, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 55 ]
�
� |
Liaison statement to Working Party 1C - ITU-R Recommendations and Reports on planning criteria, coverage measurements, assessment and evaluation of DVB-T and DVB-T2
�
� |
WP 6A
� |
� |
2016-11-04 |
|
[ 54 ]
�
� |
This document has been withdrawn
�
� |
WP 6A
� |
� |
2016-11-04 |
|
[ 53 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 52 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 51 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT)
�
� |
WP 6A
� |
210-3/1
� |
2016-10-21 |
|
[ 50 ]
�
� |
Liaison statement on Recommendation ITU-R SM.2093-0
�
� |
ITU-T SG 5
� |
� |
2016-10-19 |
|
[ 49 ]
�
� |
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
�
� |
ITU-T SG
� |
� |
2016-10-18 |
|
[ 48 ]
�
� |
ACLR measurements for IMT technologies
�
� |
Canada
� |
� |
2016-08-31 |
|
[ 47 ]
�
(Rev.1)� |
Proposed draft revision of Annex 2 of Report ITU-R SM.2130 - Inspection of radio stations
�
� |
Germany (Federal Republic of)
� |
� |
2016-08-30 |
|
[ 46 ]
�
� |
Proposed draft revision of Report ITU-R SM.2130 - Inspection of radio stations
�
� |
Germany (Federal Republic of)
� |
� |
2016-08-29 |
|
[ 45 ]
�
� |
Reply liaison statement to Working Party 1A (copied to Working Parties 1C, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of other emissions to radiocommunication services
�
� |
WP 3L
� |
� |
2016-07-01 |
|
[ 44 ]
�
� |
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information)
�
� |
WP 5D
� |
� |
2016-06-28 |
|
[ 43 ]
�
� |
Liaison statement to Working Parties 1C and 4A (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals
�
� |
WP 1B
� |
AI9.1
� |
2016-06-20 |
|
[ 42 ]
�
� |
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)
�
� |
WP 1A
� |
Q236/1, Q221/1
� |
2016-06-15 |
|
[ 41 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...
�
� |
WP 1B
� |
� |
2016-06-13 |
|
[ 40 ]
�
� |
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)
�
� |
WP 1B
� |
� |
2016-06-13 |
|
[ 39 ]
�
+Ann.1-15� |
Report of the meeting of Working Party 1C (Geneva, 2 - 9 June 2016)
�
� |
Chairman, WP 1C
� |
� |
2016-06-08 |
|
[ 38 ]
�
� |
Final list of participants - Working Party 1C (Geneva, 2-9 June 2016)
�
� |
Director, BR
� |
� |
2016-06-08 |
|
[ 37 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-06-06 |
|
[ 36 ]
�
� |
List of documents issued (Documents 1C/1 - 1C/36)
�
� |
BR Study Groups Department
� |
� |
2016-06-01 |
|
[ 35 ]
�
� |
Activity Report of the Correspondence Group on the development of a PDN Recommendation ITU-R SM.[STORAGE OF I/Q DATA] on a harmonized data format for the storage of I/Q data
�
� |
Chairman, CG on Storage of I/Q Data
� |
� |
2016-05-30 |
|
[ 34 ]
�
� |
Report of CG work on spectrum monitoring evolution after 2015 meeting of Working Party 1C
�
� |
Chairman, CG on Spectrum Monitoring Evolution
� |
� |
2016-05-30 |
Resultats:233 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):